NewActive

Greenshire Mart

Gautam Buddha Nagar, Uttar Pradesh
01-03-2020
RERA Received Date
New
Type
30-09-2023
Completion Date

Overview

RERA Received Date

01-03-2020

Completion Date

30-09-2023

RERA ID

UPRERAPRJ716227

Location

Latitude

28.5803104

Longitude

77.4451375

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)3439
Project NameGreenshire Mart
Registration Fee (in Rs.)45000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)43
DistrictGautam Buddha Nagar
Original Start Date-
TehsilGautam Buddha Nagar
Proposed Start Date01-03-2020
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)1250
Proposed Completion Date30-09-2023

Bank Details

Account Details
Name of the AccountNIRALA PROJECTS PVT LTD COLLECTION ACCOUNT
Account Number920020051239551
Bank NameAXIS BANK
Branch NameAXIS BANK NOIDA
Branch AddressSECTOR-63 NOIDA UP
IFSC CodeUTIB0003873
Branch DistrictGautam Buddha Nagar
Transaction Account Details
Name of the AccountNIRALA PROJECTS PVT LTD
Account Number920020051295944
Bank NameAXIS BANK
Branch NameAXIS BANK NOIDA
Branch AddressSECTOR-63 NOIDA UP
IFSC CodeUTIB0003873
Branch DistrictGautam Buddha Nagar

Development Works

Demarcation of Plots

As per approved plan, Total Plot Area 40852.50 sq.mtr. out of which 3439 sq.mtr is utilized for Greenshire Mart

Boundary Wall

RCC Plint Beam, Brickwork and MS Railing, As Per Approved Plan by GNIDA vide letter no. PLG/(BP)-3205/602 dated 30.01.2020, Approved Map No. RTC/NGS/SUB/PH-2/100-A

Road Work

Left, Right and Back Side of Commercial Area RCC, Front Side Pavers, - As Per Approved Plan by GNIDA vide letter no. PLG/(BP)-3205/602 dated 30.01.2020, Approved Map No. RTC/NGS/SUB/PH-2/100-A

Footpaths

Pavers will be used - As Per Approved Plan by GNIDA vide letter no. PLG/(BP)-3205/602 dated 30.01.2020, Approved Map No. RTC/NGS/SUB/PH-2/100-A

Water Supply Including Drinking Water Facilities

As per Lease Deed Condition Water Supply Provided by the authority and developer will distribute internally

Sewer System

Will made and develop by RCC Pipe Lines - Develop as per approved plan by GNIDA vide letter no. PLG/(BP)-3205/602 dated 30.01.2020, Approved Map No. RTC/NGS/SUB/PH-2/100-A

Drain

Develop as per approved plan by GNIDA vide letter no. PLG/(BP)-3205/602 dated 30.01.2020, Approved Map No. RTC/NGS/SUB/PH-2/100-A

Parks

Planned and Develop as per approved plan by GNIDA vide letter no. PLG/(BP)-3205/602 dated 30.01.2020, Approved Map No. RTC/NGS/SUB/PH-2/100-A

Tree Planting

Planned and Develop as per approved plan by GNIDA vide letter no. PLG/(BP)-3205/602 dated 30.01.2020, Approved Map No. RTC/NGS/SUB/PH-2/100-A

Design For Electric Supply Including Street Lighting

Install as per approved plan by GNIDA vide letter no. PLG/(BP)-3205/602 dated 30.01.2020, Approved Map No. RTC/NGS/SUB/PH-2/100-A

Community Buildings

N.A

Treatment and Disposal System of Sewage and Sullage water

This project (Greenshire Mart) is a part of total project and phase -1 already registered under RERA registration no. UPRERAPRJ4975, Treatment and Disposal System of Sewage and Sullage Water through by STP capacity of 670 KLD - Its Already Operational and this project is to be connected with the same STP/Total Project

Solid Waste Management And Disposal System

This project (Greenshire Mart) is a part of total project and phase -1 already registered under RERA registration no. UPRERAPRJ4975, Solid Waste Management and Disposal System is already operational and this project is to be connected with the same

Water Conservation System

Adequate number provided, as per approved plan by GNIDA vide letter no. PLG/(BP)-3205/602 dated 30.01.2020, Approved Map No. RTC/NGS/SUB/PH-2/100-A

Energy Management System Including Use of Renewable Energy

N.A

Fire Protection And Fire Safety System

Fire NOC received and attached , system as per approved by UP Fire Department CFO by letter no.UPFS/2019/13247/GBN/GAUTAM BUDDH NAGAR/4462/CFO

Social Infrastructure And Other Public Amenities Including Public Health Services

As per approved Plan

Emergency Evacuation Services

As per GNIDA approved plan

Other Miscellaneous Work

N.A

Documents

Lease Deed

No: Lease Deed - Bahi No.1, Jilad No.10034, Pages - 83 to 114 S.No.25111 dated 29.12.2011 & Supplimentar | Date: 29-12-2011

Details of Encumbrances

Uploaded: 19-03-2020

Commencement Certificate

Uploaded: 21-02-2020

Proforma of Application Form

Uploaded: 20-02-2020

Proforma of Allotment Letter

Uploaded: 21-02-2020

Proforma of Conveyance Deed

Uploaded: 04-03-2020

Proforma of Completion Certificate(Occupancy)

Uploaded: 21-02-2020

Waste Disposal Plan

Uploaded: 21-02-2020

Water Supply Plan

Uploaded: 21-02-2020

Electricity Supply Plan

Uploaded: 21-02-2020

Development Work Plan

Uploaded: 21-02-2020

Affidavit

Uploaded: 19-03-2020

CA CERTIFICATE

Uploaded: 04-03-2020

ARCHITECT CERTIFICATE

Uploaded: 04-03-2020

ENGINEERS CERTIFICATE

Uploaded: 04-03-2020

Permits

Orignal Permit NoPLG/(BP)-3205/602 (Revised Map Approval)
Orignal Permit Date30-01-2020
Valid Upto30-01-2025
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto30-01-2025
End Date31-03-2023
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)In House Development
Contractor AddressIn House Development
Architect NamePiyush Mittal
Architect AddressReinfo-Tech Consultants, G 56 (Basement) Pushkar Enclave, Paschim Vihar New Delhi-110063
Architect Licence NumberCA/2015/71404
Structural Engineer NameMaqsud E Nazar
Structural Engineer AddressNNC Design International Consulting Structural Engineer, G-70 IInd Floor Jaswant Plaza Near Kalandi Kunj Main Sarita Vihar Road Okhla New Delhi 110025
Mobile number(Project Co-ordinator)9810690076

Land Details

AFS

Showing 1 blocks with 5 units

Property Summary

Total Carpet Area

970.95

10451.21 ft²

Total Units

54

1 different types

Blocks & Floors

1

2 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:17.98
Balconies:0
Parking ratio:0.00 per unit

Block Commercial

5 units

Khasra Details

Total Area

40852.50

439732.22 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH-03, Sector-02
Area(In Sq. Mt.)40852.50

Other Details

Contractor Name (if any)In House Development
Contractor AddressIn House Development
Architect NamePiyush Mittal
Architect AddressReinfo-Tech Consultants, G 56 (Basement) Pushkar Enclave, Paschim Vihar New Delhi-110063
Architect Licence NumberCA/2015/71404
Structural Engineer NameMaqsud E Nazar
Structural Engineer AddressNNC Design International Consulting Structural Engineer, G-70 IInd Floor Jaswant Plaza Near Kalandi Kunj Main Sarita Vihar Road Okhla New Delhi 110025
Mobile number(Project Co-ordinator)9810690076