Total Units
348
2 unit types
Carpet Area
3,25,227 ft²
30,214.64 m² · carpet only, excludes balcony
Blocks & Floors
4
93 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 935 ft² (86.82 m²)Balconies 616Parking per unit 0.00
All blocks
Showing 50 of 145 rows · 7 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit | Balconies | Balcony Areatotal |
|---|---|---|---|---|---|---|
| TOWER A | 1 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 2 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 3 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 4 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 5 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 6 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 7 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 8 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 9 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 10 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 11 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 12 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 13 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 14 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 15 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 16 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 17 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 18 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 19 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 20 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 21 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 22 | 3 BHK | 4 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER A | 23 | 4 BHK | 1 | 2,346 ft²217.94 m² | 6 | 543 ft²50.47 m² |
| TOWER A | 23 | 4 BHK | 1 | 2,285 ft²212.31 m² | 6 | 544 ft²50.50 m² |
| TOWER A | 24 | 4 BHK | 1 | 2,346 ft²217.94 m² | 6 | 543 ft²50.47 m² |
| TOWER A | 24 | 4 BHK | 1 | 2,285 ft²212.31 m² | 6 | 544 ft²50.50 m² |
| TOWER A | 25 | 4 BHK | 1 | 2,346 ft²217.94 m² | 6 | 543 ft²50.47 m² |
| TOWER A | 25 | 4 BHK | 1 | 2,285 ft²212.31 m² | 6 | 544 ft²50.50 m² |
| TOWER A | 26 | 4 BHK | 1 | 2,346 ft²217.94 m² | 6 | 543 ft²50.47 m² |
| TOWER A | 26 | 4 BHK | 1 | 2,285 ft²212.31 m² | 6 | 544 ft²50.50 m² |
| TOWER B | 1 | 3 BHK | 2 | 797 ft²74.04 m² | 4 | 212 ft²19.70 m² |
| TOWER B | 1 | 3 BHK | 2 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER B | 2 | 3 BHK | 2 | 797 ft²74.04 m² | 4 | 212 ft²19.70 m² |
| TOWER B | 2 | 3 BHK | 2 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER B | 3 | 3 BHK | 2 | 797 ft²74.04 m² | 4 | 212 ft²19.70 m² |
| TOWER B | 3 | 3 BHK | 2 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER B | 4 | 3 BHK | 2 | 797 ft²74.04 m² | 4 | 212 ft²19.70 m² |
| TOWER B | 4 | 3 BHK | 2 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER B | 5 | 3 BHK | 2 | 797 ft²74.04 m² | 4 | 212 ft²19.70 m² |
| TOWER B | 5 | 3 BHK | 2 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER B | 6 | 3 BHK | 2 | 797 ft²74.04 m² | 4 | 212 ft²19.70 m² |
| TOWER B | 6 | 3 BHK | 2 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER B | 7 | 3 BHK | 2 | 797 ft²74.04 m² | 4 | 212 ft²19.70 m² |
| TOWER B | 7 | 3 BHK | 2 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER B | 8 | 3 BHK | 2 | 797 ft²74.04 m² | 4 | 212 ft²19.70 m² |
| TOWER B | 8 | 3 BHK | 2 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER B | 9 | 3 BHK | 2 | 797 ft²74.04 m² | 4 | 212 ft²19.70 m² |
| TOWER B | 9 | 3 BHK | 2 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
| TOWER B | 10 | 3 BHK | 2 | 797 ft²74.04 m² | 4 | 212 ft²19.70 m² |
| TOWER B | 10 | 3 BHK | 2 | 875 ft²81.27 m² | 4 | 212 ft²19.70 m² |
Total Plot Area
7.41 acres
30,000.00 m² · plot area
Not applicable
Entire periphery.
CC Road
Stump concrete , tile and stone
Each Tower will have over Head Tank to plumbing and Fire domestic wter. Over head tanks will be connected with the under ground tank provided in the project.
Underground system using uPVC Sewer pipes.
Underground system using uPVC pipes.
As per landscape drawings.
As per landscape layout plan.
Two Electricity Transformers of 3000 KVA capacity each shall be used along with necessary switch-gear for distributing electricity at LT voltage .
Built up area of community buildings shall be 771.40 sq. m.
STP shall be provided. Treated water shall be used for flushing, irrigation, pathways cleaning and excess sewage shall be discharged in the municipal sewer.
Solid waste to be collected from door to door and transported in covered vehicles to the waste disposal plants.
8 Nos. sets of recharge Pits and desilting tank.
Led Light fixtures sto be used for the conservation of electricity.
A fire rising main will be laid in the campus which will feed wet risers of various towers and also the yard hydrants. Fire alarm system with hooters at all floors and fire control panel at the ground floor shall be provided.
STP, organic waste converter shall be provided.
Staircases shall be provided In Basement & all the Towers for fire/ emergency exit as per NBC.
Not applicable
BELVEDERE (Phase-1: Tower A B C & D) is located in Gautam Buddha Nagar.
Yes. BELVEDERE (Phase-1: Tower A B C & D) is registered under UPRERAPRJ4397 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for BELVEDERE (Phase-1: Tower A B C & D) is 30 December 2022.
BELVEDERE (Phase-1: Tower A B C & D) is developed by SEQUEL BUILDCON PVT. LTD.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.