OngoingActive

BELVEDERE (Phase - 2: Tower E F & G)

Gautam Buddha Nagar, Uttar Pradesh
13-03-2015
RERA Received Date
Ongoing
Type
30-12-2022
Completion Date

Overview

RERA Received Date

13-03-2015

Completion Date

30-12-2022

RERA ID

UPRERAPRJ4480

Location

Latitude

28.557743

Longitude

77.389043

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)8844
Project NameBELVEDERE (Phase - 2: Tower E F & G)
Registration Fee (in Rs.)49500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)94
DistrictGautam Buddha Nagar
Original Start Date13-03-2015
TehsilGautam Buddha Nagar
Proposed Start Date13-03-2015
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)0
Proposed Completion Date30-12-2022

Bank Details

Account no.6420002900000140
Name Of Account HolderSequel Buildcon Pvt. Ltd.
Bank NamePUNJAB NATIONAL BANK
Branch AddressLarge Corporate Branch, Sector - 63, Noida
Branch NameLCB, Sector - 63
IFSC CodePUNB0642000

Development Works

Demarcation of Plots

Not applicable

Boundary Wall

Entire periphery. .

Road Work

CC Road

Footpaths

Stump concrete , tile and stone

Water Supply Including Drinking Water Facilities

Each Tower will have over Head Tank to plumbing and Fire domestic wter. Over head tanks will be connected with the under ground tank provided in the project.

Sewer System

Underground system using uPVC Sewer pipes.

Drain

Underground system using uPVC pipes.

Parks

As per landscape drawings.

Tree Planting

As per landscape layout plan.

Design For Electric Supply Including Street Lighting

Two Electricity Transformers of 3000 KVA capacity each shall be used along with necessary switch-gear for distributing electricity at LT voltage .

Community Buildings

Built up area of community buildings shall be 771.40 sq. m.

Treatment and Disposal System of Sewage and Sullage water

STP shall be provided. Treated water shall be used for flushing, irrigation, pathways cleaning and excess sewage shall be discharged in the municipal sewer.

Solid Waste Management And Disposal System

Solid waste to be collected from door to door and transported in covered vehicles to the waste disposal plants.

Water Conservation System

8 Nos. sets of recharge Pits and desilting tank.

Energy Management System Including Use of Renewable Energy

Led Light fixtures sto be used for the conservation of electricity.

Fire Protection And Fire Safety System

A fire rising main will be laid in the campus which will feed wet risers of various towers and also the yard hydrants. Fire alarm system with hooters at all floors and fire control panel at the ground floor shall be provided.

Social Infrastructure And Other Public Amenities Including Public Health Services

STP, organic waste converter shall be provided.

Emergency Evacuation Services

Staircases shall be provided In Basement & all the Towers for fire/ emergency exit as per NBC.

Other Miscellaneous Work

Not applicable

Documents

Registry Document

No: 5129 | Date: 11-12-2014

Details of Encumbrances

Uploaded: 28-01-2022

Commencement Certificate

Uploaded: 26-07-2018

Waste Disposal Plan

Uploaded: 26-07-2018

Water Supply Plan

Uploaded: 26-07-2018

Electricity Supply Plan

Uploaded: 26-07-2018

Development Work Plan

Uploaded: 26-07-2018

CA CERTIFICATE

Uploaded: 30-07-2018

ARCHITECT CERTIFICATE

Uploaded: 30-07-2018

ENGINEERS CERTIFICATE

Uploaded: 30-07-2018

Registry Document In Case of Own Land

Uploaded: 29-07-2017

Authentic copy of Approval of Project

Uploaded: 29-07-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 29-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 29-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 29-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 29-07-2017

Floor plans of all types

Uploaded: 29-07-2017

Floor plans of all types

Uploaded: 29-07-2017

Proforma of Application Form

Uploaded: 29-07-2017

Proforma of Allotment Letter

Uploaded: 29-07-2017

Affidavit

Uploaded: 29-07-2017

Permits

Orignal Permit NoNOIDA/CAP/2015/IV-1419/778
Orignal Permit Date13-03-2015
Valid Upto13-03-2020
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto13-03-2025
End Date31-12-2020
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Inhouse
Contractor AddressInhouse
Architect NameAR. DHARMNDRA
Architect AddressNoida
Architect Licence NumberCA/2001/27401
Structural Engineer NameVAKIL MEHTA SHETH CONSULTING ENGINEERS
Structural Engineer Address83/84, SAKHAR BHAVAN, 230, NARIMAN POINT, MUMBAI
Mobile number(Project Co-ordinator)9582006011

Land Details

AFS

Showing 3 blocks with 117 units

Property Summary

Total Carpet Area

30095.04 m²

323940.00 ft²

Total Units

264

3 different types

Blocks & Floors

3

25 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:114.00 m²
Balconies:488
Parking ratio:0.00 per unit

Block TOWER E

42 units

Block TOWER F

25 units

Block TOWER G

50 units

Khasra Details

Total Area

30000.00 m²

322917.00 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoSC-01/A1-ALPHA, SEC-79 NOIDA
Area(In Sq. Mt.)30000

Other Details

Contractor Name (if any)Inhouse
Contractor AddressInhouse
Architect NameAR. DHARMNDRA
Architect AddressNoida
Architect Licence NumberCA/2001/27401
Structural Engineer NameVAKIL MEHTA SHETH CONSULTING ENGINEERS
Structural Engineer Address83/84, SAKHAR BHAVAN, 230, NARIMAN POINT, MUMBAI
Mobile number(Project Co-ordinator)9582006011