Launch Date
Completion Date
RERA ID
28.607878
77.445478
Not applicable
2100 mm high, along entire periphery.
Interlocking Pavers
Interlocking Pavers
OHT OF DOMESTIC TANK ARE AS FOLLOWINGS :
Underground system using uPVC (SN-4) Sewer pipes.
Underground system using uPVC (SN-4) pipes.
Parks having total area of 3358.68 sq. m. shall be provided.
112 Nos. trees are to be planted out of that 50% will be evergreen tree.
Two Electricity Transformers of 1600 KVA capacity each shall be used along with necessary switch-gear for distributing electricity at LT voltage .
Built up area of community buildings shall be 771.40 sq. m.
STP of capacity 155 KLD shall be provided. Treated water shall be used for flushing, irrigation, pathways cleaning and excess sewage shall be discharged in the municipal sewer.
Manual collection and organic waste converter shall be provided.
6 No. sets of recharge Pits (4.5 x 1.75 x 2m effective depth) and desilting tank (2.5 x 1.75 x 2 m effective depth) shall be provided.
Solar panels shall be provided on terrace for renewable energy. 30.92 kw solar backup has been proposed. Single point metering will be there for energy purchased from the grid/ power supply company.
Fire tender path shall be provided as per NBC. Fire fighting systems along with pumps and UGT of Fire tank capacity 200KL (common) and OHT of Fire tank capacity 10KL (each block) shall be provided as per NBC & NOC from fire depp.
STP, organic waste converter shall be provided.
Staircases shall be provided In Basement & all the Towers for fire/ emergency exit as per NBC.
Not applicable
Showing 1 blocks with 17 units
Total Carpet Area
1042.48 m²
11221.15 ft²
Total Units
46
1 different types
Blocks & Floors
1
3 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
53960.00 m²
580820.04 ft²