OngoingActive

Golden I Phase-I

Gautam Buddha Nagar, Uttar Pradesh
16-06-2017
RERA Received Date
Ongoing
Type
13-12-2023
Completion Date

Overview

RERA Received Date

16-06-2017

Completion Date

13-12-2023

RERA ID

UPRERAPRJ6747

Location

Latitude

28.589900

Longitude

77.434726

Basic Details

Project TypeOngoing
Project CategoryCommercial
Total area in round figure (Sq.mt.)61138
Project NameGolden I Phase-I
Registration Fee (in Rs.)622000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)78
DistrictGautam Buddha Nagar
Original Start Date16-06-2017
TehsilGautam Buddha Nagar
Proposed Start Date16-06-2017
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)45000
Proposed Completion Date13-12-2023

Bank Details

Account no.210601601000714
Name Of Account HolderOcean Infraheights Pvt. Ltd
Bank NameCorporation Bank
Branch AddressVasundhra
Branch NameVadhundra
IFSC CodeCORP0002106

Development Works

Demarcation of Plots

Plot No-11, Sector Techzone -4, Greater Noida, demarcation by Greater Noida Authority. Phase 1 is shown as per site plan.

Boundary Wall

Boundary wall shall be secured by natural wall of out facing shops & other barrier.

Road Work

Road work will be done using R.C.C/ interlocking tiles as per plans.

Footpaths

Footpath will be constructed using Interlocking/ Paver as per plans.

Water Supply Including Drinking Water Facilities

Drinking water will be provided by government supply and it will be stored in under ground / overhead water tanks and STP treated water will be available for gardening and flushing as per plans.

Sewer System

Proper sewarge system will be constructed using R.C.C /UPVC pipes as per drawings and it will be treated with STP. STP treated water will be used as mentioned above and residual will be disposed of in government sewarge system.

Drain

Draining system will be constructed using R.C.C /UPVC pipes as per drawings.

Parks

Proper park / green area will be developed as per sanctioned layout partially in phase-1 and rest later on.

Tree Planting

Sufficient number of trees as per approved layout (approx. 750 trees) will be planted in both phases.

Design For Electric Supply Including Street Lighting

HT electrical supply will be made by NPCL/competent authority, a sub-station will be set-up on project as per drawing and LT electrical supply will be avialable for individual unit. Sufficeint power back-up arrangement will be made using DG Sets. Street Lighting will be done using LT supply/power back-up.

Community Buildings

Club/Community Hall will be constructed for residential units with proper facilities.

Treatment and Disposal System of Sewage and Sullage water

Sewarge Treatment Plant will be installed / constructed as per approved drawings. All sewarage will be treated and treated water will be available for gardening and flushing and residual of sewarage treatment plant will be drained in government sewer system.

Solid Waste Management And Disposal System

Solid waste will be collected manually and disposal will be done as per norms.

Water Conservation System

Water conservation will be done by rain water harvesting system and sewerage treatment plant.

Energy Management System Including Use of Renewable Energy

Good Quality and approved brand equipments will be used in sub-station to minimise energy loss and solar energy system will be installed as per norms and approved drawings.

Fire Protection And Fire Safety System

Fire Fighting System including hydrant,sprinkler system, and fire alarms will be installed as per drawings. Fire escape staircase will be constructed as per drawings. Refuge area will be made as per norms.

Social Infrastructure And Other Public Amenities Including Public Health Services

Shopping Complex, Food court, Multiplex Cinema Hall, are available in Phase-1

Emergency Evacuation Services

Fire staircase & refuge area will provided as per requirment for evacuation in case of any emergency.

Other Miscellaneous Work

Proper security system including security guards, CCTV camera and controlled access will be made available.

Documents

Lease Deed

No: 18290 | Date: 23-07-2013

Allotment Letter issued by Competent Authority

No: GNIDA/I.T./2016/9278 | Date: 22-12-2016

Allotment Letter issued by Competent Authority

No: Land Title Search Report | Date: 28-09-2021

Details of Encumbrances

Uploaded: 07-10-2021

Commencement Certificate

Uploaded: 07-10-2021

Other Plan(If Any)

Uploaded: 07-10-2021

Proforma of Application Form

Uploaded: 06-10-2021

Proforma of Allotment Letter

Uploaded: 06-10-2021

Proforma of Conveyance Deed

Uploaded: 07-10-2021

Proforma of Completion Certificate(Occupancy)

Uploaded: 07-10-2021

Waste Disposal Plan

Uploaded: 07-10-2021

Water Supply Plan

Uploaded: 07-10-2021

Electricity Supply Plan

Uploaded: 07-10-2021

Development Work Plan

Uploaded: 07-10-2021

Affidavit

Uploaded: 19-07-2018

CA CERTIFICATE

Uploaded: 06-10-2021

ARCHITECT CERTIFICATE

Uploaded: 06-10-2021

ENGINEERS CERTIFICATE

Uploaded: 06-10-2021

Registry Document In Case of Own Land

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Permits

Orignal Permit No37805 - 3509
Orignal Permit Date16-06-2017
Valid Upto15-06-2022
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto15-06-2027
End Date15-06-2022
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit No37805 - 3509
Orignal Permit Date16-06-2017
Valid Upto15-06-2022
Revalidated Permit NoPLG/BP/SM-24-MAY-2019:5533
Revalidated Permit Date25-08-2021
Revalidated Permit Valid Upto24-08-2026
Permit Extendable Upto24-08-2031
End Date14-12-2022
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Divyam Developers Pvt. Ltd
Contractor Address9-10/3 Laxman House, Aasaf Ali Road, New Delhi-6
Architect NameSikka Associates Architects- Raman Sikka
Architect AddressE-24 South Extension 1 New Delhi, 110049
Architect Licence NumberRegn. No. 93/16497
Structural Engineer NameMr. Hari Shankar
Structural Engineer AddressG-70, 2nd Floor, Jaswant Plaza, Near Kalindi Kunj, Main Sarita Vihar Road, Okhla, New Delhi-110025
Mobile number(Project Co-ordinator)9971188270

Land Details

AFS

Showing 8 blocks with 716 units

Property Summary

Total Carpet Area

89833.62 m²

966960.10 ft²

Total Units

2810

4 different types

Blocks & Floors

8

26 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:31.97 m²
Balconies:341
Parking ratio:0.00 per unit

Block BLOCK F

6 units

Block BLOCK A

126 units

Block BLOCK B

193 units

Block BLOCK C

241 units

Block BLOCK D&E

63 units

Block H2

31 units

Block H3

24 units

Block T3

32 units

Khasra Details

Total Area

100035.70 m²

1076774.27 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoPlot No 11, Tech Zone IV Greater Noida West
Area(In Sq. Mt.)100035.70

Other Details

Contractor Name (if any)Divyam Developers Pvt. Ltd
Contractor Address9-10/3 Laxman House, Aasaf Ali Road, New Delhi-6
Architect NameSikka Associates Architects- Raman Sikka
Architect AddressE-24 South Extension 1 New Delhi, 110049
Architect Licence NumberRegn. No. 93/16497
Structural Engineer NameMr. Hari Shankar
Structural Engineer AddressG-70, 2nd Floor, Jaswant Plaza, Near Kalindi Kunj, Main Sarita Vihar Road, Okhla, New Delhi-110025
Mobile number(Project Co-ordinator)9971188270