Launch Date
Completion Date
RERA ID
28.608310
77.457401
complete
complete
CC Road
Stump concrete , tile and stone
GI, UPVC and cpvc
Complete in Tower ABCDEFG. HIJ is in progress
Rcc with drain cover
parks with seating arrangement
Trees as per local climate
NPCL supply and DG installed at site
Rcc building with modern facilities
STP 1650 KLD
Mannualy collection and disposal by Hired Agency
RWH is provided. Recycling and Reuse of waste water.
Solar Pannel installed at site
Fire Fighing , Fire Alarm System
yes
Two staircase in each tower. Exit and entry signage. Three nos gate
Gym and Children recreation
Showing 4 blocks with 634 units
Total Carpet Area
44216.20 m²
475938.76 ft²
Total Units
656
2 different types
Blocks & Floors
4
22 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
72962.00 m²
785355.67 ft²