Launch Date
Completion Date
RERA ID
28.535457
77.494848
Not applicable
2100 mm high, along entire periphery.
Trimix /BLACK TOP
Stone and Enterlocking tile
OHT OF DOMESTIC TANK ARE AS FOLLOWINGS : Tower A - 57 KL Tower B - 57 KL Tower c - 57 KL Tower D - 57 KL, Under ground water tanK-650 KL
Underground system using NP-3 Sewer pipes.
Underground system using NP-3 pipes.
Parks having total area of Aprox 45000sq. m. shall be provided.
APROX 5000Nos. trees are to be planted out of that 50% will be evergreen tree.
Two Electricity Transformers of 5500 KVA capacity each shall be used along with necessary switch-gear for distributing electricity at LT voltage .
work in progress complition date march 2019
STP of capacity 1500 KLD shall be provided. Treated water shall be used for flushing, irrigation, pathways cleaning and excess sewage shall be discharged in the municipal sewer.
Manual collection and organic waste converter shall be provided.
32 No. sets of recharge Pits (4.5 x 1.75 x 2m effective depth) and desilting tank (2.5 x 1.75 x 2 m effective depth) shall be provided.
Solar panels shall be provided on terrace for renewable energy. 30 kw solar backup has been proposed. Single point metering will be there for energy purchased from the grid/ power supply company.
Fire tender path shall be provided as per NBC. Fire fighting systems along with pumps and UGT of Fire tank capacity (250+250+80)KL (common) and OHT of Fire tank capacity 20KL (each block) shall be provided as per NBC & NOC from fire depp.
STP, WTP , waiting lounge club etc, club work is in progress and other are completed
Staircases shall be provided In Basement & all the Towers for fire/ emergency exit as per NBC.
Not applicable
Showing 4 blocks with 265 units
Total Carpet Area
57840.90 m²
622593.66 ft²
Total Units
936
2 different types
Blocks & Floors
4
27 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
251560.00 m²
2707766.68 ft²