RERA Received Date
Completion Date
Configurations
Sizes
Project Size
Total Floors
Launch Price
RERA ID
28.44746
77.46342
Plot Area ; 20050 Sq. Mtrs. North East - Other Property South East- Other Property South West - Other Property North- West- 45. 0 M Wide Road
Combination of M.S. Railing and R.C.C. Wall. Thickness of boundary wall 300 mm and height of boundary wall 2100 mm , length 585 mtrs.
Yes, Concrete Road with KERB Stone on Edge. area around 6025 sq. m. The road width varies at different stretches, measuring 9m, 7.5m and 6m
Yes, Landscape Consultant Design
Yes, municipal Water Supply will be collected in underground water reservoirs and through pumps Terrace Tank will be filled.
An STP of 180 KLD capacity will be constructed using RCC along with the required pump room. The sewage collected through a network of DWC Hume pipes, supported by manholes, chambers and collection pits will be treated in the STP. After treatment, the discharge will be connected to the municipal sewer line. A 250mm diameter sewer line with a total length of 374.54 mtrs is proposed for this connection.
Yes, Terrace Strom water will get collected in R.W.H. pit for Ground water recharge.
Yes, as per landscape consultant design with plants, waterbodies and shrubs.
Yes, as per Landscape Consultant Design.
Yes, Electric will be Supplied from state Electricity Board. H.T meter room, V.C.B. Room, L.T. room , Diesel Generator and Transformers, will be provided in the Project. Street light will be provided as per landscape plan.
Yes, provided with facility like banquet , swimming pool, gym, yoga and sports hall etc.
sewage will be treated in STP and excess treated water will be discharged in municipal drain after approval.
Yes, Solid waste will be managed by installing organic waste converter , segregation of waste at household level.
Yes, through a network of R.W.H pit and using grey water / treated water in flushing , irrigation etc.
Yes, SOLAR PV panel will be installed.
As per N.B.C . -2016 all provisions with 7 pumps 4- 2850 LMP, 2-180 LPM , Sprinkler yard hydrance etc automatic alarm system required for high rise building shall be made.
Toilets for disabled and visitor will be provided on the ground floor of every Tower. Sports facility will be provided as per landscape plan.
Yes, Refuge Area provided at every Blocks , alongwith fire tender path around each tower. in Tower A- refuge area is provided on 15th , 16th , 17th and 23rd , 24th , 25th Floor. in Tower B- refuge area is provided on 15th , 16th, 17th and 23th , 24th , 25th Floor. in Tower C- refuge area is provided on 15th, 16th, 17th and 23th , 24th, 25th floor. in addition to refuge area , 2 staircase ( main staircase , fire staircase) is also provided alongwith Balconies in each apartment. Along with fire tender path also provided around each tower.
Guard Room , Entrance and Exit gates, Maintenance Room, Commercial Facilities , CCTV , Calling facility and Security Guards for proper watch and ward.
No: Possession Letter Noida/ Group Housing/ 2025/5649 | Date: 19-06-2025
No: Land Dues NOC form Noida Authority /Account/Group Housing/288 | Date: 22-05-2025
No: Reply of Objection Letter for Clove County Project Registration | Date: 17-11-2025
Showing 4 blocks with 89 units
Total Carpet Area
60190.60 m²
647885.60 ft²
Total Units
228
5 different types
Blocks & Floors
4
31 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
20050.00 m²
215816.19 ft²