ONGOINGActive

ONE ON ONE (PHASE-I)

GURUGRAM, WAZIRABAD ST
13-01-2020
Launch Date
ONGOING
Type
2022-09-19
Completion Date

Overview

Launch Date

13-01-2020

Completion Date

2022-09-19

RERA ID

RERA-GRG-484-2019

Basic Details

Project NameONE ON ONE (PHASE-I)
Project IDRERA-GRG-484-2019
Project TypeONGOING
Applicant TypeCompany
Submission Date13-01-2020 11:12:52 AM
Builder NameVATIKA ONE ON ONE PRIVATE LIMITED (FORMERLY KNOWN AS CALDER DEVELOPERS PVT. LTD.)
CINU70101DL2011PTC213593
PANXXXX937P
Emailvatika.rera@vatikagroup.com
Websitehttp://www.vatikagroup.com
Phone (Mobile)9810566938
Phone (Landline)01244177777
Registered AddressFLAT NO. 224A, 2ND FLOOR DEVIKA TOWER, 6, NEHRU PLACE NEW DELHI - 110019.
Project AddressSECTOR-16, VILLAGE SILOKHERA
DistrictGURUGRAM
TehsilWAZIRABAD ST

Bank Details

Bank NameHDFC BANK LTD. , FIRST INDIA PLACE, M.G.ROAD, GURUGRAM HARYANA-122002.
Account Number02800350000419
IFSC CodeHDFC0000280
MICR Code110240037
Branch Code0280

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Mr. Anil Bhalla-Hyde Park, Prakrati Marg, Sultanpur Farms, Gadaipur, South Delhi, Delhi 110030 Mr. Gautam Bhalla-LCG05 PHB, The Laburnam, Nathupur (67),Nathupur Gurgaon,Gurgaon, Haryana 122002 Mr. K. V. George-Flat No. 1504, Mohinder Apartment, Plot No 17, Sector 12, Dwarka, South West Delhi, Delhi 110075 Ms. Veena Bhoomia-C1/577B,Rear Block,1st Floor, Near Euro Kids School,Palam Vihar,Choma (62), Gurgaon, Haryana 122017
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Uploaded

Development Details

Land Area49093.349 (Sqr/mtrs)
Proposed FAR86.465
Permissible FAR175
Total Licensed Land49093.349 (Sqr/mtrs)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS9417.242
CONSTRUCTION OF ROADS0
PAVEMENTS0
PARKS AND PLAYGROUNDS0
GREEN BELTS0
VEHICLE PARKINGS5180.843
ELECTRICITY SUB-STATION260.458
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER34234.806
Total49093.349

Cost Details

Land Cost15200.00 Lakhs
Other Cost23142.00 Lakhs
Estimated Project Cost63342.00 Lakhs
Estimated Infrastructure Cost2500.00 Lakhs
Estimated Apartment Construction Cost22500.00 Lakhs

Documents

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 12-02-2020

DETAIL OF AUTHORISED SIGNATORY

Uploaded on: 12-02-2020

FIRE FIGHTING SCHEME

Uploaded on: 12-02-2020

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 12-02-2020

FOREST NOC

Uploaded on: 12-02-2020

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 12-02-2020

LC-IV AND BILATERAL AGREEMENT

Uploaded on: 12-02-2020

ENVIRONMENT CLEARANCE

Uploaded on: 12-02-2020

DETAILS OF UNITS WITH CONSTRUCTION STAGES

Uploaded on: 20-02-2020

DETAILS OF SEPARATE BANK ACCOUNT

Uploaded on: 11-03-2020

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 21-12-2019

ZONING PLAN

Uploaded on: 21-12-2019

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 21-12-2019

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 21-12-2019

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 21-12-2019

BLOCK 3 ELEVATION ABCD

Uploaded on: 13-01-2020

LICENSE NO 05 OF 2015

Uploaded on: 11-01-2020

LIST OF ARCHITECT ENGINEER ETC

Uploaded on: 11-01-2020

BASEMENT 1 FLOOR PLAN AREA CALCULATION

Uploaded on: 13-01-2020

BLOCK 4 6TH 7TH SERVICE FLOOR PLANS

Uploaded on: 13-01-2020

ENARGY CENTER 2ND MAZZENINE FLOOR PLANS

Uploaded on: 13-01-2020

CA CERTIFICATE

Uploaded on: 11-01-2020

BLOCK 4 ELE 1 AND 3

Uploaded on: 13-01-2020

BLOCK 3 2ND 3RD 4TH FLOOR PLANS

Uploaded on: 13-01-2020

BLOCK 2 TERRACE AND LMR FLOOR PLAN

Uploaded on: 13-01-2020

ENARGY CENTER

Uploaded on: 13-01-2020

ANNEXURE-3.3 (DEVELOPMENT PLAN)

Uploaded on: 11-01-2020

BLOCK 5 ELEVATION ABCD

Uploaded on: 13-01-2020

BLOCK 5 5TH 6TH FLOOR PLANS

Uploaded on: 13-01-2020

REP I (OLD)

Uploaded on: 11-01-2020

BLOCK 5 AREA CALCULATION AL FLOOR PLAN

Uploaded on: 13-01-2020

BLOCK 4 ELE 2 AND 4 SEC A AND B

Uploaded on: 13-01-2020

2 REGISTRATION CERTIFICATE

Uploaded on: 11-01-2020

BALANCE SHEET

Uploaded on: 11-01-2020

AKS SHEJRA WITH LAND DETAILS

Uploaded on: 11-01-2020

AGREEMENT FOR SALE

Uploaded on: 11-01-2020

LOCATION PLAN

Uploaded on: 11-01-2020

DETAIL OF PARKING

Uploaded on: 11-01-2020

AFS COMMERCIAL FINAL

Uploaded on: 11-01-2020

SECTORIAL MAP

Uploaded on: 11-01-2020

9 REVENUE RECORDS SALE DEED ETC

Uploaded on: 11-01-2020

SITE PLAN

Uploaded on: 11-01-2020

ENCUMBRANCES

Uploaded on: 11-01-2020

BLOCK 5 TERRACE AND LMR FLOOR PLAN

Uploaded on: 13-01-2020

SHAREHOLDERS

Uploaded on: 11-01-2020

BUILDING PLAN

Uploaded on: 11-01-2020

DEATIL OF UNIT

Uploaded on: 11-01-2020

BOOKING APPLICATION FORM

Uploaded on: 11-01-2020

BLOCK 4 GF 1ST FLOOR PLANS

Uploaded on: 13-01-2020

BLOCK 3 TERRACE AND LMR FLOOR PLAN

Uploaded on: 13-01-2020

MOA AND AOA

Uploaded on: 11-01-2020

ARCHITECT AND ENGINEER CERTIFICATE

Uploaded on: 11-01-2020

BLOCK 2 2ND 5TH FLOOR PLANS

Uploaded on: 13-01-2020

TIME PERIOD COMMITED TO ALLOTTEE

Uploaded on: 11-01-2020

BLOCK 2 ELE 1 AND 3

Uploaded on: 13-01-2020

REP II

Uploaded on: 11-01-2020

SERVICE PLAN

Uploaded on: 11-01-2020

COLLECTION STATEMENT

Uploaded on: 11-01-2020

CONVEYANCE DEED

Uploaded on: 11-01-2020

BLOCK 2 ELE 2 AND 4 SEC 1 AND 2

Uploaded on: 13-01-2020

BLOCK 3 5TH 6TH FLOOR PLANS

Uploaded on: 13-01-2020

29 CASH FLOW STATMENT

Uploaded on: 13-01-2020

BLOCK 4 TERRACE AND LMR FLOOR PLAN

Uploaded on: 13-01-2020

PAN CARD

Uploaded on: 11-01-2020

BASEMENT 3 FLOOR PLAN AREA CALCULATION

Uploaded on: 13-01-2020

BASEMENT 2 FLOOR PLAN AREA CALCULATION

Uploaded on: 13-01-2020

ZONING PLAN

Uploaded on: 11-01-2020

ALLOTTMENT LETTER RESIDENTIAL

Uploaded on: 11-01-2020

BLOCK 2 AREA CALCULATION AL FLOOR PLAN

Uploaded on: 13-01-2020

BLOCK 3 SEC AA AND BB

Uploaded on: 13-01-2020

BLOCK 4 AREA CALCULATION AL FLOOR PLAN

Uploaded on: 13-01-2020

ENERGY CENTER ELE A SEC 1

Uploaded on: 13-01-2020

BLOCK 2 GF 1ST FLOOR PLANS

Uploaded on: 13-01-2020

BLOCK 2 6TH 7TH FLOOR PLANS

Uploaded on: 13-01-2020

DEVELOPMENT WORK PLAN

Uploaded on: 11-01-2020

BLOCK 4 2ND 3RD 4TH 5TH FLOOR PLANS

Uploaded on: 13-01-2020

BLOCK 5 SEC AA AND BB

Uploaded on: 13-01-2020

BLOCK 5 GF 1ST FLOOR PLANS

Uploaded on: 13-01-2020

NON TOWER SECTION

Uploaded on: 13-01-2020

ENERGY CENTER AREA CALCULATION AL FLOOR PLAN

Uploaded on: 13-01-2020

ENARGY CENTER GF 1ST FLOOR PLANS

Uploaded on: 13-01-2020

19 PROJECT REPORT

Uploaded on: 13-01-2020

LIST OF DIRECTORS

Uploaded on: 11-01-2020

RESOLUTION FOR AUTHORISED SIGNATORY

Uploaded on: 11-01-2020

ADVERTISEMENT

Uploaded on: 11-01-2020

BLOCK 3 AREA CALCULATION AL FLOOR PLAN

Uploaded on: 13-01-2020

BLOCK 5 2ND 3RD 4TH FLOOR PLANS

Uploaded on: 13-01-2020

LOI - 12.13125 ACRES

Uploaded on: 12-02-2020

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 12-02-2020

AIRPORT HEIGHT CLEARANCE NOC

Uploaded on: 12-02-2020

Statutory Approvals

LAY OUT PLANDate: 18-05-2017Status: ALREADY BEEN OBTAINED
ZONING PLANDate: 07-08-2015Status: ALREADY BEEN OBTAINED
BUILDING PLANDate: 18-05-2017Status: ALREADY BEEN OBTAINED
SITE PLANDate: 18-05-2017Status: ALREADY BEEN OBTAINED
FLOOR PLANDate: 18-05-2017Status: ALREADY BEEN OBTAINED
APARTMENT PLANSDate: 18-05-2017Status: ALREADY BEEN OBTAINED
ELEVATION SECTIONDate: 18-05-2017Status: ALREADY BEEN OBTAINED
DETAIL OF PERMISSIBLE FARDate: 18-05-2017Status: ALREADY BEEN OBTAINED
DETAIL OF COVERED AREA ACHIEVED FAR.Date: 18-05-2017Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: No
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: Yes
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT
STPYET TO BE PREPARED
UNDERGROUND TANKYET TO BE PREPARED
RAIN WATER HARVESTINGYET TO BE PREPARED
ELECTRICAL SUB STATIONYET TO BE PREPARED
PARKINGYET TO BE PREPARED

NOC

ROADSProvider: HUDA/HSVPApproval Status: Pending
WATER SUPPLYProvider: HUDA/HSVPApproval Status: Pending
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: HUDA/HSVPApproval Status: Pending
STORM WATER DRAINAGEProvider: HUDA/HSVPApproval Status: Pending

Project Team

Authorized Representative

MR VIRENDER DHAR
Name
MR VIRENDER DHAR
PAN
XXXX232D
Email
vatika.rera@vatikagroup.com
Mobile
9810566938
Landline
01244177777
Address
Flat No. M-113SF Blossom-2 Artemis Hospital Sector-51 Gurgaon Smaspur Gurgaon- 122003.

Managing Director/CEO

NIL
Name
NIL
PAN
XXXX0000
Email
vatika.rera@vatikagroup.com
Mobile
0000000000
Landline
0000000000
Address
0000000000

Directors

MR BRIJ KISHORE SINGH
Name
MR BRIJ KISHORE SINGH
PAN
XXXX890G
Email
vatika.rera@vatikagroup.com
Mobile
9928017864
Landline
01244177777
Address
Baluda Road Sohna Gurgaon Haryana-122001 India.
MR BALBIR SINGH
Name
MR BALBIR SINGH
PAN
XXXX978L
Email
vatika.rera@vatikagroup.com
Mobile
9717792189
Landline
01244177777
Address
RZ-38 P2- 09 New Roshanpura Najafgarh Delhi-110043
RAVINDER KUMAR
Name
RAVINDER KUMAR
PAN
XXXX716G
Email
vatika.rera@vatikagroup.com
Mobile
9810997328
Landline
01244177777
Address
H.No. 1410 Sector -13 Hisar-125005

Contact Details

Project ContactEmail: vatika.rera@vatikagroup.comMobile: 9810656416Landline: 0000000000
Project Contact PersonName: SUBHASH GOELEmail: vatika.rera@vatikagroup.comMobile: 9810656416Landline: 0000000000

Land Details

Land Area49093.349 (Sqr/mtrs)
Proposed FAR86.465
Permissible FAR175
Total Licensed Land49093.349 (Sqr/mtrs)

Land Usage

Land Cost15200.00 Lakhs
Other Cost23142.00 Lakhs
Estimated Project Cost63342.00 Lakhs
Estimated Infrastructure Cost2500.00 Lakhs
Estimated Apartment Construction Cost22500.00 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
STP0
Other0
Parking28.06
Shopping area0
Street lighting0
Underground Tank0
Roads & Pavements100
Water Supply System100
Storm Water Drainage0
Parks and Playgrounds0
Rain Water Harvesting0
Electrical Sub station0
Renewable energy system0
Electricity Supply System0
Security and fire fighting0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2017 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres--00
Electrical Sub station--3.754.5
Electricity Supply System--33.6
Other--00
Parking--4.55.4
Parks and Playgrounds--0.750.9
Rain Water Harvesting--2.252.7
Renewable energy system--1.51.8
Roads & Pavements--13.516.2
STP--4.55.4
Security and fire fighting--8.259.9
Sewerage treatment & garbage disposal--7.59
Shopping area--00
Storm Water Drainage--67.2
Street lighting--33.6
Underground Tank--5.256.3
Water Supply System--11.2513.5
2018 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub station56.2578.3
Electricity Supply System455.66.64
Other0000
Parking67.58.49.96
Parks and Playgrounds11.251.41.66
Rain Water Harvesting33.754.24.98
Renewable energy system22.52.83.32
Roads & Pavements1822.525.229.88
STP67.58.49.96
Security and fire fighting1113.7515.418.26
Sewerage treatment & garbage disposal1012.51416.6
Shopping area0000
Storm Water Drainage81011.213.28
Street lighting455.66.64
Underground Tank78.759.811.62
Water Supply System1518.752124.9
2019 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub station11.5512.455.821.55
Electricity Supply System9.249.964.6417.24
Other0000
Parking13.8614.946.9625.86
Parks and Playgrounds2.312.491.164.31
Rain Water Harvesting6.937.473.4812.93
Renewable energy system4.624.982.328.62
Roads & Pavements41.5844.8120.8877.58
STP13.8614.946.9625.86
Security and fire fighting25.4127.3812.7647.41
Sewerage treatment & garbage disposal23.124.8911.643.1
Shopping area0000
Storm Water Drainage18.4819.929.2834.48
Street lighting9.249.964.6417.24
Underground Tank16.1717.438.1230.17
Water Supply System34.6537.3417.464.65
2020 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres000-
Electrical Sub station5.813.18.55-
Electricity Supply System4.6410.486.84-
Other000-
Parking6.9615.7210.26-
Parks and Playgrounds1.162.621.71-
Rain Water Harvesting3.487.865.13-
Renewable energy system2.325.243.42-
Roads & Pavements20.8847.1630.78-
STP6.9615.7210.26-
Security and fire fighting12.7628.8218.81-
Sewerage treatment & garbage disposal11.626.217.1-
Shopping area000-
Storm Water Drainage9.2820.9613.68-
Street lighting4.6410.486.84-
Underground Tank8.1218.3411.97-
Water Supply System17.439.325.65-

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSECOMBINATION OF MATERIALS SUCH AS STONE, HIGH QUALITY TILES IN COMMON AREAS
WALL FINISHING DETAILSCOMBINATION OF TILES & PAINT IN COMMON AREAS.
KITCHEN DETAILSNOT APPLICABLE
BATHROOM FITTINGSSANITARY WARE OF STANDARD MAKE AND BRANDS FOR COMMON TOILETS.
WOOD WORK ETCNOT APPLICABLE
DOORS AND WINDOS FRAMESNOT APPLICABLE
GLASS WORKNOT APPLICABLE
ELECTRIC FITTINGSNOT APPLICABLE
CONDUCTING AND WIRING DETAILSIS COMPLIANT WIRING IN COMMON AREAS.
CUPBOARD DETAILSNOT APPLICABLE
WATER STORAGEOHT & UG TANKS
LIFT DETAILSPASSENGER ELEVATORS DESIGNED TO CATER FOR THE EXPECTED TRAFFIC WITH HIGH QUALITY FINISHES. DEDICATED SERVICE LIFT FOR MOVEMENT OF GOODS AND MATERIALS ONE PER BLOCK
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSGLAZED ALUMINUM WINDOWS AND FENESTRATION ALONG WITH CURTAIN GLASS IN LOCATIONS
DOORSNA
MAIN DOORSNOT APPLICABLE
INTERNAL DOORSNOT APPLICABLE
AIR CONDITIONINGOFFICE SPACE SHALL BE AIR-CONDITIONED THROUGH HIGHLY ENERGY EFFICIENT CENTRAL A.C. SYSTEM WITH BMS
ELECTRICAL FITTINGSIS COMPLIANT PROVISIONING FOR CRITICAL LIGHTING IN AREAS OF CIRCULATION AND EMERGENCY USAGE
CNG PIPE LINENOT APPLICABLE
PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
EXTERNAL FINISHING/COLOUR SCHEMEA COMBINATION OF MATERIALS OF INTERNATIONAL STANDARDS SUCH AS CLADDING, HIGH QUALITY PAINT ETC
INTERNAL FINISHINGCOMBINATION OF MATERIALS SUCH AS STONE, HIGH QUALITY TILES, WALL AND CEILING FINISHES FOR COMMON AREAS

Unit-wise Specifications

TOILET
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
COUNTERSNOT APPLICABLE
SANITARY WARE/CP FITTINGSNOT APPLICABLE
FIXTURESNOT APPLICABLE
KITCHEN
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
COUNTERSNOT APPLICABLE
FIXTURESNOT APPLICABLE
KITCHEN APPLIANCESNOT APPLICABLE
SIT-OUTS
FLOORNOT APPLICABLE
WALLS & CEILINGNOT APPLICABLE
RAILINGSNOT APPLICABLE
FIXTURESNOT APPLICABLE
BED ROOMS
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
WARDROBESNOT APPLICABLE
MASTER TOILET
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
COUNTERSNOT APPLICABLE
SANITARY WARE/CP FITTINGSNOT APPLICABLE
FITTING/FIXTURESNOT APPLICABLE
MASTER BEDROOM/DRESSROOM
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
MODULAR WARDROBESNOT APPLICABLE
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORNOT APPLICABLE
WALLS & CEILINGNOT APPLICABLE
TOILETNOT APPLICABLE
BALCONYNOT APPLICABLE

Fee Details

Payment 1
amount:850000.00
cheque no:56942
draft date:28-07-2017
payable to:HRERA Gurugram
payee bank:HDFC BANK LIMITED