"As per location of Plot : (1) Townhomes - 1 to 30 NE - Approach Road SE - Social Club SW - Group Housing NW - Group Housing (2) Townhomes - 48 to 57 NE - Golf Course SE - Approach Road SW - Approach Road (3) Townhomes - 106 to 127 NE - Approach Road / Golf Course SE - Group Housing SW - Group Housing NW - Group Housing The Plot has been demarcated"
"This Project is part of Wish Town Township. The over all boundary wall of Town Township has been constructed except few Passages. The Town Homes are part of cluster planning designed for B-4 residential Group Housing. This development is mix of residential towers and Town Homes. It is integrated and interlinked with way of landscaping, internal roads, jogging and cycling track, pathways etc. The Town Homes have been constructed on their respective identified plots and there is no boundary wall for the clusters of Town Homes."
"The approach roads to all Town Homes are completed. "
The pedestrian footpaths with Kerb Stone as per Landscape Plan have been completed at Township level. The foot paths for Town Homes shall be constructed before completion of Town Homes.
"The pipe lines for water supply have been laid and completed at Township Level. The drinking water is being supplied through water centres after necessary treatments. The tapping points for individual Town Homes are available and the same shall be connected before completion of Town Homes. "
"The pipe lines for Sewer System have been laid and completed at Township Level. The Sewage is being treated at Sewerage Treatment Plant. The tapping points for individual Town Homes are available and the same shall be connected before completion of Project."
"The drainage system has been laid and completed at Township Level. The drainage water is being collected in lakes of Golf Courses. The tapping points for individual Town Homes are available and the same shall be connected before completion of Town Homes."
"Parks / Play fields are planned at Township Level and are not applicable at Town Homes level. "
"Tree planting as per approved landscape plan at township level is complete. The tree planting at Town Homes level shall be done as and when required before completion of Town Homes."
"The electric supply from Grid Sub Station as planned for Wish Town is complete. The tapping points for individual Town Homes are available and the same shall be connected before completion of Town Homes."
Not Applicable
"The sewage will be treated at Sewerage Treatment Plant. The sullage will be converted into compost. The sullage water after necessary treatment will be supplied for flushing, irrigation and landscaping. "
"The solid waste collected from door to door of Town Homes will be transferred to segregation centres planned / constructed at Sewerage Treatment Plant at Township level. The segregated waste is being transported through facility management maintenance company to the identified sites of Noida Authority for necessary disposal."
Treated water from Sewerage Treatment Plant is being used for irrigation and flushing.
As per approved environment impact assessment authority advice
The Fire Station with all the infrastructure facilities and staff has been provided at Township level. Town Homes s are being provided with all the provisions of Fire Protection & Safety System as laid down in respective fire approval from the fire department.
At township level, 500 hundred Bed Super Speciality Hospital, Jaypee Institute of Information & Technology, Jaypee Public School, Temples, Convenient Shopping facilities, Club facilities etc. have already been provided
Town Homes are G + 2 structures hence fire staicase is not required for such low height development.
At Township Level Sewerage Treatment Plant & Service Centres, Electric Sub station with DG Power Backup, Fire Station, Parks & Playgrounds have been provided.
Showing 52 blocks with 209 units
Total Carpet Area
17512.85 m²
188506.57 ft²
Total Units
187
1 different types
Blocks & Floors
52
4 floors across all blocks
Parking
104
0 garages, 104 open
Total Area
13458.00 m²
144860.57 ft²