Have queries on this Project?
28.566611
77.475583
Showing 1 blocks with 599 units
Total Carpet Area
87398.03 m²
940743.66 ft²
Total Units
849
3 different types
Blocks & Floors
1
23 floors across all blocks
Parking
0
0 garages, 0 open
No: Document No. 922, Book No. 1, Volume No. 30012, Page No. 181 to 230. | Date: 08-01-2025
Total Area
10600.00 m²
114097.34 ft²
Not a Plotted development and demarcation will be as per the approved plan.
382.07 m, 1.2 m MS railing above brickwork.
363 m, 6.0 m wide road, 1 lane
NA
Minimum 2 Nos. Connection, Fire Tank 400 KL, Raw Water 100KL, Garden hydrants will be provided, Domestic 100 KL, Soft Sater 100 KL, Source of water Municipal (GNIDA)
Length 276 Mtr., 200 dia pipe size, Gravity Flow, uPVC pipe, Yes Network Design.
Length 325 mtr., 200 dia pipe size, Gravity Flow, RCC pipe for storm water system, excess overflow rain water will connect to municipal drain.
It is a commercial project with 1732.61 sq. mtr. green area, at different place.
65 Trees
Nos. of Pole - 25 and Pole Light - 25 Nos., Transformer - 2 Nos. 2500 KVA Oil Type, 33 KV/433V, LED Type Light, Some solar Light.
Not Applicable
STP 310 KLD, Treatment unit of Screening chamber, Oil and Grease Trap, Equalization tank, Anoxic, FAB, settling tank, sludge holding tank, treated water tank, filter feed tank, pressure sand filter, activated carbon filter, chlorination, filter press. STP Treated water use for flushing, irrigation Soft water as per CPCP, SPCB, MOEF and CC, and NBC 2016 guildelines.
The Solid Waste generated from the project site will be 1.55 TPD. Solid wastes generated will be segregated into 0.73 TPD biodegradable and 0.82 TPD non-biodegradable components and collected in separate bins. The biodegradable wastes will be composted in an onsite composting unit and the manure will be used for landscaping. The non-biodegradable/recyclable wastes will be disposed at GNIDA designated site through authorized vendors.
3 No. Harvasting pit of 3 Mtr. Dia and 2.3 Mtr. Effective Water depth, water-efficient fixtures, Groundwater Recharge through recharge pit WC 4.5/3 LPF, Urinal 1.5 LPF, Health Faucet upto 6 LPM, Kitchen Sink less than 4 LPM, 4 bar Shower Head upto 6 LPM.
Solar Capacity-102.8 KW, Nos of Solar Panel-191 Nos. Renewable Energy used-grid integration
3 Nos. Hydrants at each Floor, Fire exit proposed, sprinklers proposed, fire suppression system proposed automatic, fire suppression system proposed as per NBC 2016, Fire Safety Training will provided.
(07 Male, 07 Female and 07 handicapped toilet) upto 4th floor and 01 nos of toilet for each studio unit (total 555 studios)
03 nos. of gates for site evacuation, 01 on 130 m wide road, 01 on 24 m side road and 01 on paved road. Provision of UGT Storage tanks, firefighting pumps, FHC, wet riser system, sprinklers and OHT.
Approx. 80 nos. CCTV units, 20 benches, landscape for beautification and signage for directions and tectonic tiles and ramps for handicapped.