Launch Date
Completion Date
RERA ID
28,21',20.43''
77,31',44.80''
AS PER PLAN
AS PER PLAN
AS PER PLAN
AS PER PLAN
Total water requirement is proposed to be catered by an underground tank . Potable Water will be supplied by Jaypee sports & treated water will be stored in compartment No -3 .RO unit proposed in each unit
Soil & Waste from Toilet & Kitchen will be collected separately for soil & waster pipe line and after that sewer pipe line laid under ground with manhole & connected to Centralized STP of JP Sport City , Formula One
Separate line for rain water with & Other line for soil & waste and connected to JP sport city line
AS PER PLAN
AS PER PLAN
Efficient & Effective design of substation with 100% Power back up & street light in walk way and parks . Adequate design to reduce losses in transmission & distribution .
AS PER PLAN
Sewer water treatment through Centralized STP of Jaypee Sport City Township with their disposal arrangement
AS PER PLAN
VFD based hydro pneumatic pumps used with sensor , treated STP water used for flushing & Horticulture
Pumps & equipment selected on best energy efficient point . Photoelectric senor used for external and common area light with provision of solar energy
Internal & external hydrant system , sprinklers, Heat Detector, smoke detector MCP & Fire Extinguishers in all floors . As per Fire norms
AS PER PLAN
AS PER PLAN
NA
Showing 1 blocks with 138 units
Total Carpet Area
8564.86 m²
92191.30 ft²
Total Units
138
1 different types
Blocks & Floors
1
28 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3786.00 m²
40752.13 ft²