28^ 22' 04'
77^ 32' 00'
"As per location of Plot : NE - Insitutional plot SE - 28 M Wide Master Plan Road SW -24 M Wide Master Plan Road NW -Insitutional/Green The Plot has been demarcated"
"This Project is part of Sports City Township. The over all boundary wall / fencing of the Township has been constructed except few Passages. Cluster boundary wall of the project has been planned and the same shall be constructed along with the completion of construction of all of the towers."
"The 30 M wide approach road to the project is completed. The internal roads connecting the towers have been planned as per submission drawings. The internal roads shall be constructed before completion of Project."
The pedestrian footpaths with Kerb Stone as per Landscape Plan have been planned and the same shall be constructed before completion of Project
"The pipe lines for water supply have been partially laid at Township Level. The drinking water is avaialable and is being supplied through water centre after necessary treatments as and when required. The tapping points for individual towers shall be made available and the same shall be connected before completion of Project. "
The internal drain system is planned to be completed before completion of the project . The pipe lines for Sewer System have been planned at Township Level. The tapping points will be completed as and when required along with completion of project and occupancy of residents thereof. The facility for treating sewage is available at the Sewage Treatment Plant , presently operational in the township .
"The drainage system has been laid at Township Level.The planned internal storm system has been laid out . The drainage water is being collected in seasonal ponds and lakes of Boulevard. The planned tapping points for the project shall be available and the same will be connected as and when required. "
Parks / Play fields are planned at Township Level. The planned green areas within the cluster are planned to be completed before completion of project.
"Tree planting as per approved landscape plan at township level is complete. The tree planting at cluster level shall be done as and when required before completion of the Towers."
"The electric supply from Grid Sub Station as planned for the Township is complete. The tapping points for the project are available and the same are being connected as and when required. "
Not Applicable
The sewage will be treated at Sewage Treatment Plant. The sullage will be converted into compost. The sullage water after necessary treatment will be supplied for flushing, irrigation and landscaping.
The solid waste to be collected from door to door apartments after occupancy of resident will be transferred to segregation centres planned at Sewege Treatment Plant at Township level. The segregated waste shall be transported through facility management maintenance company to the identified sites of YEIDA Authority for necessary disposal. Solid waste management agency shall be deployed for collection of any solid waste generated during construction stage.
Treated water from Sewage Treatment Plant shall be used for irrigation and road washing, flushing etc.
As per approved environment impact assessment authority advice
The Fire Station with all the infrastructure facilities and staff is planned at Township level. Towers and basements are being provided with all the provisions of Fire Protection & Safety System as laid down in respective fire approval from the fire department. Fire tender is available at Township level.
At township level, Higher Secondary School (Sardar Patel Vidyalaya), Temples, Cafeteria, Police Outpost, Dispensery facilities etc. have already been provided. World class Formula -1 is operational within the Township and round the year races , corporate events etc are being hosted and held in Buddh International Circuit. International standard Cricket Stadium with Outfield, spectator stands already made ready and corporate league and other cricket matches are being held at the Cricket Ground.
Fire Escape Staircases are being provided in tower and basements as per Norms laid down in respective fire approval of the fire department.
At Township Level Sewage Treatment Plant & Service Centres, Electric Grid Sub station with DG Power Backup, Fire tenders and mobile fire saftey equipments, Boulevard & Parks and Seasonal ponds have been provided.
Showing 23 blocks with 92 units
Total Carpet Area
8201.34 m²
88278.40 ft²
Total Units
69
2 different types
Blocks & Floors
23
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
16439.00 m²
176947.75 ft²