Have queries on this Project?
28.56257143256278
77.39882391994983
Showing 12 blocks with 293 units
Total Carpet Area
90844.91 m²
977845.53 ft²
Total Units
866
4 different types
Blocks & Floors
12
29 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
40000.00 m²
430556.00 ft²
Designated plots is demarcated as per the Lease plan issued by the authority
Boundary wall has already been constructed on site
Internal roads designed of different R.O.W. as per requirement
Footpaths is provided as per the Layout plan
Municipal water supply is used for drinking purpose.
Sewerage system is used with STP as per the design calculation
Separate drainage line is used as per the design requirement
Landscape area is provided as per Local Building Bye-laws
No. of trees as per the approved drawings & requirements.
Electric supply including street lighting is provided as per the Layout plan.
Designed for community facilities as per the design requirement
Disposal system of Sewage and Sullage water is being used through STP which is used for Landscape and flushing purpose.
All the solid waste managed as per the biogradible waste converted in to compost and non biogradible delivered to registered recyclable agencies.
Low flow water fixtures being used for water conservation and STP water is used for landscape and flushing purpose.
Specific U-value glass is used for energy management and for roof insulation light colour tiles is used, and for renewable energy Solar photovoltic energy is used for common areas.
Fire system and fire safety system is installed in the buildings as per the NBC norms.
Social infrastructure and other public amenities including public health services are provided as per local Building Bye-laws
As per Enviornment management plan and Disaster management plan all provisions are made including assembly point
Other Miscellaneous work is provided as per the Layout Plan
Gaur Sportswood is located in Gautam Buddha Nagar.
Yes. Gaur Sportswood is registered under UPRERAPRJ3528 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Gaur Sportswood is 29 September 2022.
Gaur Sportswood is developed by GAURSONS SPORTSWOOD PRIVATE LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.