North East-Project Steeler Plot No:GH-10, South West 24m Road, South East 24m Road, North West 24m Road.
2.0 m. high boundary wall and 1113 m. long with gate
6.0 m. wide internal road & 6.0 m. wide road around the tower for circulation
Total footpath area is 3700 sq. m.
Drinking water facility with UGT & overhead tank & water supply rings all along the towers.
External Sewerage with STP
External storm water drainage with RWH
Total green Area is 20200 Sq. mt.
524 nos
Toal load of project 6000 KVA the capaccity of transformer of 4x 2000 KVA and DG SET 4x 1500KVA ( Total electriacl load = 6000 KVA)
yes g+2 planned
STP of 500 KLD with flushing Gardening System.
Solid waste management System is planned as Per inviorment clearance by (EIA).
12 Nos of RWH 6m Deep
As per guidelines of ministry of renewable energy Govt. of India.
Sprinklers and Alarm Sytem are proposed for towers more than 60m ht.
N/A
As per fire norms & fire NOC is received
Commmunity Center & Pool
Showing 18 blocks with 578 units
Total Carpet Area
159409.63 m²
1715869.32 ft²
Total Units
2036
4 different types
Blocks & Floors
18
21 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
65330.00 m²
703205.59 ft²