NEWActive

LANDMARK ONE

GURUGRAM, BADSHAHPUR ST
01-12-2025
Launch Date
NEW
Type
2033-05-31
Completion Date

Overview

Launch Date

01-12-2025

Completion Date

2033-05-31

RERA ID

RERA-GRG-2117-2025

Basic Details

Project NameLANDMARK ONE
Project IDRERA-GRG-2117-2025
Project TypeNEW
Applicant TypeCompany
Submission Date01-12-2025 12:44:53 PM
Builder NameLANDMARK APARTMENTS PRIVATELIMITED
CINU70109DL2006PTC150028
PANXXXX120Q
Emailabhishek.kanodia@landmarkgoc.com
Websitehttp://www.landmarkgoc.com
Phone (Mobile)9650255664
Phone (Landline)01244850000
Registered Address65, SECTOR 44, GURUGRAM
Project AddressSECTOR 67, GURUGRAM
DistrictGURUGRAM
TehsilBADSHAHPUR ST

Bank Details

Bank NameSBI, JAWAHAR VYAPAR BHAWAN, TOLSTOY MARG, NEW DELHI
Account Number44750131612
IFSC CodeSBIN0009601
MICR Code110002188
Branch Code009601

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Sandeep Chhillar : 9210, DLF Phase 4, Gurugram Dinesh Kumar : 310, Sector 45, Gurugram
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Yes

Development Details

Land Area4.43702 (Acre)
Proposed FAR2.54
Permissible FAR2.54
Total Licensed Land8.3125 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS8234.04
CONSTRUCTION OF ROADS3786
PAVEMENTS364
PARKS AND PLAYGROUNDS0
GREEN BELTS950
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION60
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES4480.966
ANY OTHER0
HSD YARD75
GUARD ROOM6
Total17956.006

Cost Details

Land Cost1430.71 Lakhs
Other Cost14417.44 Lakhs
Estimated Project Cost65666.95 Lakhs
Estimated Infrastructure Cost5224.40 Lakhs
Estimated Apartment Construction Cost44594.40 Lakhs

Documents

DEMARCATION PLAN

Uploaded on: 30-11-2025

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 01-12-2025

ZONING PLAN

Uploaded on: 30-11-2025

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 30-11-2025

PROMOTER'S AFFIDAVIT FOR BANK ACCOUNT REGULATIONS-67

Uploaded on: 07-01-2026

SALE DEED 8K 8M

Uploaded on: 07-01-2026

SECTION PLAN

Uploaded on: 07-01-2026

DEMAND DRAFT - REGISTRATION, PROCESSING & LATE

Uploaded on: 07-01-2026

BR FOR AUTHORIZING

Uploaded on: 07-01-2026

ESCROW ACCOUNT AGREEMENT

Uploaded on: 07-01-2026

SALE DEED 13K 7M

Uploaded on: 07-01-2026

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 07-01-2026

SALE DEED 1K 1M

Uploaded on: 07-01-2026

BUILDING PLANS APPROVAL LETTER-67-2ND PHASE

Uploaded on: 07-01-2026

CA CERTIFICATE OF NET WORTH OF PROMOTER ON LATEST DATE

Uploaded on: 07-01-2026

DRAFT APPLICATION FORM

Uploaded on: 07-01-2026

BR LAPL OPENING OF CURRENT AC

Uploaded on: 07-01-2026

SALE DEED 33K 8M

Uploaded on: 07-01-2026

TITLE SEARCH REPORT

Uploaded on: 07-01-2026

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 07-01-2026

SUPERIMPOSED KHASRA PLAN-2ND PHASE-67

Uploaded on: 07-01-2026

JAMABANDI

Uploaded on: 07-01-2026

MUTATION

Uploaded on: 07-01-2026

APPROVED PHASING -LETTER AND DRAWING

Uploaded on: 07-01-2026

BANK UNDERTAKING

Uploaded on: 07-01-2026

SALE DEED 4K 4M

Uploaded on: 07-01-2026

LOI CYBER PARK

Uploaded on: 07-01-2026

AKS SIZRA

Uploaded on: 07-01-2026

DRAFT PAYMENT RECEIPT

Uploaded on: 07-01-2026

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 07-01-2026

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 07-01-2026

PERT CHART

Uploaded on: 07-01-2026

SALE DEED 16K 15.5M

Uploaded on: 07-01-2026

LITIGATION DETAILS

Uploaded on: 07-01-2026

LC-IV - 67

Uploaded on: 07-01-2026

PROJECT REPORT

Uploaded on: 07-01-2026

PARKING PLAN

Uploaded on: 07-01-2026

DRAFT ALLOTMENT LETTER

Uploaded on: 07-01-2026

CA CERTIFICATE OF EXPENDITURE INCURRED AND TO BE INCURRED

Uploaded on: 07-01-2026

IGBC CERTIFICATE-LANDMARK ONE

Uploaded on: 07-01-2026

SALE DEED 3K 10M

Uploaded on: 07-01-2026

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 07-01-2026

PREVIOUS SITE PLAN

Uploaded on: 07-01-2026

DRAFT BUILDER BUYER AGREEMENT

Uploaded on: 07-01-2026

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 07-01-2026

DRAFT CONVEYANCE DEED

Uploaded on: 07-01-2026

COMPARISON OC VS REVISED

Uploaded on: 07-01-2026

BG - EC, FIRE, SPE

Uploaded on: 07-01-2026

ELEVATIONS_11ZON

Uploaded on: 07-01-2026

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 07-01-2026

NON-ENCUMBRANCE CERTIFICATE

Uploaded on: 07-01-2026

SITE PLAN-2ND PHASE-67

Uploaded on: 07-01-2026

Statutory Approvals

LICENSEDate: 12-05-2008Status: ALREADY BEEN OBTAINED
DEMARCATION-CUM-ZONING AND PHASING PLANDate: 09-09-2025Status: ALREADY BEEN OBTAINED
BUILDING PLANSDate: 27-11-2025Status: ALREADY BEEN OBTAINED
AAI-NOCDate: 07-11-2025Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSYET TO BE PREPARED
WATER SUPPLY SYSTEMYET TO BE PREPARED
STORM WATER DRAINAGEYET TO BE PREPARED
ELECTRICITY SUPPLY SYSTEMYET TO BE PREPARED
SEWAGE TREATMENT & GARBAGE DISPOSALYET TO BE PREPARED
STREET LIGHTINGYET TO BE PREPARED
SECURITY AND FIRE FIGHTINGYET TO BE PREPARED
PLAYGROUNDS AND PARKSYET TO BE PREPARED
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED
STPYET TO BE PREPARED
UNDERGROUND WATER TANKYET TO BE PREPARED
RAIN WATER HARVESTINGYET TO BE PREPARED
ELECTRICAL SUB STATIONYET TO BE PREPARED

NOC

ROADSProvider: GMDAApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

ABHISHEK KANODIA
Name
ABHISHEK KANODIA
PAN
XXXX066Q
Email
abhishek.kanodia@landmarkgoc.com
Mobile
9650255664
Landline
01244850000
Address
170 Sector 47 Gurgaon

Managing Director/CEO

SANDEEP CHHILLAR
Name
SANDEEP CHHILLAR
PAN
XXXX220E
Email
sandeep.chhillar@landmarkgoc.com
Mobile
9811509135
Landline
01244850000
Address
9210 DLF Phase 4 Gurugram

Directors

SANDEEP CHHILLAR
Name
SANDEEP CHHILLAR
PAN
XXXX220E
Email
sandeep.chhillar@landmarkgoc.com
Mobile
9811509135
Landline
01244850000
Address
9210 DLF Phase 4 Gurugram
DINESH KUMAR
Name
DINESH KUMAR
PAN
XXXX150G
Email
dinesh.kumar@landmarkgoc.com
Mobile
9811111161
Landline
01244850000
Address
310 Sector 45 Gurugram

Contact Details

Project ContactEmail: info@landmarkgoc.comMobile: 9818794949Landline: 0000000000
Project Contact PersonName: NARENDER MALIKEmail: n.malik@landmarkgoc.comMobile: 9818794949Landline: 1244850000

Land Details

Land Area4.43702 (Acre)
Proposed FAR2.54
Permissible FAR2.54
Total Licensed Land8.3125 (Acre)

Land Usage

Land Cost1430.71 Lakhs
Other Cost14417.44 Lakhs
Estimated Project Cost65666.95 Lakhs
Estimated Infrastructure Cost5224.40 Lakhs
Estimated Apartment Construction Cost44594.40 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0-00
Electrical Sub Station----
Electricity Supply System0-00
Other0-00
Parks and Playgrounds0-00
Rainwater Harvesting----
Renewable Energy System----
Roads & Pavements0-00
STP----
Security and fire fighting----
Sewerage treatment & garbage disposal0-00
Shopping area0-00
Storm Water Drainage0-00
Street Lighting----
Underground Water Tank----
Water Supply System0-00
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub Station----
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Rainwater Harvesting----
Renewable Energy System----
Roads & Pavements0000
STP----
Security and fire fighting----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Lighting----
Underground Water Tank----
Water Supply System0000
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub Station----
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Rainwater Harvesting----
Renewable Energy System----
Roads & Pavements0000
STP----
Security and fire fighting----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Lighting----
Underground Water Tank16161616
Water Supply System0000
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub Station----
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Rainwater Harvesting----
Renewable Energy System----
Roads & Pavements0000
STP----
Security and fire fighting----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Lighting----
Underground Water Tank----
Water Supply System0000
2030 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub Station----
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Rainwater Harvesting----
Renewable Energy System----
Roads & Pavements0000
STP----
Security and fire fighting----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Lighting----
Underground Water Tank----
Water Supply System0000
2031 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub Station----
Electricity Supply System000270
Other0000
Parks and Playgrounds0000
Rainwater Harvesting----
Renewable Energy System----
Roads & Pavements0000
STP----
Security and fire fighting----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Lighting----
Underground Water Tank----
Water Supply System0000
2032 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub Station0860860860
Electricity Supply System270270270270
Other0000
Parks and Playgrounds001818
Rainwater Harvesting026260
Renewable Energy System00035
Roads & Pavements003939
STP003838
Security and fire fighting2502502500
Sewerage treatment & garbage disposal063630
Shopping area0000
Storm Water Drainage2220
Street Lighting0000
Underground Water Tank----
Water Supply System036360
2033 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres00--
Electrical Sub Station----
Electricity Supply System00--
Other00--
Parks and Playgrounds00--
Rainwater Harvesting----
Renewable Energy System----
Roads & Pavements00--
STP----
Security and fire fighting----
Sewerage treatment & garbage disposal00--
Shopping area00--
Storm Water Drainage00--
Street Lighting----
Underground Water Tank----
Water Supply System00--

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES
WALL FINISHING DETAILSACRYLIC EMULSION PAINT
KITCHEN DETAILSN.A.
BATHROOM FITTINGSCERA/ HINDWARE OR EQUIVALENT
WOOD WORK ETCAS PER MARKET STANDARDS
DOORS AND WINDOS FRAMESAS PER MARKET STANDARDS
GLASS WORKAS PER MARKET STANDARDS
ELECTRIC FITTINGSISI MARK FITINGS
CONDUCTING AND WIRING DETAILSISI MARK FITINGS
CUPBOARD DETAILSN.A.
WATER STORAGEN.A.
LIFT DETAILSJONSON OR EQUIVALENT
EXTERNAL GLAZINGSAS PER MARKET STANDARDS
WINDOWS/GLAZINGSAS PER MARKET STANDARDS
DOORSAS PER MARKET STANDARDS
MAIN DOORSAS PER MARKET STANDARDS
INTERNAL DOORSAS PER MARKET STANDARDS
AIR CONDITIONINGN.A.
ELECTRICAL FITTINGSISI MARK FITINGS
CNG PIPE LINEN.A.
PROVISION OF WIFI AND BROADBAND FACILITYN.A.
EXTERNAL FINISHING/COLOUR SCHEMETEXTURE PAINT OR AS PER ELEVATION
INTERNAL FINISHINGAS PER MARKET STANDARDS

Unit-wise Specifications

TOILET
FLOORVITRIFIED TILES ANTI SKID
WALLSACRYLIC EMULSION PAINT
CEILINGACRYLIC EMULSION PAINT
COUNTERSN.A.
SANITARY WARE/CP FITTINGSCERA/ HINDWARE OR EQUIVALENT
FIXTURESMODERN STEEL TAPS & FIXTURE
KITCHEN
FLOORN.A.
WALLSN.A.
CEILINGN.A.
COUNTERSN.A.
FIXTURESN.A.
KITCHEN APPLIANCESN.A.
SIT-OUTS
FLOORVITRIFIED TILES
WALLS & CEILINGTEXTURE PAINT OR AS PER ELEVATION
RAILINGSAS PER MARKET STANDARDS
FIXTURESAS PER MARKET STANDARDS
BED ROOMS
FLOORN.A.
WALLSN.A.
CEILINGN.A.
WARDROBESN.A.
MASTER TOILET
FLOORVITRIFIED TILES ANTI SKID
WALLSACRYLIC EMULSION PAINT
CEILINGACRYLIC EMULSION PAINT
COUNTERSGRENITE
SANITARY WARE/CP FITTINGSCERA/ HINDWARE OR EQUIVALENT
FITTING/FIXTURESMODERN STEEL TAPS & FIXTURE
MASTER BEDROOM/DRESSROOM
FLOORN.A.
WALLSN.A.
CEILINGN.A.
MODULAR WARDROBESN.A.
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORN.A.
WALLSN.A.
CEILINGN.A.
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORN.A.
WALLS & CEILINGN.A.
TOILETN.A.
BALCONYN.A.

Fee Details

Payment 1
amount:100000
cheque no:494261
draft date:28-11-2025
payable to:HRERA Gurugram
payee bank:KARNATAKA BANK LTD
Payment 2
amount:424464
cheque no:494338
draft date:24-12-2025
payable to:HRERA Gurugram
payee bank:KARNATAKA BANK LTD
Payment 3
amount:2664276
cheque no:178107
draft date:24-12-2025
payable to:HRERA Gurugram
payee bank:KARNATAKA BANK LTD
Payment 4
amount:19362150
cheque no:178108
draft date:02-01-2026
payable to:HRERA Gurugram
payee bank:KARNATAKA BANK LTD