"As per location of Plot : NE - Approach Road / Group Housing SE - Golf Club SW - Golf Course NW - Golf Course The Plot has been demarcated"
"This Project is part of Wish Town Township. The Over all Boundary Wall of Town Township has been Constructed except few Passages. Due to cluster planning Boundary Wall for this Project has been planned and shall be Constructed on three sides (front, rear & one side) as this project is internally connected by other Group housing."
"The Approach Road to the project is Completed. The Internal Roads Connecting the Towers have been Planned as per Submission Drawings and the same shall be Constructed before completion of Project."
The Pedestrian Foot Paths with Kerb Stone as per Landscape Plan have been Planned and the same will be Constructed before completion of Project.
"The Pipe Lines for Water Supply has been laid and Completed at Township Level. The Drinking Water is being Supplied through Water Centres after necessary treatments. The Tapping Points for Towers are available and the same shall be Connected as and when reqired for Completion of Works."
"The Pipe Lines for Sewer System have been laid and Completed at Township Level. The Sewage will be treated at Sewerage Treatment Plant. The Tapping Points for these Towers are available and the same shall be Connected as and when reqired before Completion of Works. "
"The Drainage System has been laid and Completed at Township Level. The Drainage Water is being Collected in Lakes of Golf Courses. The Tapping Points for these Towers are available and the same shall be Connected as and when reqired before Completion of Works."
"Parks / Play Fields are Planned at Township Level and are not applicable at tower levels. "
"Tree Planting as per Approved Landscape Plan at Township Level is Complete. The Tree Planting at Tower Levels will be done as and when reqired before Completion of Project."
"The Electric Supply from Grid Sub Station as Planned for Wish Town is complete. Tapping Points for this Project is available and the same shall be Connected as and when reqired before Completion of Works."
Not Applicable
"The Sewage will be treated at Sewerage Treatment Plant. The Sullage will be Converted into Compost. The Sullage Water after necessary treatment will be Supplied for Flushing, Irrigation and Landscaping. "
"The Solid Waste collected from door to door apartments will be Transferred to Segrigation Centres planned / constructed at Sewerage Treatment Plant at Township level. The Segregated waste is being transported through facility management maintenance company to the identified sites of Noida Authority for necessary disposal."
Treated Water from Sewerage Treatment Plant is being used for irrigation and flushing.
As per Approved Environment Impact Assessment Authority Advice
The Fire Station with all the infrastructure facilities and staff has been provided at Township level. Towers and basements are being provided with all the provisions of Fire Protection & Safety System as laid down in respective fire approval from the fire department.
At township level, 500 hundred Bed Super Speciality Hospital, Jaypee Institute of Information & Technology, Jaypee Public School, Temples, Convenient Shopping facilities, Club facilities etc. have already been provided
Fire Escape Staircases are provided in Tower and Basements as per Norms laid down in respective fire approval of the fire Department.
At Township Level Sewerage Treatment Plant & Service Centres, Electric Sub station with DG Power Backup, Fire Station, Parks & Playgrounds have been provided.
Showing 2 blocks with 81 units
Total Carpet Area
43737.30 m²
470783.92 ft²
Total Units
124
2 different types
Blocks & Floors
2
36 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
11508.00 m²
123870.96 ft²