Launch Date
Completion Date
RERA ID
281954N
773105E
By fixing co-ordinate point with all dimensions and tangents as per given approved drawings.
Brick work wall with column will be Provided.
R.C.C Road Finishing (trimix) will be Provided.
1.5 m wide path with interlocking tiles finishing will be Provided.
Bore-well water, government supply line facilities. From U.G. Tanks will be treated water to Over Head Tank and from Over Head Tank to individual flats services.
S.T.P System will Provide
All rain water collected through collected chambers will be provided as per requirement.
Mounds, Play ground, Trees planting will provided
Tree will be provided as per requirement.
From UPPCL to Meter Room and line will be connected to HT Panel Room then Divided in LT Panel for all the towers area .
Gym, Swimming, Spa, Party Hall will be provided.
S.T.P System will be provided.
Disposal as per norms Premises.
Rain water Harvesting will be Provided as per requirement.
Not provided
All Fire equipment will be be providing in towers and all basements.
Not Applicable
All safety norms and related equipment will be providing
Nil
Showing 7 blocks with 276 units
Total Carpet Area
102395.15 m²
1102171.16 ft²
Total Units
928
4 different types
Blocks & Floors
7
18 floors across all blocks
Parking
0
0 garages, 0 open