Have queries on this Project?
Land Area
Project Size
Density
Unit Configurations
Size
Total Floors
RERA Received
RERA Completion
Launch Price
Current Price
RERA ID
Riviera at AIPL Lake City is a luxury residential project by AIPL (Advance India Projects Limited) in Sector 103, on the Dwarka Expressway in Gurgaon. Its defining feature is what surrounds it: the homes sit within AIPL Lake City, a large master-planned township laid out around landscaped lakes and water features, giving residents a low-density, water-facing setting that is rare on the expressway corridor. For a buyer, the draw is an apartment inside a planned lake-themed township rather than a standalone tower on a tight plot.
Registered with HARERA under RERA-GRG-2085-2025, Riviera spans 5.14 acres with 2 high-rise towers rising to 43 floors and 344 residences, at a low density of about 67 units per acre. The configurations are 2, 3 and 4 BHK homes with super areas from 2,053 sq ft to 3,211 sq ft and a carpet efficiency of around 58%, and an entry home works out to around ₹4.04 crore on base price. Pricing has moved from a launch rate of ₹17,000 per sq ft to roughly ₹17,500 per sq ft.
Why Sector 103 and the Dwarka Expressway
Sector 103 sits directly on the Dwarka Expressway (NH-248BB), the 16-lane access-controlled corridor linking Gurugram with Dwarka and the Delhi side and connecting onward to IGI Airport and NH-48. The expressway's completion has made this one of the most active residential belts in the NCR. For a buyer, the case is forward-looking: a master-planned, water-themed community on fully operational expressway infrastructure that continues to mature, with the airport, interchanges and surrounding commercial growth reinforcing long-term demand. Water, electricity, sewage and storm-water are approved, with the roads NOC from GMDA in process.
Specifications at a Glance
BSP only. GST, PLC, Parking, IFMS could be add ons.
Get Full Cost BreakupUploaded on: 08-12-2025
Uploaded on: 08-12-2025
Uploaded on: 08-12-2025
Uploaded on: 08-12-2025





Infrastructure Total Expenditure
No total expenditure data is currently available for this project.
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | - | - | - | 0 |
| Electrical sub station | - | - | - | 0 |
| Electricity Supply System | - | - | - | 0 |
| Other | - | - | - | 0 |
| Parks and Playgrounds | - | - | - | 0 |
| Rain water harvesting | - | - | - | 0 |
| Rainwater Harvesting | - | - | - | - |
| Renewable Energy System | - | - | - | - |
| Renewable energy system | - | - | - | 0 |
| Roads & Pavements | - | - | - | 0 |
| STP | - | - | - | 0 |
| Security and fire fighting | - | - | - | 0 |
| Sewerage treatment & garbage disposal | - | - | - | 0 |
| Shopping area | - | - | - | 0 |
| Storm Water Drainage | - | - | - | 0 |
| Street Lighting | - | - | - | 0 |
| Underground Water Tank | - | - | - | - |
| Underground water tank | - | - | - | 0 |
| Water Supply System | - | - | - | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Electrical sub station | - | - | - | - |
| Electricity Supply System | 0 | 0 | 0 | 0 |
| Other | 0 | 0 | 0 | 0 |
| Parks and Playgrounds | 0 | 0 | 0 | 0 |
| Rain water harvesting | - | - | - | - |
| Rainwater Harvesting | 1.5 | 1.5 | 3 | 3 |
| Renewable Energy System | - | - | - | - |
| Renewable energy system | - | - | - | - |
| Roads & Pavements | 24.69 | 26.63 | 27.2 | 29.14 |
| STP | - | - | - | - |
| Security and fire fighting | - | - | - | - |
| Sewerage treatment & garbage disposal | 3 | 3 | 3 | 3 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 3 | 3 | 3 | 3 |
| Street Lighting | - | - | - | - |
| Underground Water Tank | 3.75 | 3.75 | 7.5 | 7.5 |
| Underground water tank | - | - | - | - |
| Water Supply System | 2 | 2 | 2 | 2 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Electrical sub station | - | - | - | - |
| Electricity Supply System | 0 | 0 | 0 | 0 |
| Other | 0 | 0 | 0 | 0 |
| Parks and Playgrounds | 0 | 0 | 0 | 0 |
| Rain water harvesting | - | - | - | - |
| Rainwater Harvesting | 3 | 3 | 3 | 3 |
| Renewable Energy System | - | - | - | - |
| Renewable energy system | - | - | - | - |
| Roads & Pavements | 31.08 | 34.96 | 42.73 | 41.39 |
| STP | - | - | - | - |
| Security and fire fighting | - | - | - | - |
| Sewerage treatment & garbage disposal | 3 | 3 | 3 | 3 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 3 | 3 | 3 | 3 |
| Street Lighting | - | - | - | - |
| Underground Water Tank | 7.5 | 7.5 | 7.5 | 7.5 |
| Underground water tank | - | - | - | - |
| Water Supply System | 2 | 2 | 2 | 2.4 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Electrical sub station | 4.32 | 3.31 | 8.17 | 7.29 |
| Electricity Supply System | 0 | 0 | 0 | 0 |
| Other | 0 | 0 | 0 | 0 |
| Parks and Playgrounds | 0 | 0 | 0 | 7.1 |
| Rain water harvesting | - | - | - | - |
| Rainwater Harvesting | 2.4 | 2.1 | 1.8 | 1.5 |
| Renewable Energy System | - | - | - | - |
| Renewable energy system | - | - | - | - |
| Roads & Pavements | 41.39 | 49.67 | 57.94 | 57.94 |
| STP | - | - | - | - |
| Security and fire fighting | 0 | 0 | 1.33 | 2 |
| Sewerage treatment & garbage disposal | 3 | 3 | 0 | 0 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 3 | 3 | 0 | 0 |
| Street Lighting | - | - | - | - |
| Underground Water Tank | 6 | 5.25 | 4.5 | 3.75 |
| Underground water tank | - | - | - | - |
| Water Supply System | 2 | 1.6 | 0 | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Electrical sub station | 6.12 | 7.18 | 8.35 | 7.13 |
| Electricity Supply System | 0 | 0 | 0 | 3.34 |
| Other | 0 | 0 | 0 | 0 |
| Parks and Playgrounds | 7.1 | 17.74 | 24.83 | 26.61 |
| Rain water harvesting | - | - | - | - |
| Rainwater Harvesting | 0.9 | 0.3 | 0 | 0 |
| Renewable Energy System | - | - | - | - |
| Renewable energy system | - | - | - | - |
| Roads & Pavements | 57.94 | 49.67 | 41.39 | 41.39 |
| STP | 0 | 2 | 5 | 5 |
| Security and fire fighting | 3.33 | 3.33 | 3.33 | 3.33 |
| Sewerage treatment & garbage disposal | 0 | 0 | 0 | 0 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 0 | 0 |
| Street Lighting | 0 | 2.5 | 2.5 | 2.5 |
| Underground Water Tank | 2.25 | 0.75 | 0 | 0 |
| Underground water tank | - | - | - | - |
| Water Supply System | 0 | 0 | 0 | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Electrical sub station | 5.52 | 5.78 | 5.81 | 7.72 |
| Electricity Supply System | 3.34 | 3.34 | 3.34 | 6.68 |
| Other | 0 | 0 | 0 | 0 |
| Parks and Playgrounds | 29.83 | 24.83 | 35.48 | 39.02 |
| Rain water harvesting | - | - | - | - |
| Rainwater Harvesting | - | - | - | - |
| Renewable Energy System | 0 | 0 | 2 | 2 |
| Renewable energy system | - | - | - | - |
| Roads & Pavements | 45.53 | 41.39 | 24.83 | 8.28 |
| STP | 5 | 10 | 10 | 10 |
| Security and fire fighting | 5.32 | 5.32 | 5.32 | 5.32 |
| Sewerage treatment & garbage disposal | 0 | 0 | 0 | 0 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 0 | 0 |
| Street Lighting | 2.5 | 2.5 | 2.5 | 2.5 |
| Underground Water Tank | - | - | - | - |
| Underground water tank | - | - | - | - |
| Water Supply System | 0 | 0 | 0 | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Electrical sub station | 5.6 | 5.52 | 5.52 | 4.82 |
| Electricity Supply System | 6.68 | 6.68 | 6.68 | 6.68 |
| Other | 0 | 0 | 0 | 0 |
| Parks and Playgrounds | 37.25 | 27.69 | 15.44 | 7.1 |
| Rain water harvesting | - | - | - | - |
| Rainwater Harvesting | - | - | - | - |
| Renewable Energy System | 2 | 2 | 2 | 2 |
| Renewable energy system | - | - | - | - |
| Roads & Pavements | 8.28 | 8.28 | 8.28 | 8.28 |
| STP | 10 | 10 | 10 | 10 |
| Security and fire fighting | 5.32 | 6.65 | 5.32 | 4.66 |
| Sewerage treatment & garbage disposal | 0 | 0 | 0 | 0 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 0 | 0 |
| Street Lighting | 2.5 | 5 | 5 | 5 |
| Underground Water Tank | - | - | - | - |
| Underground water tank | - | - | - | - |
| Water Supply System | 0 | 0 | 0 | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Electrical sub station | 3.55 | 3.81 | 2.58 | 2.21 |
| Electricity Supply System | 6.68 | 6.68 | 3.34 | 3.34 |
| Other | 0 | 0 | 0 | 0 |
| Parks and Playgrounds | 8.87 | 8.87 | 19.77 | 17.24 |
| Rain water harvesting | - | - | - | - |
| Rainwater Harvesting | - | - | - | - |
| Renewable Energy System | 2 | 2 | 2 | 2 |
| Renewable energy system | - | - | - | - |
| Roads & Pavements | 8.28 | 4.14 | 4.14 | 2.93 |
| STP | 5 | 5 | 2 | 1 |
| Security and fire fighting | 3.33 | 3.33 | 0 | 0 |
| Sewerage treatment & garbage disposal | 0 | 0 | 0 | 0 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 0 | 0 |
| Street Lighting | 5 | 5 | 5 | 0 |
| Underground Water Tank | - | - | - | - |
| Underground water tank | - | - | - | - |
| Water Supply System | 0 | 0 | 0 | 0 |
Village Daultabad, Sector 103, on the Dwarka Expressway in Gurgaon, with direct corridor connectivity towards Dwarka, IGI Airport and NH-48.
Yes, under HARERA registration RERA-GRG-2085-2025, received 3 November 2025. We recommend verifying it directly on the HARERA portal.
A large master-planned township by AIPL on the Dwarka Expressway, laid out around landscaped lakes and water features on a roughly 43-acre parcel. Riviera is its residential phase.
2, 3 and 4 BHK residences, with super areas from 2,053 sq ft to 3,211 sq ft and a carpet efficiency of around 58%.
The current rate is around ₹17,500 per sq ft (up from a ₹17,000 launch), placing an entry home near ₹4.04 crore on base price. Final all-in cost depends on unit, floor and add-ons, and is shared on request.
Developed by
8 Projects
EXECUTIVE SUMMARY Advance India Projects Limited (AIPL) is a closely-held public limited company incorporated in May 1997 and headquartered at The Masterpiece, Golf Course Road, Sector 54, Gurugram, Haryana. The group tr…
Know More about AIPL