Our project is of residential high rise apartments and not of sale of plots, demarcation of plots not applicable in our project, further demarcated land for our project is allotted by Greater Noida Authority
Project’s three side boundary wall is completed and front portion boundary wall is under progress
Partial road work is completed, remaining work is under progress
Footpath work is under progress
Water supply work is completed for tower A, B and C subject to final connection with Ganga water supply, separate RO will be provided to each flat occupant at the time of possession.
Sewer system is completed to the extent for Tower A to F and line is ready for connection with Government line from the point of project
Drainage facility is completed to the extent for Tower A to F
Creation of foundation for park area is under progress
Tree plantation shall be commenced on the date of completion of creation of foundation of park area
Design work of all electric supply is completed
Work of super structure of community building is completed to the extent of two floors out of three floors.
The project shall have provision of STP water treatment tank. Remains of the STP WATER TREATMENT tank shall be re-used for making compost and water for plantation and flushing use. After connection of Government sewage line with project line, all completely non-reusable remain waste shall be disposed into Government line.
The shall be managed as per hazardous waste (Management handing and trans boundary movement) Rules 2008 as amended and disposed – off through authorized recycler.
All STP output water shall be used either for plantation or flush re-use, further rain water harvesting completed for tower A to C as per CGWB guidelines, auto cut system enabled motors shall be used for refilling overhead tanks.
Every flat shall have separate energy meter so that every occupant may manage energy efficiently, use of LED lights in common area, use of solar energy for common area lights, use of solar geyser in project.
Proper provision of movement of fire fighting vehicles around all towers, fire protection system in each flat completed in 8 towers and basements (covering tower A to C) except installation of fire alarm and sprinkler, completion of fire fighting pump room is under progress.
All work are under progress, shall be completed after completion of park work.
Provision of second staircase in every tower, completed in 9 towers out of 11 towers.
All other miscellaneous work is under progress, and shall be completed before possession.
Showing 12 blocks with 1448 units
Total Carpet Area
99690.76 m²
1073061.37 ft²
Total Units
1463
5 different types
Blocks & Floors
12
27 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
33537.00 m²
360988.91 ft²