NEWActive

ORCHID IVY

GURUGRAM, GURGAON
28-02-2022
Launch Date
NEW
Type
2026-01-01
Completion Date

Overview

Launch Date

28-02-2022

Completion Date

2026-01-01

RERA ID

RERA-GRG-996-2021

Basic Details

Project NameORCHID IVY
Project IDRERA-GRG-996-2021
Project TypeNEW
Applicant TypeCompany
Submission Date28-02-2022 06:16:39 PM
Builder NameM/S ORCHID INFRASTRUCTURE DEVELOPERS PVT. LTD.
CINU40102DL1993PTC052875
PANXXXX370M
Emaillegal@oidpl.com
Websitehttps://www.oidpl.com
Phone (Mobile)9310088046
Phone (Landline)01244590000
Registered AddressLEVEL II GLOBAL ARCADE, MEHRAULI GURGAON ROAD, GURUGRAM
Project AddressM BLOCK, MAYFIELD GARDEN, SECTOR-51, GURGAON, HARYANA
DistrictGURUGRAM
TehsilGURGAON

Bank Details

Bank NameICICI BANK
Account Number245105001552
IFSC CodeICICI0002451
MICR Code110229222
Branch Code2451

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)AJAY GOEL (Dir.) Address-H.No. D-146 Sector-27 Block-D Noida Uttar Pradesh & R.C SHARMA (Sr. V.P Project)
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)YES

Development Details

Land Area4152.75 (Sqr/mtrs)
Proposed FAR264
Permissible FAR10963.26
Total Licensed Land331.846 (Sqr/mtrs)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS4152.75
CONSTRUCTION OF ROADS0
PAVEMENTS0
PARKS AND PLAYGROUNDS0
GREEN BELTS0
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
Total4152.75

Cost Details

Land Cost1376.52 Lakhs
Other Cost694.74 Lakhs
Estimated Project Cost5982.54 Lakhs
Estimated Infrastructure Cost149.5 Lakhs
Estimated Apartment Construction Cost3761.78 Lakhs

Documents

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 29-12-2021

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 29-12-2021

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 29-12-2021

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 29-12-2021

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 29-12-2021

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 26-02-2022

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 26-02-2022

732, REAR ELEVATION & SECTION

Uploaded on: 02-08-2022

ALL BUILDING PLAN LETTERS

Uploaded on: 01-08-2022

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 01-08-2022

COURT DECREE

Uploaded on: 01-08-2022

DEMARCATION PLAN

Uploaded on: 01-08-2022

ZONING PLAN

Uploaded on: 01-08-2022

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 01-08-2022

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 02-08-2022

727, FRONT ELEVATION & FLOOR PLANS

Uploaded on: 02-08-2022

727, REAR ELEVATION & SECTION

Uploaded on: 02-08-2022

727, SITE PLAN & FLOOR PLANS

Uploaded on: 02-08-2022

728, FRONT ELEVATION & FLOOR PLANS

Uploaded on: 02-08-2022

728, REAR ELEVATION & SECTION

Uploaded on: 02-08-2022

728, SITE PLAN & FLOOR PLANS

Uploaded on: 02-08-2022

729, FRONT ELEVATION & FLOOR PLANS

Uploaded on: 02-08-2022

729, REAR ELEVATION & SECTION

Uploaded on: 02-08-2022

729, SITE PLAN & FLOOR PLANS

Uploaded on: 02-08-2022

730, FRONT ELEVATION & FLOOR PLANS

Uploaded on: 02-08-2022

730, REAR ELEVATION & SECTION

Uploaded on: 02-08-2022

730, SITE PLAN & FLOOR PLANS

Uploaded on: 02-08-2022

731, FRONT ELEVATION & FLOOR PLANS

Uploaded on: 02-08-2022

731, REAR ELEVATION & SECTION

Uploaded on: 02-08-2022

731, SITE PLAN & FLOOR PLANS

Uploaded on: 02-08-2022

732, FRONT ELEVATION & FLOOR PLANS

Uploaded on: 02-08-2022

732, SITE PLAN & FLOOR PLANS

Uploaded on: 02-08-2022

733, FRONT ELEVATION & FLOOR PLANS

Uploaded on: 02-08-2022

733, REAR ELEVATION & SECTION

Uploaded on: 02-08-2022

733, SITE PLAN & FLOOR PLANS

Uploaded on: 02-08-2022

734, FRONT ELEVATION & FLOOR PLANS

Uploaded on: 02-08-2022

734, REAR ELEVATION & SECTION

Uploaded on: 02-08-2022

734, SITE PLAN & FLOOR PLANS

Uploaded on: 02-08-2022

735, FRONT ELEVATION & 4TH FLOOR, BASEMENT, TERRACE PLANS

Uploaded on: 02-08-2022

739, REAR ELEVATION & SECTION

Uploaded on: 02-08-2022

740, SITE PLAN & FLOOR PLANS

Uploaded on: 02-08-2022

744, FRONT ELEVATION & FLOOR PLANS

Uploaded on: 02-08-2022

735, REAR ELEVATION & SECTIONS

Uploaded on: 02-08-2022

735, SITE PLAN & STILT TO 3RD FLOOR PLANS

Uploaded on: 02-08-2022

739, FRONT ELEVATION & FLOOR PLANS

Uploaded on: 02-08-2022

739, SITE PLAN & FLOOR PLANS

Uploaded on: 02-08-2022

740, FRONT ELEVATION & FLOOR PLANS

Uploaded on: 02-08-2022

740, REAR ELEVATION & SECTION

Uploaded on: 02-08-2022

741, FRONT ELEVATION & FLOOR PLANS

Uploaded on: 02-08-2022

737_SITE PLAN, STILT, TYPICAL

Uploaded on: 02-08-2022

741, REAR ELEVATION & SECTION

Uploaded on: 02-08-2022

741, SITE PLAN & FLOOR PLANS

Uploaded on: 02-08-2022

742, FRONT ELEVATION & FLOOR PLANS

Uploaded on: 02-08-2022

742, REAR ELEVATION & SECTION

Uploaded on: 02-08-2022

745, FRONT ELEVATION & FLOOR PLANS

Uploaded on: 02-08-2022

736, FOURTH, TERRACE, BASEMENT, FRONT ELEVATION

Uploaded on: 02-08-2022

742, SITE PLAN & FLOOR PLANS

Uploaded on: 02-08-2022

743, FRONT ELEVATION & FLOOR PLANS

Uploaded on: 02-08-2022

743, REAR ELEVATION & SECTION

Uploaded on: 02-08-2022

743, SITE PLAN & FLOOR PLANS

Uploaded on: 02-08-2022

744, REAR ELEVATION & SECTION

Uploaded on: 02-08-2022

744, SITE PLAN & FLOOR PLANS

Uploaded on: 02-08-2022

745, REAR ELEVATION & SECTION

Uploaded on: 02-08-2022

745, SITE PLAN & FLOOR PLANS

Uploaded on: 02-08-2022

736, SECTONS, REAR ELEVATION

Uploaded on: 02-08-2022

736_SITE PLAN, STILT, TYPICAL

Uploaded on: 02-08-2022

737, FOURTH, TERRACE, BASEMENT, FRONT ELEVATION

Uploaded on: 02-08-2022

737, SECTONS, REAR ELEVATION

Uploaded on: 02-08-2022

738, FOURTH, TERRACE, BASEMENT, FRONT ELEVATION

Uploaded on: 02-08-2022

738, SECTONS, REAR ELEVATION

Uploaded on: 02-08-2022

738_SITE PLAN, STILT, TYPICAL

Uploaded on: 02-08-2022

Statutory Approvals

BUILDING PLAN M-727Date: 22-02-2022Status: ALREADY BEEN OBTAINED
BUILDING PLAN M-728Date: 22-02-2022Status: ALREADY BEEN OBTAINED
BUILDING PLAN M-729Date: 22-02-2022Status: ALREADY BEEN OBTAINED
BUILDING PLAN M-730Date: 22-02-2022Status: ALREADY BEEN OBTAINED
BUILDING PLAN M-731Date: 22-02-2022Status: ALREADY BEEN OBTAINED
BUILDING PLAN M-732Date: 22-02-2022Status: ALREADY BEEN OBTAINED
BUILDING PLAN M-733Date: 22-02-2022Status: ALREADY BEEN OBTAINED
BUILDING PLAN M-734Date: 22-02-2022Status: ALREADY BEEN OBTAINED
BUILDING PLAN M-735Date: 27-10-2021Status: ALREADY BEEN OBTAINED
BUILDING PLAN M-736Date: 06-12-2021Status: ALREADY BEEN OBTAINED
BUILDING PLAN M-737Date: 03-12-2021Status: ALREADY BEEN OBTAINED
BUILDING PLAN M-738Date: 03-12-2021Status: ALREADY BEEN OBTAINED
BUILDING PLAN M-739Date: 17-01-2022Status: ALREADY BEEN OBTAINED
BUILDING PLAN M-740Date: 22-02-2022Status: ALREADY BEEN OBTAINED
BUILDING PLAN M-741Date: 22-02-2022Status: ALREADY BEEN OBTAINED
BUILDING PLAN M-742Date: 23-02-2022Status: ALREADY BEEN OBTAINED
BUILDING PLAN M-743Date: 14-03-2022Status: ALREADY BEEN OBTAINED
BUILDING PLAN M-744Date: 23-02-2022Status: ALREADY BEEN OBTAINED
BUILDING PLAN M-745Date: 23-02-2022Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: No
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT

NOC

ROADSProvider: ALREADY LAID AND EXISTINGApproval Status: Approved
WATER SUPPLYProvider: ALREADY LAID AND EXISTINGApproval Status: Approved
ELECTRICITYProvider: ALREADY LAID AND EXISTINGApproval Status: Approved
SEWAGE DISPOSALProvider: ALREADY LAID AND EXISTINGApproval Status: Approved
STORM WATER DRAINAGEProvider: ALREADY LAID AND EXISTINGApproval Status: Approved

Project Team

Authorized Representative

ANIL BEHL
Name
ANIL BEHL
PAN
XXXX738L
Email
a.behl@oidpl.com
Mobile
9810413778
Landline
01244590000
Address
H.No 340 Sector 16A Kheri Kalan Faridabad Haryana

Managing Director/CEO

DHRUV GUPTA
Name
DHRUV GUPTA
PAN
XXXX571N
Email
legal@oidpl.com
Mobile
9310006848
Landline
01244590000
Address
4-A Prithviraj Road New Delhi - 110001

Directors

AJAY GOEL
Name
AJAY GOEL
PAN
XXXX716M
Email
a.goel@oidpl.com
Mobile
9312261819
Landline
01244590000
Address
H.No. D-146 Sector-27 Block-D Noida Uttar Pradesh

Contact Details

Project ContactEmail: a.kumar@oidpl.comMobile: 9310088104Landline: 01244590000
Project Contact PersonName: ARBIND KUMAREmail: a.kumar@oidpl.comMobile: 9310088104Landline: 01244590000

Land Details

Land Area4152.75 (Sqr/mtrs)
Proposed FAR264
Permissible FAR10963.26
Total Licensed Land331.846 (Sqr/mtrs)

Land Usage

Land Cost1376.52 Lakhs
Other Cost694.74 Lakhs
Estimated Project Cost5982.54 Lakhs
Estimated Infrastructure Cost149.5 Lakhs
Estimated Apartment Construction Cost3761.78 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2022 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0050
Other0000
Parks and Playgrounds0000
Roads & Pavements0000
Sewerage treatment & garbage disposal0005
Shopping area0000
Storm Water Drainage0020
Underground Tank-0--
Water Supply System0000

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEMARBLE/ VITRIFIED TILES/MATT FINISH TILES/ ANTI SKID CERAMIC TILES
WALL FINISHING DETAILSPOP PUNNING FINISHED WITH PLASTIC/ACRYLIC EMULSION PAINT /OBD
KITCHEN DETAILSMODULAR KITCHEN WITH SS SINK AND C.P FITTINGS , CERAMIC TILES IN DDO 2 FT. ABOVE GRANITE COUNTER
BATHROOM FITTINGSSUPERIOR CHINAWARE AND C.P FITTINGS
WOOD WORK ETCSEASONED WOOD DOOR FRAMES
DOORS AND WINDOS FRAMESWINDOWS FRAMES IN POWDER COATED ALUMINIUM OR EQUIVALENT / UPVC AND DOOR FRAMES IN MARANDI / HARDWOOD
GLASS WORK4-6 MM THICK GLASS WORK IN WINDOWS FLAZING
ELECTRIC FITTINGSSUPERIOR ISI APPROVED / EQUIVALENT FITTINGS
CONDUCTING AND WIRING DETAILSPVC CONDUIT AND COPPER WIRING
CUPBOARD DETAILSN/A
WATER STORAGEAS PER DESIGN
LIFT DETAILSPASSENGER ELEVATOR- 08 PERSONS
EXTERNAL GLAZINGSPOWDER COATED AL/UPVC WITH 4-6 MM THICK GLASS
WINDOWS/GLAZINGS4-6 MM THICK GLASS
DOORSFLUSH DOOR SHUTTERS
MAIN DOORSMODULAR FLUSH DOOR/ PANELED OOR
INTERNAL DOORSFLUSH DOORS/ LAMINATED FLUSH DOORS
AIR CONDITIONINGSPLIT INVERTER ACS
ELECTRICAL FITTINGSN/A
CNG PIPE LINEPROVISION TO BE LEFT
PROVISION OF WIFI AND BROADBAND FACILITYTO BE PROVIDED
EXTERNAL FINISHING/COLOUR SCHEMEWPC/TEXTURED PAINT
INTERNAL FINISHINGACRYLIC/PLASTIC EMULSION PAINT/ OBD

Unit-wise Specifications

TOILET
FLOORMATT FINISH TILES 2 FT. X 2 FT.
WALLSCERAMIC/ PORCELAIN TILES 2 FT. X 1 FT. UPTO 7 FT. HIGH
CEILINGM R PAINTED FALSE CEILING WITH SERVICE TRAP DOOR
COUNTERSGRANITE/EQUIVALENT STONE
SANITARY WARE/CP FITTINGSREPUTED BRAND
FIXTURESREPUTED BRAND
KITCHEN
FLOORVITRIFIED TILES FLOORING SAME TILE SKIRTING 3 FT. HIGH
WALLSPORCELAIN/CERAMIC TILES 2 FT. ABOVE COUNTER TOP, REST IN POP PUNNING WITH EMULSION PAINT
CEILINGPOP PUNNING WITH OBD PAINT
COUNTERSGRANITE COUNTER WITH SS DOUBLE BOWL SINK WITH FIXTURE AND FITTED WITH MODULAR KITCHEN
FIXTURESREPUTED BRAND
KITCHEN APPLIANCESHOB AND CHIMNEY
SIT-OUTS
FLOORANTI SKID CERAMIC TILES WITH 4 FT. HIGH SKIRTING
WALLS & CEILINGEXTERNAL TEXTURE PAINT POP PUNNING WITH OBD
RAILINGSM.S METAL / GLASS
FIXTURESREPUTED BRAND
BED ROOMS
FLOORVITRIFIED TILS 2 FT. X 2 FT. WITH 3 FT. HIGH SKIRTING
WALLSPOP PUNNING WITH PLASTIC/ACRYLIC EMULSION PAINT
CEILINGPOP PUNNING WITH OBD PAINT
WARDROBESN/A
MASTER TOILET
FLOORMATT FINISH TILES 2 FT. X 2 FT.
WALLSCERAMIC/PORCELAIN TILES 2 FT. X 1 FT. UPTO 7 FT. HIGH
CEILINGM R PAINTED FALSE CEILING WITH TRAP DOOR FOR SERVICING
COUNTERSGRANITE / EQUIVALENT STONE
SANITARY WARE/CP FITTINGSBRANDED SANITART WARE AND C.P FITTINGS
FITTING/FIXTURESREPUTED BRANDS
MASTER BEDROOM/DRESSROOM
FLOOR18 MM IMPORTED MARBLE/EQUIVALENT MARBLE
WALLSPOP PUNNING WITH PLASTIC/ACRYLIC EMULSION PAINT
CEILINGPOP PUNNING WITH OBD
MODULAR WARDROBESN/A
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOOR18 MM IMPORTED MARBLE/ EQUIVALENT MARBLE
WALLSPOP PUNNING WITH PLASTIC / ACRYLIC EMULSION PAINT
CEILINGPOP PUNNING WITH OBD
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORANTI SKID CERAMIC TILE WITH 4 FT. HIGH SKIRTING
WALLS & CEILINGPOP WITH OBD PAINT
TOILETPLAIN CERAMIC TILE UPTO 4 FT. HIGH AND REST IN POP PUNNING WITH OBD PAINT
BALCONYANTI SKID CERAMIC TILES WITH M.S / TOUGHENED GLASS METAL RAILING

Fee Details

Payment 1
amount:400000
cheque no:19449
draft date:28-02-2022
payable to:HRERA Gurugram