28.33139
77.285347
Showing 6 blocks with 223 units
Total Carpet Area
33094.47 m²
356225.57 ft²
Total Units
765
2 different types
Blocks & Floors
6
8 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
80961.18 m²
871458.05 ft²
Subject to project residential plot area is 24919 sq.m Plot no. 06, sector knowledge park- 5, Greater Noida Proper demarcation of plots will be done, with all fixed four point showing road, plot area and other services also.
The Plot is enclosed on three sides with a 6 ft high RCC and brick wall . Brick Masonry wall have been construction with isolated footing , columns and plinth beam along with plaster on both sides and grill on the top.
Complete Black top (Bituminous) Road will be constructed all along the defined location in the approved drawings with standard specification.
Footpaths are 150mm above road level, finished with interlocking tiles and curb stones for structural strength and safe Pedestrain use. Footpaths will be constructed all along the road/Green area as designed with specific Pavers/stone on tip.
Drinking water will be sourced through a borewell with 2 nos of 2 lakh Ltrs, and stored in underground and overhead tanks to ensure Water supply will be given to all individuals through underground water tank with proper Filterization plant.
RCC/HDPE 300mm pipes will be used for the sewage system, designed as per approved drawings and relevant standards Proper Sewer system will be constructed embedded with sewer treatment plant.
Storm water drains using RCC/HDPE300mm pipes will be laid as per approved design to prevent waterclogging and ensure proper discharge .
Proposed park area 28678.71sqmt. Park area includes hard and soft landscaping with lawns, walkways,400 nos. of evergreen tree and 400nos of ornmrntal tree plantations, and electrical lighting for Complete Greenery will be developed as per approved landscaping drawings.
400 nos. of evergreen tree and 400 nos of ornmrntal tree species have been planted across the site based on soil and climatic conditions to improve all Trees/Shrubs/Hedging will be Various tree species have been planted across the site based on soil and climatic conditions to improve All Trees/Shrubs/Hedging will be planted as required in approved Drawings .
HT supply from UPPCL ; sub-station installed as ESS -1 3 NOS 2500 KVA TRANSFORMER ESS -2 4 NOS 2500 KVA TRANSFORMER ESS-3 1 NOS 500 KVA TRANSFORMER SHOWN IN ELECTRICAL LAYOUT . 2 NOS .500KVA D.G.SET AS per approved plan. LT supply to each unit with DG backup, street lighting via LT/Power Backup. Electrical supply will be given to all individual at single point from developed substation as per norms. Proper street lighting will be done as per requirement and approved drawings.
Not Applicable as per Greater Noida Development Industrial Authority (GNIDA) norms; no community building is required or not NOT Applicable.
We will develop the STP in the first phase itself, so that all the phase can be develop smoothly. Disposal System of sewage sullage water is being use through a STP will be your for land scape and flushing purpose.
Waste will be manually collected and segregated at source. Disposal will be as per the Municipal and Solid Waste Management system will be installed in a separated dedicated space to full fill all the required criteria.
Rainwater harvesting system will be installed to collect and recharge groundwater in line with environmental Low flow water mixture being used for water conservation and STP water be use for land scape and flushing purpose.
High quality equipment will be used in the sub-station to reduce energy loss . solar power system will be installed as per approved drawings. As specific Y_ value glass has been use for energy management and roof insulation light colour tiles will be use for renewal energy solar photo boltaic energy have been use for comman area
Fire Fighting system with hydrants, sprinklers, and alarms will be installed will be installed; Fire escape stairs provided as per the NOC and approved plans. fire system and fire safety will be installed in the building as per NBC norms.
Public health and other social infrastructure facilities are not applicable as per GDA norms and project classification. Social Infrastructure and other public amenities including public health services as per approved plan
Fire escape staircases and refuge areas will be provided as per NBC norms to ensure safe evacuation during Emergencies. As per the disaster management and approved plan.
Miscellaneous work will be carried out as needed during development, following all relevant standards and approved plans. Not Applicable