Launch Date
Completion Date
RERA ID
28.34'40'
77.27'05'
Yes, It has already been done and boundary wall for the project.
Yes, RCC Columns and masonary with M.S Railing.
Yes, Internal Roads and Paths willbe of concrete and inter locking tiles.
As per approved map.
Yes, water supply from authority will provide as we are a part of integrated township.
Yes, Sewer system in building will be with PVC pipe and underground sewer system will be with RCC pipe and same will be connected to project.
Yes, Saucer drain and RCC hume pipe drainage system.
Yes, Beautiful landscape will be done as per architectural drawing.
Yes, It will be done as per architectural drawings.
Yes, The Electricity supply along with power back up will be provided with fifty percent diversity factor.
Yes, GYM, Club, Swimming pool and Indoor games facility will be provided.
Yes, S.T.P and through authority sewerage.
Yes, Organic waste convertor, collection bins.
Yes, Rain water harvesting pits as per norms.
Yes, as per approved map.
Yes, all places will be covered with proper fire fighting system and fire alarm system as approved by fire authority.
Yes, Proper water supply and sanitary facilities on ground floor.
Yes, all stairs reached at ground floor level for easy and fast evacution.
Not Applicable
Showing 6 blocks with 522 units
Total Carpet Area
37696.79 m²
405764.48 ft²
Total Units
723
3 different types
Blocks & Floors
6
15 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
30000.00 m²
322917.00 ft²