Launch Date
Completion Date
RERA ID
28'35'56.96'' N
77'27'0.29'' E
TOTAL PLOT AREA 2665 SQ.MT. LOCATED PLOT NO.GH-10B, SITUATED IN TECH ZONE-VI, GREATER NOIDA WEST
2100 MM HEIGHT, ALONG ENTIRE PERIPHERY
INTER LOCKING PAVERS
INTER LOCKING PAVERS
DOMESTIC TANK UGT OF CAPACITY-280 KLD & OHT OF 275 KLD.HAS BEEN PROVIDED.
UNDER GROUND SYSTEM USING UPVC(SN4) SEWER PIPE.
UNDER GROUND SYSTEM USING UPVC(SN4)PIPE
PARK HAVING TOTAL AREA OF 9983.98 SQ.MT.
204 NOS TREES ARE TO BE PLANTED OUT OF THAT 50% WILL BE EVER GREEN.
THREE ELECTRICITY TRANSFORMER OF 1600 KVA CAPACITY EACH SHELL BE USED ALONG WITH NECESSARY SWITCH GEARS FOR DISTRIBUTING ELECTRICITY AT LT. VOLTAGE.
BUILT UP AREA OF COMMUNITY BUILDING SHELL BE 10062.34 SQ2.MT.
STP OF CAPACITY 700 KLD. IS BE PROVIDED TREATED WATER SHELL BE USED FOR FLUSHING,IRRIGATION,PATHWAYS CLEANING,& ACCES SEWAGE SHELL BE DISCHARGE IN THE MUNICIPAL SEWAGE.
MANUAL COLLECTION & ORGANIC WEST CONVERTER SHELL BE PROVIDED.
07 NOs Ground Water downstream of Rain Water Harvesting pit are provided at the minimum distance of 30 m as per the MoEF Guidelines
solar panel shell be provided on terrace for renewable energy. 38.76kw. solar back up has been proposed, single point metric wiil be there for energy purchased for the grid power supply company.
fire tender pathe are provided as/nbc, fire fighting systems along with pumps & UGT of fire tank capacity 200 kld,common & OHT of fire tank capacity 85 KL(all trowers) shell be provided as/nbc and noc from fire department.
STP, organic west converter shell be provided.
stair cases are provided in basement & all the towers for fire/emergency exit as/NBC.
------------------
Showing 4 blocks with 134 units
Total Carpet Area
42521.26 m²
457694.59 ft²
Total Units
384
3 different types
Blocks & Floors
4
20 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
27665.00 m²
297783.29 ft²