Have queries on this Project?
28.598544
77.450033
Showing 2 blocks with 96 units
Total Carpet Area
95968.32 m²
1032993.40 ft²
Total Units
336
2 different types
Blocks & Floors
2
24 floors across all blocks
Parking
0
0 garages, 0 open
BY BOUNDARY WALL
RCC WALL
TRIMIX CONC
TRIMIX CONC
CPVC PIPE
CPVC PIPE
YES
YES
YES
YES
ALREADY CONSTRUCTED IN PHASE-1
STP
ALREADY CONSTRUCTED IN PHASE-1
YES
YES
YES
YES
YES
AS PER BUILDING PLAN
Greenarch Phase-3 is located in Gautam Buddha Nagar.
Yes. Greenarch Phase-3 is registered under UPRERAPRJ7342 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Greenarch Phase-3 is 4 January 2023.
Greenarch Phase-3 is developed by NEW WAY HOMES PRIVATE LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.