"As per location of Plot : NE - Group Housing SE - Approach Road SW - 24 M wide Master Plan Road NW - Group Housing The Plot has been demarcated"
"This Project is part of Wish Town Township. The over all boundary wall of Town Township has been constructed except few Passages. The Pavilion Heights Arcade is part of cluster planning designed for B-4 residential Group Housing. This development is mix of residential towers and convenient shopping. It is integrated and interlinked with way of landscaping, internal roads, jogging and cycling track, pathways etc. The Pavilion Heights Arcade has been constructed on its respective identified plot with boundary wall on three sides. "
"External and internal roads work of the project is completed. "
The pedestrian footpaths with Kerb Stone as per Landscape Plan have been completed at Township level. The foot paths for Pavilion Heights Arcade are complete.
"The pipe lines for water supply have been laid and completed at Township Level. The drinking water is being supplied through water centres after necessary treatments. The required water supply connection has been provided. "
"The pipe lines for Sewer System have been laid and completed at Township Level. The Sewage is being treated at Sewerage Treatment Plant. The required sewer system connection has been provided. "
"The drainage system has been laid and completed at Township Level. The drainage water is being collected in lakes of Golf Courses. The required drainage connection has been provided. "
"Parks / Play fields are planned at Township Level and are not applicable at convenient shopping level. "
"Tree planting as per approved landscape plan at township level is complete. The tree planting work is complete for Pavilion Heights Arcade. "
"The electric supply from Grid Sub Station as planned for Wish Town is complete. The required electrical connection has been provided. "
Not Applicable
"The sewage will be treated at Sewerage Treatment Plant. The sullage will be converted into compost. The sullage water after necessary treatment will be supplied for flushing, irrigation and landscaping. "
"The solid waste collected from Imperial Arcade shops will be transferred to segregation centres planned / constructed at Sewerage Treatment Plant at Township level. The segregated waste is being transported through facility management maintenance company to the identified sites of Noida Authority for necessary disposal."
Treated water from Sewerage Treatment Plant is being used for irrigation and flushing.
As per approved environment impact assessment authority advice
The Fire Station with all the infrastructure facilities and staff has been provided at Township level. The Pavilion Heights Arcade has been provided with all the provisions of Fire Protection & Safety System as laid down in respective fire approval from the fire department.
At township level, 500 hundred Bed Super Speciality Hospital, Jaypee Institute of Information & Technology, Jaypee Public School, Temples, Convenient Shopping facilities, Club facilities etc. have already been provided
Pavilion Heights Arcade is single storey structure hence fire staicase is not required for such low height development.
At Township Level Sewerage Treatment Plant & Service Centres, Electric Sub station with DG Power Backup, Fire Station, Parks & Playgrounds have been provided.
Showing 1 blocks with 4 units
Total Carpet Area
135.25 m²
1455.82 ft²
Total Units
9
2 different types
Blocks & Floors
1
2 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
89.00 m²
957.99 ft²