Launch Date
Completion Date
RERA ID
28.59360
77.43430
Plot No. 11, Sector Techzone-IV, Greater Noida (West), demarcation had been done by Greater Noida Industrial Development Authority( GNIDA). Phase II is shown as per site plan.
Boundary wall shall be secured by natural wall of out facing shops other barrier.
Road work will be done using R.C.C./ interlocking tiles as per Sanctioned Plans.
Footpath will be constructed using Interlocking / Paver as per Sanctioned Plans.
Drinking water will be provided by government supply and it will be stored in under ground / overhead water tanks and STP treated water will be available for gardening and flushing as per plans.
Proper sewerage system will be constructed using R.C.C. / UPVC pipes as per drawings and will be treated with STP . STP treated water will be used as mentioned above and residual will be disposed of in government sewerage system.
Draining system will be constructed using R.C.C. / UPVC pipes as per drawings.
Proper Park / Green Area will be developed as per sanctioned layout plans.
Sufficient No. of trees as per Sanctioned layout ( approx.750 trees) will be planted in the project.
HT electrical supply will be made by NPCL / competent authority, a sub station will be set-up in project as per drawing and LT electrical supply will be available for individual unit(s). Sufficient power back-up arrangement will be made using DG sets. Street Lighting will be done using LT supply / power back-up.
No
Sewerage Treatment Plant will be installed / constructed as per approved drawings. All sewerage will be treated and treated water will be available for gardening and flushing and residual of sewerage treatment plant will be drained in government sewer system.
Solid waste will be collected manually and disposal will be done as per norms.
Water conservation will be done by rain water harvesting system and through Sewerage Treatment Plant ( STP)
Good quality and approved brand equipment will be used in sub-station to minimize energy loss and Solar Energy System will be installed as per norms and approved drawings.
Fire Fighting System including hydrant, sprinkler system, and fire alarm will be installed as per drawings . Fire escape staircase will be constructed as per drawings. Refuge area will be made as per norms.
Sopping Complex, Food court, are available in the Project.
Fire staircase and refuge area will provided as per requirement for evacuation in case of any emergency.
Proper security system including security guards, CCTC Cameras and controlled access will be made available.
No: Affidavit Regarding the Golden I Phase-II Project | Date: 27-09-2021
No: Extension of Registration of Golden I Phase-II Project | Date: 15-01-2024
No: Extension of Registration of Golden I Phase-II Project | Date: 15-01-2024
No: Extension of Registration of Golden I Phase-II Project | Date: 15-01-2024
No: Extension of Registration of Golden I Phase-II Project | Date: 10-02-2024
Showing 7 blocks with 157 units
Total Carpet Area
28377.35 m²
305450.96 ft²
Total Units
804
2 different types
Blocks & Floors
7
11 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
100035.70 m²
1076774.27 ft²