"Location of Plot : North - Golf Course South - Road East - Sun Court A West - Sun Court C The Plot has been demarcated as per approved Layout Plan of Land 1 Jaypee Greens, Greater Noida. Status: Demarcation complete."
"The Sun Court B is part of Project Jaypee Greens Land-1, Sector 19 & 25, Greater Noida. The Over all Boundary Wall of of entire development has been Constructed. Being gated community, separate boundary wall for the Sun Court B is not proposed."
"The Approach Road to the project is Completed. The Internal Roads Connecting the Tower is paertly completed."
The Pedestrian Foot Paths with Concrete Pavers with Kerb Stone along the road as per Layout plan has been completed.
"The Pipe Lines for Water Supply of the over all Jaypee Greens (which includes Sun Court B)has been laid and functional. Water supply is being made from water treatment plant. Tower water supply system shall be from pumping station proposed in Basement."
"Sewer System for the over all Jaypee Greens (which includes Sun Court B) has been laid and functional and Sewerage Treatment Plant is operational. Vertical System of Tower shall be connected to nearest Man Hole."
"The Drainage System for the over all Jaypee Greens (which includes Sun Court B)has been laid and functional. The Drainage Water is being Collected in Lakes of Golf Courses for the purpose of rain water harvesting. Tower Drainage shall be connected to project level drainage system."
Parks / landscaped areas has been developed and completed as per Approved Landscape plan for the Tower as well as for the entire development.
The Tree Planting has been completed as per Approved Landscape Layout for the Tower as well as for the entire development.
Receiving Sub Station and External Electrical System with Street Lighting is completed and operational. Electric Sub Station for Sun Court B shall be provided in Basement for which Power supply shall be provided from Receiving Sub Station.
Community buildings for the over all Jaypee Greens (which includes Sun Court B) has been completed. Swimming pool , Steam and sauna, Theater for privet screening, indoor games room and convenio shop etc for the Tower are under progress.
The Sewage for Jaypee Greens ( which include Sun Court B) is being treated at Sewerage Treatment Plant. The Sullage is being Converted into Compost. The Sullage Water after necessary treatment is being Supplied for Irrigation of Landscaped greens.
"The Solid Waste collected from door to door apartments will be Transferred to Segregation Centres. The Segregated waste is being transported through facility management maintenance company to the identified sites of Noida Authority for necessary disposal."
Treated Water from Sewerage Treatment Plant is being used for irrigation.
Automated (Timer based) system for LED street lighting and irrigation works has being provided.
Fire Station with all the infrastructure facilities and staff has been provided. Towers and basements are being provided with all the provisions of Fire Protection & Safety System as laid down in respective fire approval from the fire department.
Convenient Shopping facilities, Integrated sports complex, School, Club facilities etc. have already been provided.
Fire Escape Staircases are provided in Tower and Basements as per Norms laid down in respective fire approval of the fire Department.
Receiving Sub Station, Electric Sub station with DG Power Backup, Fire Station, Telephone Exchange, FTTH System are completed and operational. Parks & Playgrounds are completed and are in use. Completion for all the services have been obtained from Statutory Authorities.
Showing 1 blocks with 61 units
Total Carpet Area
15616.66 m²
168096.17 ft²
Total Units
60
3 different types
Blocks & Floors
1
32 floors across all blocks
Parking
197
197 garages, 0 open
Total Area
5128.00 m²
55197.28 ft²