NEWActive

M3M CAPITAL PHASE -2

GURUGRAM, GURGAON
14-09-2022
Launch Date
NEW
Type
2026-12-31
Completion Date

Overview

Launch Date

14-09-2022

Completion Date

2026-12-31

Project Size

13 Buildings - 1675 units

RERA ID

RERA-GRG-1153-2022

Basic Details

Project NameM3M CAPITAL PHASE -2
Project IDRERA-GRG-1153-2022
Project TypeNEW
Applicant TypeCompany
Submission Date14-09-2022 01:24:01 PM
Builder NameUNION BUILDMART PRIVATE LIMITED
CINU70100HR2012PTC089615
PANXXXX843M
Emailunionbuildmart0207@gmail.com
Websitehttp://unionbuildmart.com
Phone (Mobile)9711348349
Phone (Landline)01244732000
Registered Address6TH FLOOR, M3M TEE POINT, NORTH BLOCK, SECTOR-65, GURUGRAM, HARYANA 122101
Project AddressSECTOR -113, GURUGRAM MANESAR URBAN COMPLEX, GURUGRAM, HARYANA.
DistrictGURUGRAM
TehsilGURGAON

Location

Bank Details

Bank NameICICI BANK LTD, SECTOR -54, SUNCITY, GURUGRAM
Account Number777705551661
IFSC CodeICIC0000399
MICR Code110229060
Branch Code000399

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)1) Mr. Vyom Shakti Nigam-D3/103 Paras city E3 Arera Colony Bhopal M.P. 462016 2) Ms. Amarjot Kaur Sahni-3/66 Subhash Nagar West Delhi 110027 3) Ms. Shubhra Bakshi- House No 10/6, DLF Phase-1, Sikanderpur Ghosi, Gurgaon, Haryana- 122002 4) Ms. Surbhi- Flat No-3-905, 9th floor, Sector-103, grandiva, Daultabad, Gurgaon, Haryana-122006 5) Mr. Vidya Sagar-3G-208, Faridabad, NIT Faridabad, Haryana- 121001 6) Mr. Pratap Singh-10A Pocket 2 Mayur Vihar East Delhi 110096 7) Mr. Pradeep Kumar Katiyar- 357, Bakhothi Purwa, Thana Bilaur, Kanpur- 209202, Uttar Pradesh
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Uploaded

Development Details

Land Area7.7139 (Acre)
Proposed FAR2.406
Permissible FAR3.812
Total Licensed Land15.03125 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.42
CONSTRUCTION OF ROADS3.44
PAVEMENTS0
PARKS AND PLAYGROUNDS0.47
GREEN BELTS0
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION0.4
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
AREAUNDERCOMMERCIALUNITS2.98
Total7.71

Cost Details

Land Cost44058.54 Lakhs
Other Cost25120.06 Lakhs
Estimated Project Cost144896.81 Lakhs
Estimated Infrastructure Cost3897.82 Lakhs
Estimated Apartment Construction Cost71820.38 Lakhs

Documents

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 07-09-2022

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 07-09-2022

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 07-09-2022

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 07-09-2022

LOI

Uploaded on: 07-09-2022

NON- ENCUMBRANCE CERTIFICATE

Uploaded on: 07-09-2022

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 13-09-2022

ZONING PLAN

Uploaded on: 13-09-2022

ENVIRONMENT CLEARANCE

Uploaded on: 14-09-2022

DEMARCATION PLAN

Uploaded on: 14-09-2022

BR-III APPROVED BUILDING PLAN

Uploaded on: 14-09-2022

ENTRY OF LICENSE IN REVENUE RECORDS

Uploaded on: 14-09-2022

DEMAND DRAFTS

Uploaded on: 14-09-2022

PROJECT REPORT

Uploaded on: 14-09-2022

ROAD PLAN

Uploaded on: 14-09-2022

SEWER PLAN

Uploaded on: 14-09-2022

DRAINGE PLAN

Uploaded on: 14-09-2022

SUPERIMPOSED DEMARCATION ON SITE PLAN

Uploaded on: 14-09-2022

FLOOR PLANS 4A-4B

Uploaded on: 14-09-2022

SECTION PLAN

Uploaded on: 14-09-2022

FLOOR PLANS 5A-5B

Uploaded on: 14-09-2022

UPPER BASEMENT PLAN FIRE LAYOUT PLAN

Uploaded on: 30-09-2022

WATER LAYOUT

Uploaded on: 28-09-2022

SITE PLAN WITH FIRE FIGHTING LAYOUT

Uploaded on: 30-09-2022

TOWER 5A (TERRACE)

Uploaded on: 30-09-2022

TOWER 5A (20TH & 30TH)

Uploaded on: 30-09-2022

TOWER 5C 2ND LEVEL

Uploaded on: 28-09-2022

TOWER 5C TERRACE MUMTY & OH TANK

Uploaded on: 28-09-2022

STRUCTURAL DRAWING-1

Uploaded on: 28-09-2022

STRUCTURAL DRAWING-2

Uploaded on: 28-09-2022

PARKING PLAN

Uploaded on: 28-09-2022

ELECTRICITY & STREET LIGHT PLAN

Uploaded on: 28-09-2022

LANDSCAPE PLAN

Uploaded on: 28-09-2022

SOLID WASTE MANAGEMENT PLAN

Uploaded on: 28-09-2022

SUPER-IMPOSED KHASRA ON LAYOUT

Uploaded on: 28-09-2022

TOWER 5C 1ST LEVEL

Uploaded on: 28-09-2022

TOWER 5C 3RD TO 5TH LEVEL

Uploaded on: 28-09-2022

TOWER 5C 20TH & 30TH REFUGE

Uploaded on: 28-09-2022

TOWER 5C STILT LEVEL

Uploaded on: 28-09-2022

TOWER 5C TYPICAL LEVEL

Uploaded on: 28-09-2022

TOWER 6A 1ST LEVEL

Uploaded on: 28-09-2022

TOWER 6A 2ND LEVEL

Uploaded on: 28-09-2022

TOWER 6A 3RD TO 5TH LEVEL

Uploaded on: 28-09-2022

TOWER 6A 20TH & 30TH REFUGE

Uploaded on: 28-09-2022

TOWER 6A TERRACE MUMTY OH TANK

Uploaded on: 28-09-2022

TOWER 6A TYPICAL LEVEL

Uploaded on: 28-09-2022

TOWER 5C (3RD TO 5TH LEVEL)

Uploaded on: 30-09-2022

TOWER 6A STILT LEVEL

Uploaded on: 28-09-2022

ELEVATION 1 T-4 A & B

Uploaded on: 28-09-2022

ELEVATION 2 T-5A

Uploaded on: 28-09-2022

ELEVATION 4 T-5C

Uploaded on: 28-09-2022

ELEVATION-1 & 3 T-6A

Uploaded on: 28-09-2022

ELEVATION-1 & 3, T-5C

Uploaded on: 28-09-2022

ELEVATION-2 & 4 T-6A

Uploaded on: 28-09-2022

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 28-09-2022

TOWER 5A (STILT LEVEL)

Uploaded on: 30-09-2022

COMMERCIAL 1ST FLOOR PLANS FIRE LAYOUT PLAN

Uploaded on: 30-09-2022

COMMERCIAL 2ND FLOOR PLANS FIRE LAYOUT PLAN

Uploaded on: 30-09-2022

COMMERCIAL GROUND FLOOR PLANS FIRE LAYOUT PLAN

Uploaded on: 30-09-2022

COMMERCIAL LOWER GROUND PLANS FIRE LAYOUT PLAN

Uploaded on: 30-09-2022

TOWER 4(A&B) 5TH LEVEL LAYOUT

Uploaded on: 30-09-2022

TOWER 4(A&B) TYPICAL LAYOUT

Uploaded on: 30-09-2022

TOWER 5A (1ST LEVEL)

Uploaded on: 30-09-2022

COMMERCIAL TERRACE PLAN FIRE LAYOUT PLAN

Uploaded on: 30-09-2022

LOWER BASEMENT PLAN WITH FIRE FIGHTING LAYOUT

Uploaded on: 30-09-2022

TOWER (4 A& B) 6TH LEVEL LAYOUT

Uploaded on: 30-09-2022

TOWER 4(A&B) 1ST LEVEL LAYOUT

Uploaded on: 30-09-2022

TOWER 4(A&B) 2-4TH LEVEL LAYOUT

Uploaded on: 30-09-2022

TOWER 4(A&B) REFUGE LEVEL

Uploaded on: 30-09-2022

TOWER 4(A&B) STILT LEVEL

Uploaded on: 30-09-2022

TOWER 4(A&B) TERRACE

Uploaded on: 30-09-2022

TOWER 5A (2ND TO 5TH)

Uploaded on: 30-09-2022

TOWER 5A (TYPICAL)

Uploaded on: 30-09-2022

TOWER 5B (1ST LEVEL)

Uploaded on: 30-09-2022

TOWER 5B (2ND TO 5TH)

Uploaded on: 30-09-2022

TOWER 5B (STILT LEVEL)

Uploaded on: 30-09-2022

TOWER 5B (TERRACE LEVEL)

Uploaded on: 30-09-2022

TOWER 5B (TERRACE)

Uploaded on: 30-09-2022

TOWER 5B (TYPICAL LEVEL)

Uploaded on: 30-09-2022

TOWER 5C (1ST LEVEL)

Uploaded on: 30-09-2022

TOWER 5C (2ND LEVEL)

Uploaded on: 30-09-2022

TOWER 5C (20TH & 30TH LEVEL)

Uploaded on: 30-09-2022

TOWER 5C (STILT LEVEL)

Uploaded on: 30-09-2022

TOWER 5C (TERRACE)

Uploaded on: 30-09-2022

TOWER 5C (TYPICAL)

Uploaded on: 30-09-2022

TOWER 6A

Uploaded on: 30-09-2022

UPPER BASEMENT

Uploaded on: 30-09-2022

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 01-10-2022

Statutory Approvals

ZONINGDate: 15-04-2022Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 07-08-2018Status: ALREADY BEEN OBTAINED
ARAVALI NOCDate: 04-01-2017Status: ALREADY BEEN OBTAINED
HEIGHT NOCDate: 24-01-2022Status: ALREADY BEEN OBTAINED
BUILDING PLANDate: 12-09-2022Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCEDate: 16-07-2021Status: ALREADY BEEN OBTAINED
LICENCEDate: 16-12-2021Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCE - EXPANSION APPLICATIONDate: 04-04-2022Status: APPLIED FOR BUT YET TO RECEIVE
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT
STP OTHER THAN STRUCTURAL WORKSAS PER PROJECT REPORT
UNDERGROUND TANK OTHER THAN STRUCTURAL WORKSAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
ELECTRICAL SUB STATION OTHER THAN STRUCTURAL WORKSAS PER PROJECT REPORT

NOC

ROADSProvider: GMDAApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

MANIK SHARMA
Name
MANIK SHARMA
PAN
XXXX240L
Email
unionbuildmart0207@gmail.com
Mobile
8929034470
Landline
01244732000
Address
House No. 544 Top Floor Sector-46 Urban Estate Amarnagar Faridabad 121003 Haryana

Managing Director/CEO

N A
Name
N A
PAN
XXXX000X
Email
unionbuildmart0207@gmail.com
Mobile
0000000000
Landline
00000000000
Address
Gurugram

Directors

AMIT RAJ
Name
AMIT RAJ
PAN
XXXX258F
Email
Unionbuildmart0207@gmail.com
Mobile
9811486979
Landline
01244732000
Address
B 6504 M3M Woodshire Dharampur Road Sector 107 Daultabad 53 Gurugram Haryana
SANDEEP KUMAR SINGH
Name
SANDEEP KUMAR SINGH
PAN
XXXX877Q
Email
Unionbuildmart0207@gmail.com
Mobile
7669610540
Landline
01244732000
Address
Plot No 51-B KH No 617 Sainik Enclave Near Shyam Mandir Jharoda Kalan South Delhi 110072

Contact Details

Project ContactEmail: unionbuildmart0207@gmail.comMobile: 9711348349Landline: 01244732000
Project Contact PersonName: LALIT TYAGIEmail: unionbuildmart0207@gmail.comMobile: 9711348349Landline: 01244732000

Land Details

Land Area7.7139 (Acre)
Proposed FAR2.406
Permissible FAR3.812
Total Licensed Land15.03125 (Acre)

Land Usage

Land Cost44058.54 Lakhs
Other Cost25120.06 Lakhs
Estimated Project Cost144896.81 Lakhs
Estimated Infrastructure Cost3897.82 Lakhs
Estimated Apartment Construction Cost71820.38 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2022 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0---
Electricity Supply System0---
Other0---
Parks and Playgrounds0---
Roads & Pavements0---
Sewerage treatment & garbage disposal0---
Shopping area0---
Storm Water Drainage0---
Water Supply System0---

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSERETAIL (TYPICAL FLOOR)- RCC BASE SLAB OFFICE (LOBBY)FINISHED GRND FLOOR LOBBY & RCC BASE SLAB FOR TYPICLFLOOR LOBBIES. OFFICE (UNIT FLOOR FINISH) RCC BASE SLAB
WALL FINISHING DETAILSRAW WALL/ PARTITIONS
KITCHEN DETAILSN.A.
BATHROOM FITTINGSRETAIL- FINISHED COMMON TOILETS WITH MODERN FITTING &FIXTURES OFFICE : PROVISION OF SERVICES WILL BEPROVIDED AND TO BE FINISHED BY ALLOTTEE(S).
WOOD WORK ETCN.A.
DOORS AND WINDOS FRAMESALUMINIUM FRAME
GLASS WORKGLASS THICKNESS VARIES FROM 6 TO 10 MM
ELECTRIC FITTINGSCOMMON AREAS & TOILETS TO BE PROVIDED WITH LED LIGHTFIXTURES.
CONDUCTING AND WIRING DETAILSISI APPROVED CONDUITS & WIRES
CUPBOARD DETAILSN.A.
WATER STORAGERCC TANK
LIFT DETAILSSTANDARD MAKE ELEVATORS
EXTERNAL GLAZINGSALUMINIUM GLAZING WITH GLASS OF 5-12 MM THICK GLASS
WINDOWS/GLAZINGSALUMINIUM GLAZING WITH GLASS OF 5-12 MM THICK GLASS
DOORSALUMINIUM / GLASS DOORS
MAIN DOORSALUMINIUM / GLASS DOORS
INTERNAL DOORSMS/ALUMINIUM/WOODEN DOORS
AIR CONDITIONINGCHILLED WATER AC SYSTEM FOR OFFICE & PROVISION FORWATER COOLED DX SYSTEM UPTO TAP OFF INSIDE SHOP
ELECTRICAL FITTINGSPROVISION OF CABLE UP TO DISTRIBUTION BOARD ISI /BISAPPROVED
CNG PIPE LINEN.A.
PROVISION OF WIFI AND BROADBAND FACILITYN.A.
EXTERNAL FINISHING/COLOUR SCHEMEN.A.
INTERNAL FINISHINGPAINT/GLASS

Unit-wise Specifications

TOILET
FLOORANTISKID CERAMIC TILES
WALLSPLASTER & DADO
CEILINGGRID FALSE CEILING/OBD
COUNTERSN.A.
SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
FIXTURESAS PER APPROVED MAKE
KITCHEN
FLOORVITRIFIED TILES
WALLSPLASTER & DADO
CEILINGOBD
COUNTERSSTONE/MARBLE
FIXTURESAS PER APPROVED MAKE
KITCHEN APPLIANCESN.A.
SIT-OUTS
FLOORN.A.
WALLS & CEILINGN.A.
RAILINGSN.A.
FIXTURESN.A.
BED ROOMS
FLOORVITRIFIED TILES/LAMINATE WOODEN FLOORING
WALLSPLASTER & OBD
CEILINGOBD
WARDROBESN.A.
MASTER TOILET
FLOORANTISKID CERAMIC TILES
WALLSPLASTER & DADO
CEILINGGRID FALSE CEILING/OBD
COUNTERSN.A.
SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
FITTING/FIXTURESAS PER APPROVED MAKE
MASTER BEDROOM/DRESSROOM
FLOORVITRIFIED TILES/LAMINATE WOODEN FLOORING
WALLSPLASTER & OBD
CEILINGOBD
MODULAR WARDROBESN.A.
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILES
WALLSPLASTER OBD
CEILINGOBD
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORANTISKID VITRIFIED TILES
WALLS & CEILINGPLASTER & PAINT
TOILETANTISKID CERAMIC TILES
BALCONYANTISKID CERAMIC TILES

Fee Details

Payment 1
amount:2464150
cheque no:501000
draft date:14-09-2022
payable to:HRERA Gurugram
payee bank:ICICI BANK
Payment 2
amount:1485100
cheque no:500998
draft date:14-09-2022
payable to:HRERA Gurugram
payee bank:ICICI BANK
Payment 3
amount:67650
cheque no:50100
draft date:14-09-2022
payable to:HRERA Gurugram
payee bank:FEE ADJUSTED TO PROJECT TEMP ID. 1157-2022
Payment 4
amount:26100
cheque no:500998
draft date:14-09-2022
payable to:HRERA Gurugram
payee bank:FEE ADJUSTED TO PROJECT TEMP ID. 1157-2022