Total Units
2,447
3 unit types
Carpet Area
15,00,76,774 ft²
1,39,42,602.00 m² · carpet only, excludes balcony
Blocks & Floors
1
18 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 61,331 ft² (5,697.83 m²)Balconies 495Parking per unit 0.002 of 27 rows list no units (2 floors are empty), so they add nothing to these totals
All blocks
Showing 27 of 27 rows · 7 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit | Balconies | Balcony Areatotal |
|---|---|---|---|---|---|---|
| Commercial | BSMNT3 | SHOP | 251 | 78,759 ft²7,317.00 m² | — | — |
| Commercial | GF | SHOP | 97 | 75,089 ft²6,976.00 m² | — | — |
| Commercial | 1 | SHOP | 82 | 68,792 ft²6,391.00 m² | — | — |
| Commercial | 2 | SHOP | 81 | 72,646 ft²6,749.00 m² | — | — |
| Commercial | 3 | OTHER | 1189 | 85,239 ft²7,919.00 m² | — | — |
| Commercial | 4 | OTHER | 65 | 15,102 ft²1,403.00 m² | — | — |
| Commercial | 5 | OTHER | 66 | 15,597 ft²1,449.00 m² | — | — |
| Commercial | 6 | OTHER | — | 29,913 ft²2,779.00 m² | — | — |
| Commercial | 7 | OTHER | 56 | 19,171 ft²1,781.00 m² | 45 | 1,776 ft²165.00 m² |
| Commercial | 8 | OTHER | 56 | 19,171 ft²1,781.00 m² | 45 | 1,776 ft²165.00 m² |
| Commercial | 9 | OTHER | 56 | 19,171 ft²1,781.00 m² | 45 | 1,776 ft²165.00 m² |
| Commercial | 10 | OTHER | 56 | 19,171 ft²1,781.00 m² | 45 | 1,776 ft²165.00 m² |
| Commercial | 11 | OTHER | — | 29,913 ft²2,779.00 m² | — | — |
| Commercial | 12 | STUDIO | 32 | 11,108 ft²1,032.00 m² | 26 | 1,023 ft²95.00 m² |
| Commercial | 13 | STUDIO | 32 | 11,108 ft²1,032.00 m² | 26 | 1,023 ft²95.00 m² |
| Commercial | 14 | STUDIO | 32 | 11,108 ft²1,032.00 m² | 26 | 1,023 ft²95.00 m² |
| Commercial | 15 | STUDIO | 32 | 11,108 ft²1,032.00 m² | 26 | 1,023 ft²95.00 m² |
| Commercial | 16 | STUDIO | 32 | 11,108 ft²1,032.00 m² | 26 | 1,023 ft²95.00 m² |
| Commercial | 17 | STUDIO | 32 | 11,108 ft²1,032.00 m² | 26 | 1,023 ft²95.00 m² |
| Commercial | 18 | STUDIO | 32 | 11,108 ft²1,032.00 m² | 26 | 1,023 ft²95.00 m² |
| Commercial | 12 | OTHER | 24 | 8,073 ft²750.00 m² | 19 | 753 ft²70.00 m² |
| Commercial | 13 | OTHER | 24 | 8,073 ft²750.00 m² | 19 | 753 ft²70.00 m² |
| Commercial | 14 | OTHER | 24 | 8,073 ft²750.00 m² | 19 | 753 ft²70.00 m² |
| Commercial | 15 | OTHER | 24 | 8,073 ft²750.00 m² | 19 | 753 ft²70.00 m² |
| Commercial | 16 | OTHER | 24 | 8,073 ft²750.00 m² | 19 | 753 ft²70.00 m² |
| Commercial | 17 | OTHER | 24 | 8,073 ft²750.00 m² | 19 | 753 ft²70.00 m² |
| Commercial | 18 | OTHER | 24 | 8,073 ft²750.00 m² | 19 | 753 ft²70.00 m² |
Total Plot Area
8.73 acres
35,312.00 m² · plot area
Attached
Proposed 2100 mm high boundary wall with stone cladding and MS railing.
Fire tender road in R.C.C around the building.
1m-1.2m wide footpath with stamp concrete/Paver tiles.
1. Water source is Noida Authority. 2. Authority water treated by WTP and feeding to end user. 3. For flushing water through STP
Yes, 370 KL STP system with latest Lamella technology.
Strom water drains diverting to rainwater harvesting pits and over flow connected to municipal drain.
Total green area 11160 sqm (for phase 1 only)
Total number of trees proposed for phase 1 (Pro data basis) 160 nos.
33 KV grid supply step down to 440V in three phase.
N/A
1. Sewage is treated through STP (370 KL) and water used for flushing, cooling towers and irrigation. 2. Waste of the sewage is collected in sludge tank and after full decomposition handed over to competent vendor.
As per the directions noted through guidelines for achieving gold rated lead certification.
1. Rainwater harvesting pits 2. STP water used for flushing, cooling towers and irrigation.
1. All High side equipment’s (chillers, pumps, motors and AHU’s are proposed very energy efficient according the Gold rated building. 2. Heat recovery enthalpy wheel is proposed for energy saving. 3. All services is controlled by Building management system at one point. 4. Solar lights are proposed.
1. Fire sprinkler system on each level and floors. 2. Fire hydrant system 3. the smoke detection and PA system 4. Water curtain in basement 5. FHC is fully loaded with their accessories. 6. Fire extinguisher and 2 hrs rated fire doors on stair case and services areas.
N/A
1. All level is to be marked with fire exit direction signage and building evacuation plan 2. Full building is loaded with fire annunciation system (MCP, and fire man telephone points) 3. According to fire norms fire refuse areas is also proposed 4. Fresh air and smoke evacuation is also proposed on each level.
N/A
52nd Avenue (Phase-I) is located in Gautam Buddha Nagar.
Yes. 52nd Avenue (Phase-I) is registered under UPRERAPRJ7156 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for 52nd Avenue (Phase-I) is 29 March 2023.
52nd Avenue (Phase-I) is developed by MMR SAHA INFRASTRUCTURE PRIVATE LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.