OngoingActive

Jaypee Greens, E-1/3 Land 1, Greater Noida

Gautam Buddha Nagar, Uttar Pradesh
08-06-2007
Launch Date
Ongoing
Type
27-02-2021
Completion Date

Overview

Launch Date

08-06-2007

Completion Date

27-02-2021

RERA ID

UPRERAPRJ5600

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)1232
Project NameJaypee Greens, E-1/3 Land 1, Greater Noida
Registration Fee (in Rs.)11500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)165
DistrictGautam Buddha Nagar
Original Start Date08-06-2007
TehsilGautam Buddha Nagar
Proposed Start Date08-06-2007
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)0
Proposed Completion Date27-02-2021

Location

Latitude

28^ 28' 21'

Longitude

77^ 30' 55'

Bank Details

Account no.57500000063740
Name Of Account HolderJAYPEE GREENS A DIVISION OF JAIPRAKASH ASSOCIATES LTD E1-1/3 RERA ESCROW ACCOUNT
Bank NameHDFC Bank
Branch AddressKAILASH BUILDING,26,KASTURBA GANDHI MARG, NEW DELHI-110001
Branch NameK G MARG
IFSC CodeHDFC0000003

Development Works

Demarcation of Plots

"Location of Plot : As per Approved Layout and development plan. The Plot has been demarcated as per approved Layout Plan of Land 1 Jaypee Greens, Greater Noida. Status: Demarcation complete."

Boundary Wall

"This Project is part of Jaypee Greens Land-1, Sector 19 & 25, Greater Noida. The Over all Boundary Wall of of entire development has been Constructed. Being gated community, separate boundary wall for this Project is not proposed. However Boundary wall is proposed in Front and Rear side which is to be completed by allottee."

Road Work

"The Approach Road to the project is Completed. The Internal Roads Connecting the Plot have been completed."

Footpaths

The Pedestrian Foot Paths with Concrete Pavers / Broom finish Concrete / Cobblestone with Kerb Stone along the road as per Layout plan has been completed.

Water Supply Including Drinking Water Facilities

"The Pipe Lines for pressurised Water Supply has been laid and Completed for over all Jaypee Greens (which include this unit). Water supply is being made from water treatment plant. Supply to unit shall be given at one point at boundary."

Sewer System

"Sewer System have been laid and Completed with Sewerage Treatment Plant already operational for over all Jaypee Greens (which include this unit). Disposal system of unit shall be connected to nearest Man Hole."

Drain

"The Drainage System for over all Jaypee Greens (which include this unit) has been laid and functional. The Drainage Water is being Collected in Lakes of Golf Courses for the purpose of rain water harvesting."

Parks

Parks / landscaped areas has been developed and completed as per Approved Landscape plan for entire development.

Tree Planting

The Tree Planting has been completed as per Approved Landscape Layout for entire development.

Design For Electric Supply Including Street Lighting

Electric Supply System and Electric Sub Station is complete. Supply shall be provided at one point along boundary wall. External Electrical System with Street Lighting is complete and operational.

Community Buildings

Community Facilities (Social club, Swimming pool, Health club, outdoor sports facilities, etc.) for the over all Jaypee Greens has been completed.

Treatment and Disposal System of Sewage and Sullage water

The Sewage is being treated at Sewerage Treatment Plant. The Sullage is Converted into Compost. The Sullage Water after necessary treatment is being used for Irrigation of Landscaped areas.

Solid Waste Management And Disposal System

The Solid Waste is being collected from door to door. The Segregated waste is being transported through facility management maintenance company to the identified sites of Greater Noida Authority for necessary disposal.

Water Conservation System

Rain Water Harvesting system is functional.

Energy Management System Including Use of Renewable Energy

Automated (Timer based) system for LED street lighting and irrigation works has being provided.

Fire Protection And Fire Safety System

Fire Protection System and Fire Hydrants for over all Jaypee Greens has been completed and functional. Fire Station with all the infrastructure facilities and staff has been provided.

Social Infrastructure And Other Public Amenities Including Public Health Services

Convenient Shopping Centre, Integrated sports complex, School, Club facilities etc. have already been provided.

Emergency Evacuation Services

Being Independent Unit, building is accessible from all sides and building plans are approved by Fire Authority.

Other Miscellaneous Work

Receiving Station, Electric Sub station with DG Power Backup, Fire Station, Telephone lines, FTTH System are completed and operational. Parks & Playgrounds are completed and are in use. Completion for all the services have been obtained from Statutory Authorities.

Documents

Lease Deed

No: BOOK 1 VOLUME NO 331 PAGE 393/428 SERIAL NO 3178/3179 | Date: 18-05-2001

Lease Deed

No: BOOK 1 VOLUME NO 246 PAGE 1019/1052 SERIAL NO 2936/2937 | Date: 08-06-2000

Details of Encumbrances

Uploaded: 31-05-2018

Other Plan(If Any)

Uploaded: 19-07-2019

Proforma of Application Form

Uploaded: 04-07-2018

Proforma of Allotment Letter

Uploaded: 04-07-2018

Proforma of Conveyance Deed

Uploaded: 03-07-2018

Waste Disposal Plan

Uploaded: 30-05-2018

Water Supply Plan

Uploaded: 30-05-2018

Electricity Supply Plan

Uploaded: 30-05-2018

Development Work Plan

Uploaded: 19-07-2019

Affidavit

Uploaded: 31-05-2018

Floor plans of all types

Uploaded: 30-07-2017

Affidavit

Uploaded: 30-07-2017

Registry Document In Case of Own Land

Uploaded: 30-07-2017

Registry Document In Case of Own Land

Uploaded: 30-07-2017

Permits

Orignal Permit NoTo be applied
Orignal Permit Date31-07-2017
Valid Upto30-07-2022
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto30-07-2027
End Date31-08-2020
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)NA
Contractor AddressNA
Architect NameArcop Associates Pvt. Ltd.
Architect AddressA-15 Pamposh Enclave, New Delhi-110048
Architect Licence NumberCA/93/15869
Structural Engineer NameNA
Structural Engineer AddressNA
Mobile number(Project Co-ordinator)9650222583

Land Details

Plot

Showing 1 blocks with 1 units

Property Summary

Total Carpet Area

0.00

0.00 ft²

Total Units

0

1 different types

Blocks & Floors

1

1 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:NaN
Balconies:0
Parking ratio:NaN per unit

Block undefined

1 units

Khasra Details

Total Area

1232.00

13261.12 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoB1b-01, Land-1, Sec-19&25, Gr. Noida
Area(In Sq. Mt.)1232

Other Details

Contractor Name (if any)NA
Contractor AddressNA
Architect NameArcop Associates Pvt. Ltd.
Architect AddressA-15 Pamposh Enclave, New Delhi-110048
Architect Licence NumberCA/93/15869
Structural Engineer NameNA
Structural Engineer AddressNA
Mobile number(Project Co-ordinator)9650222583