6ft height boundary wall of RCC wall /column and brick work as per drawings
Cement Concrete Road over the subbase 100mm thick PCC
Not applicable
water connection for the domestic uses will be Provided by the NOIDA and Storage will be done in under ground water tank of the capacity as per the norms.
Main Sewer line has been designed as per norms and pvc pipe of 10 kg pressure will be used in the vertical stacks in the shafts,partially sewer line will lay in basement ceiling and will finally connect to STP.
Underground pipeline drain will be lay in slope as per norms and collecting chambers as per the norms will be provide to collect the surface rain water
soft Landscape has been done in the park with sufficient electrical lighting
Tree Plantation of the different variable of tree as per the site conditions has been done
M.S street light Designer poles with energy saving LED lighting fixtures will be use.
The community building has been completed as per sanction plan
STP will be installed at basement for treated the Sewer and treated water will be recycled for use in flushing and gardeining.
will be done by the external vendors by collecting the garbage from the dustbin/shops and segreggate the same for the recycling the dry waste and prepare the compost from the wet waste.
rain water harvesting pit has plan in the open area for recharge the ground water by collect the rain water from terrace and road surface area
Solar panel will be installed on the terrace for the conservation of the electricity as per the norms of MOE.
System will be provided as per the fire department guidelines to fullfil the fire norms as per the NBC
Not applicable
separate fire stair case is designed for evacuation service in the building
Not applicable
Showing 3 blocks with 93 units
Total Carpet Area
13581.55 m²
146190.45 ft²
Total Units
147
5 different types
Blocks & Floors
3
17 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
21700.00 m²
233576.63 ft²