NEWActive

M3M MANSION

GURUGRAM, GURGAON
image
image
image
image
image
image
image
image
image
21-02-2024
Launch Date
NEW
Type
2030-03-31
Completion Date

Overview

Launch Date

21-02-2024

Completion Date

2030-03-31

Configurations

3 BHK, 4 BHK, 5 BHK

Sizes

2077 - 6769 sq.ft.

Project Size

8 Buildings - 968 units

Total Floors

32

Launch Price

18500 /sq.ft

Current Price

20000 /sq.ft

RERA ID

RERA-GRG-1547-2024

Basic Details

Project NameM3M MANSION
Project IDRERA-GRG-1547-2024
Project TypeNEW
Applicant TypeCompany
Submission Date21-02-2024 02:01:24 PM
Builder NameUNION BUILDMART PRIVATE LIMITED
CINU70100HR2012PTC089615
PANXXXX843M
EmailUnionbuildmart0207@gmail.com
Websitehttp://unionbuildmart.in/
Phone (Mobile)9711348349
Phone (Landline)0124473200
Registered Address41ST FLOOR, TOWER-1, M3M INTERNATIONAL FINANCIAL CENTER, SECTOR-66, BADSHAHPUR, GURGAON, HARYANA
Project AddressVILLAGE CHAUMA,SECTOR 113,GURUGRAM
DistrictGURUGRAM
TehsilGURGAON

Location

M3M Mansion Sector 113 Location
M3M Mansion Sector 113 Location

Layout

Loading
M3M Mansion Sector 113 Layout
M3M Mansion Sector 113 Layout

Floor Plan

Loading
Configuration
Super Area
Unit Details
Carpet Area
N/A
Built Up Area
N/A
Carpet Efficiency
N/A
Built Up Efficiency
N/A
Parkings
N/A

Brochures

Loading

Walkthrough

Loading

Bank Details

Bank NameICICI BANK LIMITED, BRANCH M3M TEE POINT, SECTOR 65, GURUGRAM, HARYANA
Account Number777705004843
IFSC CodeICIC0007242
MICR Code110229338
Branch Code007242

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)1) Mr. Vyom Shakti Nigam-D3/103 Paras city E3 Arera Colony Bhopal M.P. 462016 2) Ms. Amarjot Kaur Sahni-3/66 Subhash Nagar West Delhi 110027 3) Ms. Shubhra Bakshi- House No 10/6, DLF Phase-1, Sikanderpur Ghosi, Gurgaon, Haryana- 122002 4) Ms. Surbhi- Flat No-3-905, 9th floor, Sector-103, grandiva, Daultabad, Gurgaon, Haryana-122006 5) Mr. Vidya Sagar-3G-208, Faridabad, NIT Faridabad, Haryana- 121001 6) Mr. Pratap Singh-10A Pocket 2 Mayur Vihar East Delhi 110096 7) Mr. Pradeep Kumar Katiyar- 357, Bakhothi Purwa, Thana Bilaur, Kanpur- 209202, Uttar Pradesh
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Upload

Development Details

Land Area8.710 (Acre)
Proposed FAR3.935
Permissible FAR3.989
Total Licensed Land10.225 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1.90
CONSTRUCTION OF ROADS5.11
PAVEMENTS0
PARKS AND PLAYGROUNDS1.53
GREEN BELTS0
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
COMMERCIAL AREA0.17
Total8.71

Cost Details

Land Cost79438.90 Lakhs
Other Cost54842.97 Lakhs
Estimated Project Cost233297.90 Lakhs
Estimated Infrastructure Cost9837.01 Lakhs
Estimated Apartment Construction Cost89179.02 Lakhs

Documents

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 21-02-2024

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 21-02-2024

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 21-02-2024

DEMARCATION PLAN

Uploaded on: 21-02-2024

APPROVED SITE PLAN

Uploaded on: 21-02-2024

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 21-02-2024

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 21-02-2024

APPROVED DEMARCATION PLAN

Uploaded on: 21-02-2024

APPROVED ZONING PLAN

Uploaded on: 21-02-2024

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 21-02-2024

ZONING PLAN

Uploaded on: 21-02-2024

T-H TYPICAL FLOOR LEVEL LAYOUT AND AREA DETAILS

Uploaded on: 29-03-2024

T-F- ELEVATION-1

Uploaded on: 29-03-2024

T-F- SECTION-X

Uploaded on: 29-03-2024

T-K SECOND FLOOR LVL LAYOUT

Uploaded on: 29-03-2024

T-E SECTION-XX AND YY

Uploaded on: 29-03-2024

T-E TYPICL FLOOR PLAN(4TH-18TH,20TH-28TH AND 30-31ST)

Uploaded on: 29-03-2024

ELECTRICITY PLAN

Uploaded on: 29-03-2024

T-J TYPICAL FLOOR LVL LAYOUT

Uploaded on: 29-03-2024

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 29-03-2024

T-C- SECTION-X

Uploaded on: 29-03-2024

T-E TYPICAL FLOOR PLAN AND AREA DIAGRAM(REFUGE)

Uploaded on: 29-03-2024

T-G 1ST LEVEL LAYOUT

Uploaded on: 29-03-2024

T-H SECTION-XX

Uploaded on: 29-03-2024

STORM WATER LAYOUT PLAN

Uploaded on: 29-03-2024

T-C&F- TYPICAL LEVEL LAYOUT

Uploaded on: 29-03-2024

T-D 1ST 2ND LEVEL LAYOUT

Uploaded on: 29-03-2024

T-K TYPICAL FLOOR LVL LAYOUT

Uploaded on: 29-03-2024

T-H ELEVATION-1

Uploaded on: 29-03-2024

T-J FIRST FLOOR LVL LAYOUT

Uploaded on: 29-03-2024

DOMESTIC WATER SUPPLY LAYOUT PLAN

Uploaded on: 29-03-2024

STREET LIGHT PLAN

Uploaded on: 29-03-2024

T-J 19TH AND 28TH REFUGE FLOOR LVL LAYOUT

Uploaded on: 29-03-2024

T-J SECOND FLOOR LVL LAYOUT

Uploaded on: 29-03-2024

LANDSCAPE PLAN

Uploaded on: 29-03-2024

PARKING PLAN

Uploaded on: 29-03-2024

PARKING

Uploaded on: 29-03-2024

ROAD LAYOUT PLAN

Uploaded on: 29-03-2024

T-G ELEVATION-1

Uploaded on: 29-03-2024

SEWARGE LAYOUT PLAN

Uploaded on: 29-03-2024

SUPERIMPOSED DEMARCATION PLAN ON APPROVED LAYOUT PLAN

Uploaded on: 29-03-2024

T-C- ELEVATION-1

Uploaded on: 29-03-2024

T-C&F- 19TH & 28TH LEVEL LAYOUT

Uploaded on: 29-03-2024

T-D ELEVATION-2

Uploaded on: 29-03-2024

T-D SECTION-X

Uploaded on: 29-03-2024

T-D TYPICL LEVEL LAYOUT AND AREA DETAILS

Uploaded on: 29-03-2024

T-E ELEVATION-1 AND 2

Uploaded on: 29-03-2024

T-E UNIT PLAN AND AREA DIAGRAM

Uploaded on: 29-03-2024

T-G 2ND LEVEL LAYOUT AND AREA CALCULATION

Uploaded on: 29-03-2024

T-G SECTION-X

Uploaded on: 29-03-2024

T-G TYPICL LEVEL LAYOUT AND AREA DETAILS

Uploaded on: 29-03-2024

T-E TYPICAL FLOOR PLAN(31ST FLOOR PLAN)

Uploaded on: 23-05-2024

T-C&F- FIRST LEVEL LAYOUT

Uploaded on: 23-05-2024

T-K SECTION-YY

Uploaded on: 23-05-2024

T-C- 31ST FLOOR PLAN

Uploaded on: 23-05-2024

T-J ELEVATION

Uploaded on: 23-05-2024

T-K 3RD TO 18TH, 20TH TO 28TH & 30TH & 32ND

Uploaded on: 23-05-2024

T-G 3RD TO 18TH, 20TH TO 28TH & 30TH

Uploaded on: 23-05-2024

T-J SECTION-XX

Uploaded on: 23-05-2024

T-K TERRACE LVL LAYOUT

Uploaded on: 23-05-2024

T-C&F- STILT LEVEL LAYOUT

Uploaded on: 23-05-2024

T-G TERRACE FLOOR PLAN

Uploaded on: 23-05-2024

T-H; 1ST TO 18TH, 20TH TO 28TH,30TH TO 32ND

Uploaded on: 23-05-2024

T-C&F- SECOND LEVEL LAYOUT

Uploaded on: 23-05-2024

T-E TERRACE FLOOR PLAN

Uploaded on: 23-05-2024

T-F- 31 ST LEVEL LAYOUT

Uploaded on: 23-05-2024

T-G STILT LEVEL LAYOUT

Uploaded on: 23-05-2024

T-H 33RD LEVEL LAYOUT

Uploaded on: 23-05-2024

T-C&F- TYPICAL LEVEL LAYOUT- 3RD TO 18TH, 20TH TO 27TH,29TH-30TH FLOOR PLAN

Uploaded on: 23-05-2024

T-E STILT FLOOR PLAN AND AREA DIAGRAM

Uploaded on: 23-05-2024

T-J TERRACE LAYOUT

Uploaded on: 23-05-2024

T-J; 3RD TO 18TH, 20TH TO 28TH,30TH TO 32ND

Uploaded on: 23-05-2024

T-H TYPICAL AND REFUGE LVL-19TH & 29TH FLOOR

Uploaded on: 23-05-2024

T-G 31ST LVL LAYOUT

Uploaded on: 23-05-2024

T-J 33RD LVL LAYOUT

Uploaded on: 23-05-2024

T-F- 31ST LEVEL LAYOUT

Uploaded on: 23-05-2024

T-C- 31ST FLOORPLAN

Uploaded on: 23-05-2024

T-D; 1ST 2ND 3RD LEVEL LAYOUT

Uploaded on: 23-05-2024

T-J SECTION-YY

Uploaded on: 23-05-2024

T-H TERRACE LEVEL LAYOUT

Uploaded on: 23-05-2024

T-E REFUGE 19TH & 29TH FLOOR PLAN)

Uploaded on: 23-05-2024

T-K 19TH AND 28TH FLOOR LVL LAYOUT

Uploaded on: 23-05-2024

T-D; 19TH & 29TH REFUGE FLOOR PLAN

Uploaded on: 23-05-2024

T-H STILT LEVEL LAYOUT

Uploaded on: 23-05-2024

T-K ELEVATION

Uploaded on: 23-05-2024

T-K SECTION-XX

Uploaded on: 23-05-2024

T-D; 4TH TO 18TH, 20TH TO 28TH & 30TH FLOOR PLAN

Uploaded on: 23-05-2024

T-K FIRST FLOOR LVL LAYOUT

Uploaded on: 23-05-2024

T-J STILT LVL LAYOUT

Uploaded on: 23-05-2024

T-K 33RD LVL AND AREA LVL LAYOUT

Uploaded on: 23-05-2024

T-K STILT LVL LAYOUT

Uploaded on: 23-05-2024

FOREST NOC

Uploaded on: 30-05-2024

AAI NOC

Uploaded on: 30-05-2024

LC-IVA

Uploaded on: 30-05-2024

FIRE SCHEME APPLICATION

Uploaded on: 30-05-2024

CA CERTIFICATE- NET WORTH

Uploaded on: 30-05-2024

BR-III

Uploaded on: 30-05-2024

APPLICATION OF ENVIRONMENT CLEARANCE

Uploaded on: 30-05-2024

LOI

Uploaded on: 30-05-2024

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 30-05-2024

ASSURANCE- WATER SUPPLY

Uploaded on: 30-05-2024

AFFIDAVIT 4 2 (L)(D)

Uploaded on: 30-05-2024

ASSURANCE- SEWERAGE

Uploaded on: 30-05-2024

ASSURANCE- STORM WATER

Uploaded on: 30-05-2024

BANK UNDERTAKING

Uploaded on: 30-05-2024

CA CERTIFICATE- INCURRED

Uploaded on: 30-05-2024

LC-IV

Uploaded on: 30-05-2024

Statutory Approvals

LICENSE APPROVALDate: 02-11-2023Status: ALREADY BEEN OBTAINED
LOI APPROVALDate: 18-04-2023Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT
HARDSCAPE AND SOFTSCAPEAS PER PROJECT REPORT
BOUNDARY WALLAS PER PROJECT REPORT
GUARD HOUSEAS PER PROJECT REPORT
PARKINGAS PER PROJECT REPORT
STPAS PER PROJECT REPORT
UNDERGROUND WATER TANKAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
ELECTRICAL SUB STATIONAS PER PROJECT REPORT
ELECTRIFICATION TILL SITEAS PER PROJECT REPORT
CONSULTANCYAS PER PROJECT REPORT
INFRA ESTABLISHMENTAS PER PROJECT REPORT

NOC

ROADSProvider: GMDAApproval Status: Pending
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

BHARAT VIGMAL
Name
BHARAT VIGMAL
PAN
XXXX099K
Email
Unionbuildmart0207@gmail.com
Mobile
8929012754
Landline
0124473200
Address
41st Floor Tower-1 M3MInternational Financial Center Sector-66 Badshahpur GurugramHaryana

Managing Director/CEO

NA
Name
NA
PAN
XXXX0000
Email
Unionbuildmart0207@gmail.com
Mobile
0000000000
Landline
0000000000
Address
NA

Directors

AMIT RAJ
Name
AMIT RAJ
PAN
XXXX258F
Email
Unionbuildmart0207@gmail.com
Mobile
7669610541
Landline
01244732000
Address
B 6504 M3M Woodshire Dharampur Road Sector 107 Daultabad 53 Gurgaon Haryana - 122006
MUKESH SHARMA
Name
MUKESH SHARMA
PAN
XXXX071K
Email
Unionbuildmart0207@gmail.com
Mobile
7669610540
Landline
01244732000
Address
House No 14601197 Near Shukla Chakki Faridabad Haryana

Contact Details

Project ContactEmail: Unionbuildmart0207@gmail.comMobile: 9711348349Landline: 01244732000
Project Contact PersonName: VIMAL SAROHAEmail: Unionbuildmart0207@gmail.comMobile: 9711348349Landline: 01244732000

Land Details

Land Area8.710 (Acre)
Proposed FAR3.935
Permissible FAR3.989
Total Licensed Land10.225 (Acre)

Land Usage

Land Cost79438.90 Lakhs
Other Cost54842.97 Lakhs
Estimated Project Cost233297.90 Lakhs
Estimated Infrastructure Cost9837.01 Lakhs
Estimated Apartment Construction Cost89179.02 Lakhs

Total Infrastructure Expenditure

Infrastructure Total Expenditure

No total expenditure data is currently available for this project.

Quarterly Infrastructure Expenditure

2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall77.1564.2945.0157.87
Clubhouse/community centres0000
Consultancy41.3341.3312441.33
Electrical sub station252.69252.69252.69252.69
Electricity Supply System70.42176.04176.04176.04
Firefighting services25.0929.5129.5114.76
Hardscape and Softscape280.14186.76186.76186.76
Infra Establishments30.6230.6291.8630.62
Main Entrance work and Guard House24.4924.4930.6230.62
Other0000
Parking Marking62.5862.5862.5862.58
Parks and Playgrounds22.9622.9618.379.18
Rain water harvesting1.531.531.531.53
Roads & Pavements91.8553.5838.270
STP13.8219.7549.3723.7
Security61.2361.2361.2361.23
Sewerage treatment & garbage disposal9.189.1812.2515.31
Shopping area0000
Storm Water Drainage5.515.517.359.18
Street Light15.3115.3115.3115.31
Switching Station350.31350.31350.31350.31
Underground tank16.4235.1858.6328.14
Water Supply System12.6912.6916.9221.16
2030 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall----
Clubhouse/community centres0000
Consultancy----
Electrical sub station----
Electricity Supply System0000
Firefighting services----
Hardscape and Softscape----
Infra Establishments----
Main Entrance work and Guard House----
Other0000
Parking Marking----
Parks and Playgrounds0000
Rain water harvesting----
Roads & Pavements0000
STP----
Security----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Light----
Switching Station----
Underground tank----
Water Supply System0000
2031 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall----
Clubhouse/community centres0---
Consultancy----
Electrical sub station----
Electricity Supply System0---
Firefighting services----
Hardscape and Softscape----
Infra Establishments----
Main Entrance work and Guard House----
Other0---
Parking Marking----
Parks and Playgrounds0---
Rain water harvesting----
Roads & Pavements0---
STP----
Security----
Sewerage treatment & garbage disposal0---
Shopping area0---
Storm Water Drainage0---
Street Light----
Switching Station----
Underground tank----
Water Supply System0---

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES/LAMINATEDWOODEN FLOOR/CERAMIC TILE
WALL FINISHING DETAILSPLASTER WITH OBD
KITCHEN DETAILSN.A.
BATHROOM FITTINGSN.A.
WOOD WORK ETCN.A.
DOORS AND WINDOS FRAMESEXTERNAL ALUMINIUM WITH GLASSINTERNAL – WOODEN
GLASS WORKONLY EXTERNAL DOOR/WINDOW
ELECTRIC FITTINGSAS PER APPROVED MAKE
CONDUCTING AND WIRING DETAILSAS PER APPROVED MAKE
CUPBOARD DETAILSN.A.
WATER STORAGEAS PER NORMS
LIFT DETAILSLIFTS AS PER BUILDING PLANS
EXTERNAL GLAZINGSGLASS WITH ALUMINIUM FRAMINGSLIDING
WINDOWS/GLAZINGSGLASS WITH ALUMINIUM FRAMINGSLIDING
DOORSNA
MAIN DOORSHARD WOOD DOOR FRAME WITHFLUSH DOOR /LAMINATE
INTERNAL DOORSHARD WOOD DOOR FRAME WITHFLUSH DOOR /LAMINATE
AIR CONDITIONINGNA
ELECTRICAL FITTINGSAS PER APPROVED MAKE
CNG PIPE LINEN.A.
PROVISION OF WIFI AND BROADBAND FACILITYN.A.
EXTERNAL FINISHING/COLOUR SCHEMEWATER PROOF PAINT
INTERNAL FINISHINGPAINT/GLASS

Unit-wise Specifications

TOILET
FLOORANTISKID CERAMIC TILES
WALLSPLASTER & DADO
CEILINGGRID FALSE CEILING/OBD
COUNTERSN.A.
SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
FIXTURESAS PER APPROVED MAKE
KITCHEN
FLOORVITRIFIED TILES
WALLSPLASTER & DADO
CEILINGOBD
COUNTERSSTONE/MARBLE
FIXTURESAS PER APPROVED MAKE
KITCHEN APPLIANCESN.A.
SIT-OUTS
FLOORN.A.
WALLS & CEILINGN.A.
RAILINGSN.A.
FIXTURESN.A.
BED ROOMS
FLOORVITRIFIED TILES/LAMINATE WOODEN FLOORING
WALLSPLASTER & OBD
CEILINGOBD
WARDROBESN.A.
MASTER TOILET
FLOORANTISKID CERAMIC TILES
WALLSPLASTER & DADO
CEILINGGRID FALSE CEILING/OBD
COUNTERSN.A.
SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
FITTING/FIXTURESAS PER APPROVED MAKE
MASTER BEDROOM/DRESSROOM
FLOORVITRIFIED TILES/LAMINATE WOODEN FLOORING
WALLSPLASTER & OBD
CEILINGOBD
MODULAR WARDROBESN.A.
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILES
WALLSPLASTER OBD
CEILINGOBD
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORANTISKID VITRIFIED TILES
WALLS & CEILINGPLASTER & PAINT
TOILETANTISKID CERAMIC TILES
BALCONYANTISKID CERAMIC TILES

Fee Details

Payment 1
amount:6387320
cheque no:506439
draft date:21-02-2024
payable to:HRERA Gurugram
payee bank:ICICI BANK
Payment 2
amount:1616170
cheque no:506441
draft date:21-02-2024
payable to:HRERA Gurugram
payee bank:ICICI BANK