Have queries on this Project?
Land Area
Project Size
Density
Unit Configurations
Size
Total Floors
RERA Received
RERA Completion
Launch Price
Current Price
RERA ID
Eldeco Terra & Sol is a residential project by Eldeco in Sector 80, Manesar, Gurugram. Set across 2.70 acres, Eldeco Terra & Sol is a 2-tower project rising to 30 floors, with 224 residences. The configurations are 3 BHK homes and penthouse duplexes, with super areas from 2,150 sq ft to 4,300 sq ft. An entry 3 BHK works out to around ₹2.90 crore on base price. The project is at Plot 3A, Sector 80, Manesar, registered with HARERA under RERA-GRG-2160-2026, granted on 22 January 2026.
The honest read on it: this is a decent, sensible product rather than a flashy one, and that is exactly its appeal to the buyer it is built for. The sizes are well-judged, 3 BHK homes from 2,150 sq ft to 2,450 sq ft, and the developer carries a 3-plus-decade delivery record. At this price point, that track record matters more than almost anything else, because the people buying here are genuine homebuyers putting most of their wealth into a single home.
Why Sector 80 and the HSIIDC Township
The strongest part of the case here is the location, and specifically the kind of sector this is. Sector 80 is an HSIIDC-planned township, which is a meaningfully different product from a typical Gurugram sector. The infrastructure is designed up front rather than retrofitted: 30-metre wide internal roads, its own 2 acre clubhouse, a 10 acre forest area, a school, a dedicated fire department, and a fully worked-out drainage system already planned into the layout.
Just as importantly, it is an all-private-development township with no village settlement inside it, which keeps the character consistent and is a real differentiator in a city where many sectors are a patchwork. It sits in close proximity to NH-48, the Delhi-Jaipur Expressway, giving it strong onward connectivity. For a buyer thinking long term, a pre-planned HSIIDC township with this kind of built-in infrastructure is the sort of address that tends to come into its own as it matures, and there is real reason to be positive about how Sector 80 develops from here.
Specifications at a Glance
BSP only. GST, PLC, Parking, IFMS could be add ons.
Get Full Cost BreakupUploaded on: 21-01-2026
Uploaded on: 22-01-2026
Uploaded on: 21-01-2026
Uploaded on: 06-03-2026







Infrastructure Total Expenditure
No total expenditure data is currently available for this project.
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 100 |
| Electricity Supply System | 0 | 0 | 0 | 0 |
| Other | 124 | 215 | 430 | 330 |
| Parks and Playgrounds | 0 | 0 | 0 | 0 |
| Roads & Pavements | 0 | 0 | 0 | 0 |
| Sewerage treatment & garbage disposal | 0 | 0 | 0 | 0 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 0 | 0 |
| Water Supply System | 0 | 0 | 0 | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 100 | 100 | 100 | 100 |
| Electricity Supply System | 0 | 0 | 0 | 0 |
| Other | 520 | 640 | 640 | 430 |
| Parks and Playgrounds | 0 | 0 | 0 | 0 |
| Roads & Pavements | 0 | 0 | 0 | 0 |
| Sewerage treatment & garbage disposal | 0 | 0 | 0 | 0 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 0 | 0 |
| Water Supply System | 0 | 0 | 0 | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 100 | 100 | 100 | 100 |
| Electricity Supply System | 0 | 0 | 0 | 0 |
| Other | 580 | 590 | 670 | 370 |
| Parks and Playgrounds | 0 | 0 | 0 | 0 |
| Roads & Pavements | 0 | 0 | 0 | 0 |
| Sewerage treatment & garbage disposal | 0 | 0 | 0 | 3 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 0 | 10 |
| Water Supply System | 0 | 0 | 0 | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 100 | 100 | 200 | 200 |
| Electricity Supply System | 100 | 0 | 200 | 200 |
| Other | 370 | 520 | 641 | 450 |
| Parks and Playgrounds | 0 | 0 | 10 | 50 |
| Roads & Pavements | 5 | 5 | 5 | 5 |
| Sewerage treatment & garbage disposal | 3 | 100 | 10 | 10 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 10 | 10 | 10 | 7 |
| Water Supply System | 10 | 10 | 10 | 12 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 200 | 200 | 200 | 185 |
| Electricity Supply System | 224 | 200 | 200 | 200 |
| Other | 490 | 600 | 657 | 485 |
| Parks and Playgrounds | 100 | 137 | 100 | 100 |
| Roads & Pavements | 5 | 0 | 0 | 0 |
| Sewerage treatment & garbage disposal | 10 | 10 | 20 | 11 |
| Shopping area | 6 | 6 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 0 | 0 |
| Water Supply System | 10 | 20 | 20 | 0 |
Plot 3A, Sector 80, Manesar, Gurugram, inside an HSIIDC-planned township with direct access to NH-48.
Yes, under HARERA registration RERA-GRG-2160-2026, granted 22 January 2026. We recommend verifying it directly on the HARERA portal.
It is an HSIIDC-planned township with pre-designed infrastructure, 30-metre internal roads, its own clubhouse, fire department, school, forest area and a fully planned drainage system. It is an all-private-development sector with no village settlement inside it, close to NH-48.
3 BHK residences (2,150-2,450 sq ft) and penthouse duplexes, with super areas up to 4,300 sq ft.
An entry 3 BHK is around ₹2.90 crore on base price (roughly ₹13,500 per sq ft). Final all-in cost depends on unit, floor and add-ons, and is shared on request.
Developed by
20 Projects
EXECUTIVE SUMMARY Eldeco Group is one of North India's oldest and most established real estate developers, with origins tracing back to 1975 and formal incorporation of its flagship listed entity, Eldeco Housing and Indu…
Know More about Eldeco