OngoingActive

F PREMIERE (PHASE 2)

Gautam Buddha Nagar, Uttar Pradesh
10-10-2014
Launch Date
Ongoing
Type
28-01-2024
Completion Date

Overview

Launch Date

10-10-2014

Completion Date

28-01-2024

RERA ID

UPRERAPRJ7173

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)3786
Project NameF PREMIERE (PHASE 2)
Registration Fee (in Rs.)24000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)112
DistrictGautam Buddha Nagar
Original Start Date10-10-2014
TehsilDadri
Proposed Start Date10-10-2014
Sanctioning Competent AuthorityYamuna Expressway Authority
Project Cost (in Lacs)5143
Proposed Completion Date28-01-2024

Location

Latitude

28,21',20.43''

Longitude

77,31',44.80''

Bank Details

Account no.50200057351201
Name Of Account HolderHOME & SOUL INFRATECH PVT LTD SEPARATE ESCROW BANK ACCOUNT FOR F-PREMIERE (PHASE 2)
Bank NameHDFC BANK LTD
Branch AddressSECTOR-18 NOIDA 201301
Branch NameSECTOR-18 HDFC BRANCH
IFSC CodeHDFC0001592

Development Works

Demarcation of Plots

AS PER PLAN

Boundary Wall

AS PER PLAN

Road Work

AS PER PLAN

Footpaths

AS PER PLAN

Water Supply Including Drinking Water Facilities

Total water requirement is proposed to be catered by an underground tank . Potable Water will be supplied by Jaypee sports & treated water will be stored in compartment No -3 .RO unit proposed in each unit

Sewer System

Soil & Waste from Toilet & Kitchen will be collected separately for soil & waster pipe line and after that sewer pipe line laid under ground with manhole & connected to Centralized STP of JP Sport City , Formula One

Drain

Separate line for rain water with & Other line for soil & waste and connected to JP sport city line

Parks

AS PER PLAN

Tree Planting

AS PER PLAN

Design For Electric Supply Including Street Lighting

Efficient & Effective design of substation with 100% Power back up & street light in walk way and parks . Adequate design to reduce losses in transmission & distribution .

Community Buildings

AS PER PLAN

Treatment and Disposal System of Sewage and Sullage water

Sewer water treatment through Centralized STP of Jaypee Sport City Township with their disposal arrangement

Solid Waste Management And Disposal System

AS PER PLAN

Water Conservation System

VFD based hydro pneumatic pumps used with sensor , treated STP water used for flushing & Horticulture

Energy Management System Including Use of Renewable Energy

Pumps & equipment selected on best energy efficient point . Photoelectric senor used for external and common area light with provision of solar energy

Fire Protection And Fire Safety System

Internal & external hydrant system , sprinklers, Heat Detector, smoke detector MCP & Fire Extinguishers in all floors . As per Fire norms

Social Infrastructure And Other Public Amenities Including Public Health Services

AS PER PLAN

Emergency Evacuation Services

AS PER PLAN

Other Miscellaneous Work

NA

Documents

Lease Deed

No: 26769 | Date: 13-08-2014

Details of Encumbrances

Uploaded: 16-03-2022

CA CERTIFICATE

Uploaded: 31-07-2018

ARCHITECT CERTIFICATE

Uploaded: 31-07-2018

ENGINEERS CERTIFICATE

Uploaded: 31-07-2018

Registry Document In Case of Own Land

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Proforma of Application Form

Uploaded: 31-07-2017

Proforma of Allotment Letter

Uploaded: 31-07-2017

Other Plan(If Any)

Uploaded: 31-07-2017

Other Plan(If Any)

Uploaded: 31-07-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 31-07-2017

Affidavit

Uploaded: 31-07-2017

Permits

Orignal Permit NoBP-55/1065
Orignal Permit Date10-10-2014
Valid Upto21-02-2019
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto09-10-2024
End Date30-10-2021
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit NoBP-55/1065
Orignal Permit Date10-10-2014
Valid Upto21-02-2019
Revalidated Permit No732/2024
Revalidated Permit Date01-10-2024
Revalidated Permit Valid Upto09-10-2024
Permit Extendable Upto10-07-2025
End Date28-01-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)CHAWLA TECHNO CONSTRUCT LIMITED
Contractor Address3, LOCAL SHOPPING CENTRE, UDAI PARK, NEW DELHI-110049,
Architect NameMODARCHINDIA
Architect AddressARCHITECTURE, INTERIOR, ENVIRONMENTAL , PLOT NO.:-B-99 FIRST FLOOR, SECTOR-63 NOIDA
Architect Licence NumberCA/98/22706
Structural Engineer NameOPTIMIZATION CONSULTANTS
Structural Engineer Address202-203,HIMLAND HOUSE, KARAMPURA COMMERCIAL COMPLEX, NEW DELHI-110015
Mobile number(Project Co-ordinator)9643004765

Land Details

AFS

Showing 1 blocks with 138 units

Property Summary

Total Carpet Area

8564.86 m²

92191.30 ft²

Total Units

138

1 different types

Blocks & Floors

1

28 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:62.06 m²
Balconies:138
Parking ratio:0.00 per unit

Block TOWER B

138 units

Khasra Details

Total Area

3786.00 m²

40752.13 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH-B3
Area(In Sq. Mt.)3786

Other Details

Contractor Name (if any)CHAWLA TECHNO CONSTRUCT LIMITED
Contractor Address3, LOCAL SHOPPING CENTRE, UDAI PARK, NEW DELHI-110049,
Architect NameMODARCHINDIA
Architect AddressARCHITECTURE, INTERIOR, ENVIRONMENTAL , PLOT NO.:-B-99 FIRST FLOOR, SECTOR-63 NOIDA
Architect Licence NumberCA/98/22706
Structural Engineer NameOPTIMIZATION CONSULTANTS
Structural Engineer Address202-203,HIMLAND HOUSE, KARAMPURA COMMERCIAL COMPLEX, NEW DELHI-110015
Mobile number(Project Co-ordinator)9643004765