Launch Date
Completion Date
RERA ID
28.577169201337846
77.36998242508135
N/A
Boundary wall has been designed & completed at Site.
All road work TRE-MIX has been completed at Site.
Internal landscape footpaths have been completed.
are being laid to all apartments
Internally has been laid.
All internal & external have been completed.
There is a Green Area in the non Tower Zone, which Acts as a Park.
Planting of various types of Evergreen Trees have been planted in the monsoon.
5 Mtr. & 3 Mtr. Poles Street Lights have been planned along the road.
A Club with all facility have been provided.
AW STP has been planned in Basement Two.
An Organic Waste Composite Machine has been provided.
Rain water harvesting has been planned at site.
Solar Power Panel has been installed for use of Renewable Energy.
Sprinklers & Smoke Detectors have been provided in all apartments.
N/A
Refuge Area have been planned as per specification.
Addition Stack Car Parking has been provided.
Showing 7 blocks with 191 units
Total Carpet Area
30796.92 m²
331494.97 ft²
Total Units
270
4 different types
Blocks & Floors
7
24 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
14187.80 m²
152716.06 ft²