NewActive

Anthurium

Gautam Buddha Nagar, Uttar Pradesh
15-10-2018
Launch Date
New
Type
04-04-2024
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

04-04-2024

RERA ID

UPRERAPRJ17793

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)20002
Project NameAnthurium
Registration Fee (in Rs.)211000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)66
DistrictGautam Buddha Nagar
Original Start Date-
TehsilGautam Buddha Nagar
Proposed Start Date15-10-2018
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)21056
Proposed Completion Date04-04-2024

Location

Latitude

28.592568

Longitude

77.385001

Bank Details

Account no.918020009947940
Name Of Account HolderAircon Systems India Pvt. Ltd.
Bank NameAxis Bank Ltd
Branch AddressThe Corenthum, A-41, Sector-62, Noida, G.B Nagar U.P.
Branch NameSector-62, Noida, G.B Nagar U.P.
IFSC CodeUTIB0000723

Development Works

Demarcation of Plots

Plots is demarcated as per Lease Plan issued by the Noida Authority.

Boundary Wall

Brick and Masonary Boundary Wall 2.0 m height from Internal wall.

Road Work

Interlocking Pavers and Trimix cement concrete with mix pattern.

Footpaths

Interlocking Pavers.

Water Supply Including Drinking Water Facilities

Under Ground and Over Head Water Tank.

Sewer System

Sewer system Designed as per Norms.

Drain

Under Ground drain system as per IS standard.

Parks

Designed as per Sanctioned Drawing and Authority Guidelines.

Tree Planting

As per designed Noida Authority Guidelines.

Design For Electric Supply Including Street Lighting

Design for Electricity supply including street Lighting as per Guidelines of UPPCL.

Community Buildings

N.A

Treatment and Disposal System of Sewage and Sullage water

Treatment of Sullage and Sewage will be through STP Plant.

Solid Waste Management And Disposal System

Soil waste management will be by Manual Segregation and handling.

Water Conservation System

Rain water harvesting facilities shall be provided and Recycle water shall be used for irrigation.

Energy Management System Including Use of Renewable Energy

Energy efficient building with Energy efficient glazing and single point metering.

Fire Protection And Fire Safety System

As per Fire Approval drawing.

Social Infrastructure And Other Public Amenities Including Public Health Services

STP, WTP and Water Bodies.

Emergency Evacuation Services

Fire Staircases and Emergency Exits.

Other Miscellaneous Work

N.A

Documents

Lease Deed

No: 1164 | Date: 28-03-2007

Other Plan(If Any)

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

CA CERTIFICATE

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 14-10-2018

Commencement Certificate

Uploaded: 13-10-2018

Proforma of Application Form

Uploaded: 15-10-2018

Proforma of Allotment Letter

Uploaded: 15-10-2018

Waste Disposal Plan

Uploaded: 15-10-2018

Water Supply Plan

Uploaded: 15-10-2018

Electricity Supply Plan

Uploaded: 15-10-2018

Development Work Plan

Uploaded: 15-10-2018

Affidavit

Uploaded: 15-10-2018

Permits

Orignal Permit NoV-939
Orignal Permit Date08-10-2018
Valid Upto07-10-2023
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto06-10-2023
End Date05-10-2023
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit NoNOIDA/CAP/2018/V-939/394
Orignal Permit Date04-01-2019
Valid Upto03-01-2024
Revalidated Permit NoNOIDA/CAP/2018/V-939/394
Revalidated Permit Date04-01-2019
Revalidated Permit Valid Upto01-01-1900
Permit Extendable Upto03-01-2024
End Date05-10-2023
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)NA
Contractor AddressNA
Architect NameHolistics Urban Innovations Pvt. Ltd
Architect AddressTerrace Floor, Tower A, The Corenthum, A-41, Sector-62, Noida, Uttar Pradesh
Architect Licence NumberCA/95/18656
Structural Engineer NameEngineering Solutions
Structural Engineer Address701, 7Th Floor, Tower 1, The Ithum, A-40, Sector-62, Noida, Uttar Pradesh
Mobile number(Project Co-ordinator)9818822551

Land Details

AFS

Showing 2 blocks with 251 units

Property Summary

Total Carpet Area

35208.50 m²

378980.77 ft²

Total Units

633

2 different types

Blocks & Floors

2

16 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:55.62 m²
Balconies:221
Parking ratio:0.00 per unit

Block A

148 units

Block B

103 units

Khasra Details

Total Area

20002.00 m²

215299.53 ft²

1 plot
Plot
TypePlot
Khasra/Plot No3
Area(In Sq. Mt.)20002.00

Other Details

Contractor Name (if any)NA
Contractor AddressNA
Architect NameHolistics Urban Innovations Pvt. Ltd
Architect AddressTerrace Floor, Tower A, The Corenthum, A-41, Sector-62, Noida, Uttar Pradesh
Architect Licence NumberCA/95/18656
Structural Engineer NameEngineering Solutions
Structural Engineer Address701, 7Th Floor, Tower 1, The Ithum, A-40, Sector-62, Noida, Uttar Pradesh
Mobile number(Project Co-ordinator)9818822551