Have queries on this Project?
28.334051
77.2883
Showing 10 blocks with 80 units
Total Carpet Area
34498.40 m²
371337.33 ft²
Total Units
880
1 different types
Blocks & Floors
10
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
101114.27 m²
1088383.89 ft²
Proper demarcation of plots will be done , with all fixed four point showing road , plot area and other services also.
Brick Masonry wall have been construction with isolated footing , columns and plinth beam along with plaster on both sides and grill on the top.
Complete Black top ( Bituminous ) Road will be constructed all along the defined location in the approved drawings with standard specification.
Footpaths will be constructed all along the road/Green area as designed with specific Pavers /stone on top.
Water supply will be given to all individuals through underground water tank with proper Filterization Plant.
Proper Sewer system will be constructed embedded with sewer treatment plant.
Strom Water Drain will be constructed as per the approved drawings and gradients.
Complete Greenery will be developed as per approved landscaping drawings.
All Trees / Shrubs/ Hedging will be planted as required in approved drawings.
Electrical supply will be given to all individuals at single point from developed substation as per norms . Proper street lighting will be done as per requirement and approved drawings.
Not Applicable
Disposal system of sewage sullage water is being use through a STP will be you for land scape and flushing purpose
Solid Waste Management system will be installed in a separate dedicated space to full fill all the required criteria.
Low flow water mixture being used for water conservation and STP water will be use for land scape and flushing purpose
As specific Y_ value glass has been use for energy management and roof insulation light colour tiles will be use for renewal energy solar photo boltaic energy have been use for comman area
Fire system and fire safety system will be installed in the building as per NBC norms.
Social Infrastructure and other public amenities including public health service as per approved plan
As per the disaster management and approved plan.
Not Applicable.