OngoingActive

52nd Avenue (Phase-I)

Gautam Buddha Nagar, Uttar Pradesh
20-03-2014
RERA Received Date
Ongoing
Type
29-03-2023
Completion Date

Overview

RERA Received Date

20-03-2014

Completion Date

29-03-2023

RERA ID

UPRERAPRJ7156

Location

Latitude

28.588716

Longitude

77.373301

Basic Details

Project TypeOngoing
Project CategoryCommercial
Total area in round figure (Sq.mt.)21659
Project Name52nd Avenue (Phase-I)
Registration Fee (in Rs.)227000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)109
DistrictGautam Buddha Nagar
Original Start Date15-05-2013
TehsilDadri
Proposed Start Date20-03-2014
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)34000
Proposed Completion Date29-03-2023

Bank Details

Account Details
Name of the AccountMMR Saha Infrastructure Pvt. Ltd. 52nd Avenue Collection Account
Account Number918020050952122
Bank NameAxis Bank
Branch NameSector 62, NOIDA
Branch AddressTower A, Plot No. Office No. 1, Ground Floor, The Corenthum A/41, Sector 62, NOIDA, Uttar Pradesh
IFSC CodeUTIB0000723
Branch DistrictGautam Buddha Nagar
Transaction Account Details
Name of the AccountMMR Saha Infrastructure Pvt. Ltd.
Account Number916020072565737
Bank NameAxis Bank
Branch NameSector 62, NOIDA
Branch AddressTower A, Plot No. Office No. 1, Ground Floor, The Corenthum, A/41, Sector 62, NOIDA, Uttar Pradesh
IFSC CodeUTIB0000723
Branch DistrictGautam Buddha Nagar

Development Works

Demarcation of Plots

Attached

Boundary Wall

Proposed 2100 mm high boundary wall with stone cladding and MS railing.

Road Work

Fire tender road in R.C.C around the building.

Footpaths

1m-1.2m wide footpath with stamp concrete/Paver tiles.

Water Supply Including Drinking Water Facilities

1. Water source is Noida Authority. 2. Authority water treated by WTP and feeding to end user. 3. For flushing water through STP

Sewer System

Yes, 370 KL STP system with latest Lamella technology.

Drain

Strom water drains diverting to rainwater harvesting pits and over flow connected to municipal drain.

Parks

Total green area 11160 sqm (for phase 1 only)

Tree Planting

Total number of trees proposed for phase 1 (Pro data basis) 160 nos.

Design For Electric Supply Including Street Lighting

33 KV grid supply step down to 440V in three phase.

Community Buildings

N/A

Treatment and Disposal System of Sewage and Sullage water

1. Sewage is treated through STP (370 KL) and water used for flushing, cooling towers and irrigation. 2. Waste of the sewage is collected in sludge tank and after full decomposition handed over to competent vendor.

Solid Waste Management And Disposal System

As per the directions noted through guidelines for achieving gold rated lead certification.

Water Conservation System

1. Rainwater harvesting pits 2. STP water used for flushing, cooling towers and irrigation.

Energy Management System Including Use of Renewable Energy

1. All High side equipment’s (chillers, pumps, motors and AHU’s are proposed very energy efficient according the Gold rated building. 2. Heat recovery enthalpy wheel is proposed for energy saving. 3. All services is controlled by Building management system at one point. 4. Solar lights are proposed.

Fire Protection And Fire Safety System

1. Fire sprinkler system on each level and floors. 2. Fire hydrant system 3. the smoke detection and PA system 4. Water curtain in basement 5. FHC is fully loaded with their accessories. 6. Fire extinguisher and 2 hrs rated fire doors on stair case and services areas.

Social Infrastructure And Other Public Amenities Including Public Health Services

N/A

Emergency Evacuation Services

1. All level is to be marked with fire exit direction signage and building evacuation plan 2. Full building is loaded with fire annunciation system (MCP, and fire man telephone points) 3. According to fire norms fire refuse areas is also proposed 4. Fresh air and smoke evacuation is also proposed on each level.

Other Miscellaneous Work

N/A

Documents

Lease Deed

No: 5531 | Date: 05-07-2011

Details of Encumbrances

Uploaded: 27-11-2019

Commencement Certificate

Uploaded: 10-10-2019

Other Plan(If Any)

Uploaded: 10-10-2019

Proforma of Application Form

Uploaded: 06-07-2018

Proforma of Allotment Letter

Uploaded: 06-07-2018

Proforma of Conveyance Deed

Uploaded: 19-10-2019

Waste Disposal Plan

Uploaded: 06-07-2018

Water Supply Plan

Uploaded: 06-07-2018

Electricity Supply Plan

Uploaded: 06-07-2018

Development Work Plan

Uploaded: 06-07-2018

Affidavit

Uploaded: 06-07-2018

CA CERTIFICATE

Uploaded: 04-12-2019

ARCHITECT CERTIFICATE

Uploaded: 04-03-2020

ENGINEERS CERTIFICATE

Uploaded: 29-11-2019

Registry Document In Case of Own Land

Uploaded: 31-07-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 31-07-2017

Affidavit

Uploaded: 31-07-2017

Permits

Orignal Permit Noiv-/329/656
Orignal Permit Date15-05-2013
Valid Upto14-05-2018
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto15-05-2023
End Date31-12-2020
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Skyline Engg. Contracts (I) Private Limited
Contractor AddressPlot No. 4, 3rd Floor, Kehar Singh Estate, Westend Marg, Said-UL-AJAB, M.B Road, New Delho-110030
Architect NameDeepali Srivastava
Architect AddressFlat No. 450, Block Q-6, Jalvayu Vihar, Sector 21, Noida- 201301
Architect Licence NumberCA/94/17098
Structural Engineer NameCivtech Consultants Private Limited
Structural Engineer AddressB-62, Lajpat Nagar-IV, New Delhi- 110024
Mobile number(Project Co-ordinator)8588944490

Land Details

AFS

Showing 1 blocks with 27 units

Property Summary

Total Carpet Area

13942602.00

150076773.67 ft²

Total Units

2447

3 different types

Blocks & Floors

1

20 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:5697.83
Balconies:495
Parking ratio:0.00 per unit

Block Commercial

27 units

Khasra Details

Total Area

35312.00

380094.84 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoE-01
Area(In Sq. Mt.)35312

Other Details

Contractor Name (if any)Skyline Engg. Contracts (I) Private Limited
Contractor AddressPlot No. 4, 3rd Floor, Kehar Singh Estate, Westend Marg, Said-UL-AJAB, M.B Road, New Delho-110030
Architect NameDeepali Srivastava
Architect AddressFlat No. 450, Block Q-6, Jalvayu Vihar, Sector 21, Noida- 201301
Architect Licence NumberCA/94/17098
Structural Engineer NameCivtech Consultants Private Limited
Structural Engineer AddressB-62, Lajpat Nagar-IV, New Delhi- 110024
Mobile number(Project Co-ordinator)8588944490