Total Units
500
1 unit type
Carpet Area
1,97,451 ft²
18,343.80 m² · carpet only, excludes balcony
Blocks & Floors
1
15 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 395 ft² (36.69 m²)Balconies 70Parking per unit 0.00
All blocks
Showing 50 of 73 rows · 7 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit | Balconies | Balcony Areatotal |
|---|---|---|---|---|---|---|
| T4 | GF | OTHER | 13 | 375 ft²34.80 m² | — | — |
| T4 | GF | OTHER | 17 | 400 ft²37.20 m² | — | — |
| T4 | GF | OTHER | 2 | 420 ft²39.06 m² | — | — |
| T4 | 1 | OTHER | 13 | 375 ft²34.80 m² | 1 | 68 ft²6.30 m² |
| T4 | 1 | OTHER | 1 | 375 ft²34.80 m² | 1 | 74 ft²6.83 m² |
| T4 | 1 | OTHER | 1 | 375 ft²34.80 m² | 1 | 69 ft²6.45 m² |
| T4 | 1 | OTHER | 18 | 400 ft²37.20 m² | 1 | 68 ft²6.30 m² |
| T4 | 1 | OTHER | 3 | 420 ft²39.06 m² | 1 | 73 ft²6.75 m² |
| T4 | 2 | OTHER | 13 | 375 ft²34.80 m² | 1 | 68 ft²6.30 m² |
| T4 | 2 | OTHER | 1 | 375 ft²34.80 m² | 1 | 74 ft²6.83 m² |
| T4 | 2 | OTHER | 1 | 375 ft²34.80 m² | 1 | 69 ft²6.45 m² |
| T4 | 2 | OTHER | 18 | 400 ft²37.20 m² | 1 | 68 ft²6.30 m² |
| T4 | 2 | OTHER | 3 | 420 ft²39.06 m² | 1 | 73 ft²6.75 m² |
| T4 | 3 | OTHER | 13 | 375 ft²34.80 m² | 1 | 68 ft²6.30 m² |
| T4 | 3 | OTHER | 1 | 375 ft²34.80 m² | 1 | 74 ft²6.83 m² |
| T4 | 3 | OTHER | 1 | 375 ft²34.80 m² | 1 | 69 ft²6.45 m² |
| T4 | 3 | OTHER | 18 | 400 ft²37.20 m² | 1 | 68 ft²6.30 m² |
| T4 | 3 | OTHER | 3 | 420 ft²39.06 m² | 1 | 73 ft²6.75 m² |
| T4 | 4 | OTHER | 13 | 375 ft²34.80 m² | 1 | 68 ft²6.30 m² |
| T4 | 4 | OTHER | 1 | 375 ft²34.80 m² | 1 | 74 ft²6.83 m² |
| T4 | 4 | OTHER | 1 | 375 ft²34.80 m² | 1 | 69 ft²6.45 m² |
| T4 | 4 | OTHER | 18 | 400 ft²37.20 m² | 1 | 68 ft²6.30 m² |
| T4 | 4 | OTHER | 3 | 420 ft²39.06 m² | 1 | 73 ft²6.75 m² |
| T4 | 5 | OTHER | 13 | 375 ft²34.80 m² | 1 | 68 ft²6.30 m² |
| T4 | 5 | OTHER | 1 | 375 ft²34.80 m² | 1 | 74 ft²6.83 m² |
| T4 | 5 | OTHER | 1 | 375 ft²34.80 m² | 1 | 69 ft²6.45 m² |
| T4 | 5 | OTHER | 18 | 400 ft²37.20 m² | 1 | 68 ft²6.30 m² |
| T4 | 5 | OTHER | 3 | 420 ft²39.06 m² | 1 | 73 ft²6.75 m² |
| T4 | 6 | OTHER | 9 | 375 ft²34.80 m² | 1 | 68 ft²6.30 m² |
| T4 | 6 | OTHER | 17 | 400 ft²37.20 m² | 1 | 68 ft²6.30 m² |
| T4 | 6 | OTHER | 1 | 400 ft²37.20 m² | 1 | 69 ft²6.45 m² |
| T4 | 6 | OTHER | 3 | 420 ft²39.06 m² | 1 | 73 ft²6.75 m² |
| T4 | 6 | OTHER | 2 | 548 ft²50.90 m² | 1 | 99 ft²9.22 m² |
| T4 | 7 | OTHER | 9 | 375 ft²34.80 m² | 1 | 68 ft²6.30 m² |
| T4 | 7 | OTHER | 16 | 400 ft²37.20 m² | 1 | 68 ft²6.30 m² |
| T4 | 7 | OTHER | 2 | 400 ft²37.20 m² | 1 | 69 ft²6.45 m² |
| T4 | 7 | OTHER | 3 | 420 ft²39.06 m² | 1 | 73 ft²6.75 m² |
| T4 | 7 | OTHER | 2 | 548 ft²50.90 m² | 1 | 99 ft²9.22 m² |
| T4 | 8 | OTHER | 13 | 375 ft²34.80 m² | 1 | 68 ft²6.30 m² |
| T4 | 8 | OTHER | 1 | 375 ft²34.80 m² | 1 | 74 ft²6.83 m² |
| T4 | 8 | OTHER | 1 | 375 ft²34.80 m² | 1 | 69 ft²6.45 m² |
| T4 | 8 | OTHER | 18 | 400 ft²37.20 m² | 1 | 68 ft²6.30 m² |
| T4 | 8 | OTHER | 3 | 420 ft²39.06 m² | 1 | 73 ft²6.75 m² |
| T4 | 9 | OTHER | 13 | 375 ft²34.80 m² | 1 | 68 ft²6.30 m² |
| T4 | 9 | OTHER | 1 | 375 ft²34.80 m² | 1 | 74 ft²6.83 m² |
| T4 | 9 | OTHER | 1 | 375 ft²34.80 m² | 1 | 69 ft²6.45 m² |
| T4 | 9 | OTHER | 18 | 400 ft²37.20 m² | 1 | 68 ft²6.30 m² |
| T4 | 9 | OTHER | 3 | 420 ft²39.06 m² | 1 | 73 ft²6.75 m² |
| T4 | 10 | OTHER | 9 | 375 ft²34.80 m² | 1 | 68 ft²6.30 m² |
| T4 | 10 | OTHER | 17 | 400 ft²37.20 m² | 1 | 68 ft²6.30 m² |
Total Plot Area
24.72 acres
1,00,035.70 m² · plot area
Plot No.-11, Sector Techzoe-4,Greater Noida( West) demarcation has been done Greater Noida Industrial Development Authority ( GNIDA). Phase III is shown as per site Plan.
Boundary wall shall be secured by natural wall of out facing shops other barrier.
Road work will be done using R.C.C./ interlocking tiles as per Sanctioned Plan.
Footpath will be constructed using interlocking / Paver as per Sanctioned Plan.
Drinking Water will be provided by government supply and it will be stored in under ground / overhead tanks and STP treated water will be available for gardening and flushing as per Plans.
Proper Sewerage system will be constructed using R.C.C./ UPVC pipes as per drawings and it will be treated with STP. STP treated water will be used as mentioned above and residual will be disposed of in government sewerage system.
Draining System will be constructed using R.C.C./ UPVC pipes as per drawings.
Proper Park/ Green Area will be developed as per Sanctioned layout Plans.
Sufficient number of trees as per Sanctioned Layout will be planted in the project.
HT Electrical supply will be made by NPCL / competent authority , a sub station will be set-up in project as per drawings and LT electrical supply will be available for individual unit(s) . Sufficient power backup arrangement will be made using DG Sets. Street Lighting will be done using LT supply / Power back-up.
No
Sewerage Treatment plant will be installed / constructed as per approved drawings. All sewerage will be treated and treated water will be available for gardening and flushing and residual of sewerage treatment plant will be drained in government sewer system.
Solid waste will be collected manually and disposal will be done as per norms.
Water conservation will be done by rain water harvesting system and through Sewerage Treatment Plant( STP).
Good quality and approved brand equipment will be used in sub -station to minimize energy loss and Solar Energy System will be installed as per norms and approved drawings.
Fire Fighting system including hydrant, sprinkler system, and fire alarms will be installed as per drawings. Fire escape staircase will be constructed as per drawings. Refuge area will be made as per norms.
Shopping Complex , Food court are available in the project.
Fire staircase refuge area will provided as per requirement for evacuation in case of any emergency.
Proper security system including security guards, CCTV Cameras and controlled access will be made available
Golden I Phase-III is located in Gautam Buddha Nagar.
Yes. Golden I Phase-III is registered under UPRERAPRJ732580 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Golden I Phase-III is 30 December 2024.
Golden I Phase-III is developed by OCEAN INFRAHEIGHTS PRIVATE LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.