Have queries on this Project?
28.6568
77.481
Showing 1 blocks with 150 units
Total Carpet Area
2056.05 m²
22131.12 ft²
Total Units
150
1 different types
Blocks & Floors
1
5 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
6570.00 m²
70718.82 ft²
As per Layout
N.A.
Road pattern is provided in such a way that approach to the towers is motorable and section consists of Subgrade prepration with 1 layer GSB and 1 layer of WMM & black top
NA
System for drinking water is ground water and provided thru Underground/overhead Water tanks
Sewerage is collected through sewage lines upto the common STP established for the project and after treatment the sludge and treated water obtained shall be used in green areas like gardens,parks,green landscapes
Rain water collection shall be done from terrace thru storm water lines/covered drains at ground level and connected to rain harvesting pits.
There is no park,however provision of green area for entire project
Planned trees are provided along the boundarywall
Electrical connection for the project from PVVNL or its Licenscee/Sub-Licenscee and connection will be provided to customers thru prepaid meter and proportinate electricity infrastructure cost including feeder construction expenses,substations/panels/transformers/other equipments /expenses,cabling expenses,system loading charges ,security charges etc as applicable and further subject to regular payments of fixed elcectricity charges,usage/consumption charges and energy losses/line distribution losses and payment of taxes/cess/duties/levy as applicable and demanded from time to time
N.A.
STP provided for treating sewerage and the treated Sludge/water is being used for green areas
Collection system has been provided with a arrangment of separate collection of decomposable and non decomposable waste in separate bags and a treatment arrangement is done for the same
Underground recharge pits with perforated filter media used for rain water harvesting provided
N.A.
Vertical risers with FHC shaft/Sprinkler,MOEFA with pa system and a pump room with a provison of Jockey/Main/diesel pump etc is done
NIL
Fire Staircase provided
N.A.
Park Town Commercial Complex Phase 1(Block B) is located in Ghaziabad.
Yes. Park Town Commercial Complex Phase 1(Block B) is registered under UPRERAPRJ3055 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Park Town Commercial Complex Phase 1(Block B) is 18 April 2022.
Park Town Commercial Complex Phase 1(Block B) is developed by Aditya (Agarwal Associates Group).
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.
Developed by
13 Projects
EXECUTIVE SUMMARY Aditya Builders and Developers is the consumer-facing brand of the Agarwal Associates Group, a Delhi NCR-based real estate developer operating since 1979. The flagship operating company is Agarwal Assoc…
Know More about Aditya (Agarwal Associates Group)