28.304186
77.251044
Total Units
24
1 unit type
Carpet Area
4,29,772 ft²
39,927.13 m² · carpet only, excludes balcony
Blocks & Floors
4
24 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 17,907 ft² (1,663.63 m²)Balconies 0Parking per unit 0.0016 of 40 rows list no units (16 floors are empty), so they add nothing to these totals
All blocks
Showing 40 of 40 rows · 5 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit |
|---|---|---|---|---|
| PHASE F (Block-B) | BSMNT | OTHER | — | — |
| PHASE F (Block-B) | BSMNT2 | OTHER | — | — |
| PHASE F (Block-B) | BSMNT3 | OTHER | — | — |
| PHASE F (Block-B) | GF | OTHER | 1 | 35,729 ft²3,319.33 m² |
| PHASE F (Block-B) | 1 | OTHER | 1 | 41,624 ft²3,866.99 m² |
| PHASE F (Block-B) | 2 | OTHER | 1 | 74,915 ft²6,959.87 m² |
| PHASE F (Block-B) | 3 | OTHER | 1 | 1,092 ft²101.44 m² |
| PHASE G (Block C) | BSMNT | OTHER | — | — |
| PHASE G (Block C) | BSMNT2 | OTHER | — | — |
| PHASE G (Block C) | BSMNT3 | OTHER | — | — |
| PHASE G (Block C) | GF | OTHER | 1 | 41,068 ft²3,815.37 m² |
| PHASE G (Block C) | 1 | OTHER | 1 | 23,553 ft²2,188.19 m² |
| PHASE G (Block C) | 2 | OTHER | 1 | 39,727 ft²3,690.72 m² |
| PHASE G (Block C) | 3 | OTHER | 1 | 26,207 ft²2,434.74 m² |
| PHASE C ( IT-3) | BSMNT | OTHER | — | — |
| PHASE C ( IT-3) | BSMNT2 | OTHER | — | — |
| PHASE C ( IT-3) | BSMNT3 | OTHER | — | — |
| PHASE C ( IT-3) | GF | OTHER | 1 | 8,845 ft²821.75 m² |
| PHASE C ( IT-3) | 1 | OTHER | — | — |
| PHASE C ( IT-3) | 2 | OTHER | 1 | 5,057 ft²469.86 m² |
| PHASE C ( IT-3) | 3 | OTHER | 1 | 5,057 ft²469.86 m² |
| PHASE C ( IT-3) | 4 | OTHER | 1 | 10,688 ft²992.96 m² |
| PHASE C ( IT-3) | 5 | OTHER | — | — |
| PHASE C ( IT-3) | 6 | OTHER | 1 | 9,752 ft²905.96 m² |
| PHASE C ( IT-3) | 7 | OTHER | 1 | 10,688 ft²992.96 m² |
| PHASE C ( IT-3) | 8 | OTHER | 1 | 11,420 ft²1,060.94 m² |
| PHASE C ( IT-3) | 9 | OTHER | 1 | 11,420 ft²1,060.94 m² |
| PHASE D ( IT-4) | BSMNT | OTHER | — | — |
| PHASE D ( IT-4) | BSMNT2 | OTHER | — | — |
| PHASE D ( IT-4) | BSMNT3 | OTHER | — | — |
| PHASE D ( IT-4) | GF | OTHER | 1 | 8,845 ft²821.75 m² |
| PHASE D ( IT-4) | 1 | OTHER | — | — |
| PHASE D ( IT-4) | 2 | OTHER | 1 | 5,057 ft²469.86 m² |
| PHASE D ( IT-4) | 3 | OTHER | 1 | 5,057 ft²469.86 m² |
| PHASE D ( IT-4) | 4 | OTHER | 1 | 10,688 ft²992.96 m² |
| PHASE D ( IT-4) | 5 | OTHER | — | — |
| PHASE D ( IT-4) | 6 | OTHER | 1 | 9,752 ft²905.96 m² |
| PHASE D ( IT-4) | 7 | OTHER | 1 | 10,688 ft²992.96 m² |
| PHASE D ( IT-4) | 8 | OTHER | 1 | 11,420 ft²1,060.94 m² |
| PHASE D ( IT-4) | 9 | OTHER | 1 | 11,420 ft²1,060.94 m² |
Total Plot Area
26.89 acres
1,08,800.00 m² · plot area
The Project landwill be demarcated by its boundary wall to the exact shape, size and orientation as per sanction map by Noida Development Authority.
A 2.4M High boundary wall of brick and plaster will be constrution with deep foundation to be earthquake resistant. The wall will then be plastered and painted as per asthetics.
A pavement quality concrete will be laid in thickness of + 200 mm on top of compacted Dry lean concrete/ coarse grained sub-base.
An M-15 grade of paver block/ inter locking tiles will be laid in the project for walking areas. Tiles will be 3 to 4 inch thick and the colour patters will be lasting and visible at all hours.
A portable ground water supply through and pumping arrangement will be delivered to the water tank of 25000l capacity of terrace.
The sewage will be collected through a soil pipe arrangement, U-bends and inspection chambers leading to the septic tank of the project, from where the sewage will be disposed to the STP system.
A surface drain with specs of 150mm CC sub-base over compacted earth topped with 20mm of cement mortar to the size of 150 x 75 laid in slope of 1 to 300 leading to GT.
Two lush green parks will be maintained in the project per apporved plan by Noida development authority. The parks will have foothpaths, sitting area and small play area for kids.
The trees will be planted at all suitable loactions of the project and along the boundary wall. The tree section will be done to enusre no hindrance in the services for future
Electrical layout and capacity will be installed to suffice the domestic use of the project. The load sanctions will be taken from the Vidyut Vibhag.
NOT APPLICABLE
CENTRALISED STP TO TREAT THE SEWEAGE
PROJECT SHALL HAVE WASTE SEGREGATION AREA AND OWC FRO TREATMENT
Rain Water harvesting System, Duel Flush System.
LED LIGHT AND TIMER CONTROL RANELS SHALL BE USED FOR EFFICIENT ENERGY MANAGEMENT
FIRE ALARM SYSTEM PROVIDED
NOT APPLICABLE
AS PER APPROVED BUILDING PLAN
AS PER APPROVED BUILDING PLAN
Cyberthum Phase Ii is located in Gautam Buddha Nagar.
Yes. Cyberthum Phase Ii is registered under UPRERAPRJ452606 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Cyberthum Phase Ii is 25 September 2024.
Cyberthum Phase Ii is developed by Bhutani Infra.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.
Developed by
11 Projects
EXECUTIVE SUMMARY OF BHUTANI INFRA Bhutani Infra is one of NCR's most prominent commercial real estate developers, operating primarily through its parent entity Parmesh Construction Company Limited (CIN: U45201UP1996PLC1…
Know More about Bhutani Infra