Launch Date
Completion Date
RERA ID
28.57756044
77.36942
Enclosed with Boundary wall height 1.2 M
Combination of RCC Column with brick work, plaster/paint MS Railing
Road pattern is provided in such a way the approch to commercial is motorable and section consists of subgrade preparation with 1 layer GSB and 1 layer of Cement Concrete pavament/pavers as per design of Developers Consultant .
Combinetion of Kerb stone/pavers/cement concrete as per design of Developres Architect.
System for water is ground water and provided underground /overhead water tank with individual ROs to be installed by Allottee.
Shop Hold Sewerage is collected through sewage lines upto the STP established for the project and after treatment the sluge and theated water obtained shall be used in green areas like green landscapes and also for flushing lines.
Rain water collection shall be done from terrace thru storm water lines/covered drains at ground level and connected to rain harvesting pits.
Provision of green area as per Design of Developers Architect.
Planned trees are 25 Nos. in open areas and along with boundary wall different types of trees shall be provided.
Electrical connection for the shop from PVVNL or Its Licensee/sub-licensee and connection will be provided to customers thru prepaid meter and proportionate electricity infrastructure cost including feeder construction expenses, substations/panels/transformers/other equipments/expenses, cabling expenses, system loading charges, security charges etc as applicable shall be borne by the customers and further subject to regular payments of fixed electricity charges usage/consumption charges and energy losses/line distribution losses and payment of taxes/cess/duties/levy as applicable and demanded from time as per guidelines laid down by power supply company /government .
NA
Shall be connected to STP provided for treating household sewerage and the treated sludge/water is being used for green areas and flushing system
Shop to Shop collection system has been planned with a arrangement of separate collection of decomposable and non decomposable waste in separate bags and treatment arrangement for the same.
As per Sanctioned Architect Design underground recharge pits with perforated filter media used for rain water harvesting provided.
NA
Vertical risera with FHC shaft /sprinkler and connected to pump room with a provision of jockey/Main/Diesel pump as per NBC
NA
Fire Staircase provided as per NBC
NA
Showing 1 blocks with 119 units
Total Carpet Area
450361.14 m²
4847642.27 ft²
Total Units
13396
1 different types
Blocks & Floors
1
6 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3000.00 m²
32291.70 ft²