Showing 1 blocks with 7 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
408545.00 m²
4397537.53 ft²
Designated plots is demarcated as per lease plan issued by the Authority.
As per approved building plan boundary wall has already been constructed on site.
As per layout plan the construction of roads shall be in the form of- 1. Construction of GSB by providing well coarse graded material spreading in uniform layers as per technical No. 401 of MORTH. 2. Laying of RMC 3. Vacuum Dewatering.
Footpath will be provided as per the layout plan.
Water shall be provided by authority and internal distribution shall be done by developer.
STP shall be provided for sewerage system as per design calculation.
Separate drainage line will be used as per the design requirement by laying of RCC hume pipe (NP2) of 600 MM dia.
Landscape area should be provided as per local building bye laws and as per approved plan.
Nos. of tree should be provided as per approved drawing and requirement.
Electric supply including street light should be provided as per the approved plan by laying of NP2 class RCC pipe. Street lighting should be provided as per the layout plan.
Community building will construct as per approved building plan.
STP shall be provided for sewerage and sullage system, treated water shall be used for flushing and irrigation system.
Waste shall be segregated and will be treated by organic waste converter. Manure produced shall be used in green area and surplus effluent shall be disposed by authorised vendor.
Low flow water fixtures will used for water conversation and adequate number of recharge shall be provided.
Specific U-Value glass will be used for energy management system and for roof isolation, light colour tiles will be used and for renewable energy solar photovoltaic energy will be used for common area.
Fire protection and fire alarm system shall be installed as per the NBC norms.
Social infrastructure and other public amenities including public health services shall be provided as per local building bye laws.
As per Environment management plan and Disaster management plan all provisions shall be made including assembly points.
Other miscellaneous work shall be provided as per the layout plan.
Golf country Phase-P2 is located in Gautam Buddha Nagar.
Yes. Golf country Phase-P2 is registered under UPRERAPRJ403642 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Golf country Phase-P2 is 31 December 2022.
Golf country Phase-P2 is developed by SUPERTECH TOWNSHIP PROJECT LIMITED.