NewActive

civitech Santoni

Gautam Buddha Nagar, Uttar Pradesh
01-07-2023
Launch Date
New
Type
10-04-2030
Completion Date

Overview

Launch Date

01-07-2023

Completion Date

10-04-2030

RERA ID

UPRERAPRJ364474

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)15089
Project Namecivitech Santoni
Registration Fee (in Rs.)161000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)82
DistrictGautam Buddha Nagar
Original Start Date-
TehsilDadri
Proposed Start Date01-07-2023
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)63748
Proposed Completion Date10-04-2030

Location

Latitude

28.362590

Longitude

77.264097

Bank Details

Account Details
Name of the AccountCIVITECH BUILDCON PRIVATE LIMITED ESCROW COLLECTION PROJECT SANTONI
Account Number6717002900000116
Bank NamePunjab Naional Bank
Branch NamePNB. Sector-63 NOIDA
Branch AddressPNB, Sector-63, NOIDA , Gautambudh Nagar -201301
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodePUNB0671700
Separate Account Details
Name of the AccountCIVITECH BUILDCON PRIVATE LIMITED ESCROW SEPARATE ACCOUNT PROJECT SANTONI
Account Number6717002900000125
Bank NamePunjab National Bank
Branch NamePNB, Sector-63, NOIDA
Branch AddressPNB, Sector-63, NOIDA, Gautambudh Nagar-UP
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodePUNB0671700
Transaction Account Details
Name of the AccountCIVITECH BUILDCON PRIVATE LIMITED ESCROW TRANSACTION ACCOUNT PROJECT SANTONI
Account Number6717002900000134
Bank NamePunjab National Bank
Branch NamePNB, Sector-63, NOIDA
Branch AddressPNB, Sector-63, NOIDA, Gautambudh Nagar-UP
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodePUNB0671700

Development Works

Demarcation of Plots

demarcation of plot by bench mark in consultation with surveyor for plot corners as per lease plan issued by GNIDA . 23 feet high sheet fencing will be provided

Boundary Wall

boundary wall by RCC and grills, ambient lighting

Road Work

RCC, trimix or floor tiles or cobbles stones or interlocking tiles , kerb stone for fire tender route of 7.5 meter wide around the mall and 9 meter wide near the tower

Footpaths

floor tiles or cobble or interlocking tiles ,well lighted footpath will be provided

Water Supply Including Drinking Water Facilities

695 KLD is the total water requirement including fresh water of 241 KLD and treated water of 450 KLD .

Sewer System

STP for treatment of sewerage and sullage waste is proposed. The technology proposed to be used for the purpose is MBBR with PSF /ACF and ozone in tertiary treatment . moving bed bio reactor is an attached growth process, where the bio mass grows on media.

Drain

natural typology of plot /by gravity for storm water line will be laid down. bio soils , landscape feature and other sustainable urban drainage system (SUDS) will be used.

Parks

landscape area of 4176.718 sqm is proposed .

Tree Planting

85 number of tress are proposed and will be planted as per landsscap plan. 50 percent plant will be ever green .

Design For Electric Supply Including Street Lighting

total power requirement is 6554 KVA including street lighting building lighting etc.,

Community Buildings

public toilets for visitors are proposed inside the mall with fitting and fixtures.

Treatment and Disposal System of Sewage and Sullage water

proposed STP capacity is 380 KLD.

Solid Waste Management And Disposal System

Saprate wet and dry bins will be provided in common area and ground floor to facilitate sagarigation of waste . solid waste will be sagrigated in vet garbage and inert materials .

Water Conservation System

the capacity of tank and recharge pit is designed to retain run- off at least fifteen minutes of rainfall at peak intensity. 4 numbers of rain water harvesting pits are proposed .

Energy Management System Including Use of Renewable Energy

concept of passive solar design that menimises energy consumption is building by using design elements such as building orientation , landscaping , efficient building envelop , appropriate fenestration , increase day lighting disgine and thermal mask etc., shall be incorporated in the building.

Fire Protection And Fire Safety System

fire protection and fire safety system are proposed like fire piping system , fire water static system fire pumping system fire hydrant system automatic sprinkler system automatic fire detection system fire alarm water curtain system and parking area , hand held fire extinguisher

Social Infrastructure And Other Public Amenities Including Public Health Services

separate toilets for specially abled persons, baby feeding room , driver room with toilet in parking and staff toilet at different level are proposed

Emergency Evacuation Services

stair cases are provided in building, distance between stair cases and width are proposed considering maximum occupancy of the floor as per NBC and local fie norms. rams are provided inside the building for the basement.

Other Miscellaneous Work

facility of sick room and doctor room is proposed inside the building .

Documents

Lease Deed

No: 33543 | Date: 01-08-2019

Allotment Letter issued by Competent Authority

No: Commercial/2019/2834 | Date: 04-06-2019

Details of Encumbrances

Other Plan(If Any)

Proforma of Conveyance Deed

Development Work Plan

Details of Encumbrances

Uploaded: 28-07-2023

Commencement Certificate

Uploaded: 15-06-2023

Other Plan(If Any)

Uploaded: 07-07-2023

Proforma of Application Form

Uploaded: 15-06-2023

Proforma of Allotment Letter

Uploaded: 15-06-2023

Proforma of Conveyance Deed

Uploaded: 07-07-2023

Proforma of Completion Certificate(Occupancy)

Uploaded: 15-06-2023

Waste Disposal Plan

Uploaded: 15-06-2023

Water Supply Plan

Uploaded: 15-06-2023

Electricity Supply Plan

Uploaded: 15-06-2023

Development Work Plan

Uploaded: 28-07-2023

Affidavit

Uploaded: 15-06-2023

CA CERTIFICATE

Uploaded: 14-07-2023

ARCHITECT CERTIFICATE

Uploaded: 15-06-2023

ENGINEERS CERTIFICATE

Uploaded: 15-06-2023

Other

Uploaded: 15-06-2023

Permits

Orignal Permit NoPLG/BP/SM-30-sept-2022;15716
Orignal Permit Date10-04-2023
Valid Upto09-04-2028
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto10-04-2030
End Date10-04-2030
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Civitech Buildcon Private Limited
Contractor AddressH-71, Civitech House, Sector-63, NOIDA-201301, Gautambudh Nagar-UP
Architect NameAmit Kumar
Architect Address1st Floor , B-99, Sector-63, NOIDA- 201301 Gautambudh Nagar-UP
Architect Licence NumberCA/98/22706
Structural Engineer NameVMS Consultants Private Limited
Structural Engineer Address83/84 sakhar Bhawan, 230 Nariman Point Mumbai-400021
Mobile number(Project Co-ordinator)7838666259

Land Details

AFS

Showing 1 blocks with 429 units

Property Summary

Total Carpet Area

47571.90 m²

512059.17 ft²

Total Units

747

2 different types

Blocks & Floors

1

35 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:63.68 m²
Balconies:116
Parking ratio:0.00 per unit

Block CIVITECH SANTONI

429 units

Khasra Details

Total Area

15089.00 m²

162416.49 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoC-1B, Sector-16B, Greater Noida
Area(In Sq. Mt.)15089

Other Details

Contractor Name (if any)Civitech Buildcon Private Limited
Contractor AddressH-71, Civitech House, Sector-63, NOIDA-201301, Gautambudh Nagar-UP
Architect NameAmit Kumar
Architect Address1st Floor , B-99, Sector-63, NOIDA- 201301 Gautambudh Nagar-UP
Architect Licence NumberCA/98/22706
Structural Engineer NameVMS Consultants Private Limited
Structural Engineer Address83/84 sakhar Bhawan, 230 Nariman Point Mumbai-400021
Mobile number(Project Co-ordinator)7838666259