ONGOINGActive

HERITAGE MAX - TOWER F

GURUGRAM, GURGAON
16-12-2019
Launch Date
ONGOING
Type
2020-12-31
Completion Date

Overview

Launch Date

16-12-2019

Completion Date

2020-12-31

RERA ID

RERA-GRG-458-2019

Basic Details

Project NameHERITAGE MAX - TOWER F
Project IDRERA-GRG-458-2019
Project TypeONGOING
Applicant TypeCompany
Submission Date16-12-2019 05:34:24 AM
Builder NameDREAMHOME INFRASTRUCTURE PVT LTD
CINU70100DL2011PTC215170
PANXXXX564Q
Emailsanjay.rastogi@conscient.in
Websitehttp://www.conscient.in/heritagemax/index.html
Phone (Mobile)9810030178
Phone (Landline)01242803000
Registered Address10TH FLOOR, TOWER D, GLOBAL BUSINESS PARK, MG ROAD, GURUGRAM - 122002
Project AddressVILLAGE DHANKOT, SECTOR 102, GURUGRAM
DistrictGURUGRAM
TehsilGURGAON

Bank Details

Bank NameICICI BANK LIMITED ; BRANCH : SOLITAIRE PLAZA, M.G ROAD, GURUGRAM
Account Number245105000304
IFSC CodeICIC0002451
MICR Code110229222
Branch Code002451

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Lalit Jain, Ajay Kumar Agrawal, Rajesh Agarwal and Sumeet Kumar
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Uploaded

Development Details

Land Area1.579 (Acre)
Proposed FAR100
Permissible FAR78319
Total Licensed Land11.25 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS390.710
CONSTRUCTION OF ROADS1501
PAVEMENTS0
PARKS AND PLAYGROUNDS2288.60
GREEN BELTS0
VEHICLE PARKINGS212.5
ELECTRICITY SUB-STATION0
CLUB HOUSE932.302
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES842
ANY OTHER222.89
Total6390.002

Cost Details

Land Cost1146 Lakhs
Other Cost603.54 Lakhs
Estimated Project Cost6701.34 Lakhs
Estimated Infrastructure Cost1088 Lakhs
Estimated Apartment Construction Cost3863.80 Lakhs

Documents

FLOOR PLAN & AREA DIAGRAM BLK-B, A-17

Uploaded on: 22-02-2020

SECTION BLK-F, A-36

Uploaded on: 22-02-2020

SITE PLAN PARKING CALCULATION A-02

Uploaded on: 22-02-2020

ELEVATION BLK-F, A-34

Uploaded on: 22-02-2020

SECTION BLK-A, A-16

Uploaded on: 22-02-2020

SITE PLAN

Uploaded on: 22-02-2020

ELEVATION BLK-E A-31

Uploaded on: 22-02-2020

FLOOR PLAN & AREA DIAGRAM BLK-A, A-12

Uploaded on: 22-02-2020

ELEVATION BLK-E, A-30

Uploaded on: 22-02-2020

DEMARCATION PLAN

Uploaded on: 22-02-2020

ELEVATION BLK-B A-21

Uploaded on: 22-02-2020

SECTION BLK-E, A-32

Uploaded on: 22-02-2020

ELEVATION BLK C & D A-27

Uploaded on: 22-02-2020

FLOOR PLAN, AREA DIAGRAM BLK-E A-29A

Uploaded on: 22-02-2020

SECTION BLK C & D A-28

Uploaded on: 22-02-2020

FLOOR PLAN, AREA DIAGRAM BLK C & D A-24

Uploaded on: 22-02-2020

SITE PLAN A-01

Uploaded on: 22-02-2020

FLOOR PLAN & AREA DIAGRAM BLK-A, A-13

Uploaded on: 22-02-2020

FLOOR PLAN, AREA DIAGRAM BLK-E A-29B

Uploaded on: 22-02-2020

ELEVATION BLK-F A-35

Uploaded on: 22-02-2020

BASEMENT-2 FLOOR PLAN-A-04

Uploaded on: 22-02-2020

SERVICE PLAN DRAWING-IRRIGATION SYSTEM

Uploaded on: 22-02-2020

FLOOR PLAN & AREA DIAGRAM BLK-A, A-11

Uploaded on: 22-02-2020

SERVICE PLAN DRAWING-SEWER LAYOUT

Uploaded on: 22-02-2020

SECTION ELEVATION- EWS A-38

Uploaded on: 22-02-2020

FLOOR PLAN, AREA DIAGRAM BLK-F A-33B

Uploaded on: 22-02-2020

FLOOR PLANS, SEC, ELEV. N.SCHOOL.A-41

Uploaded on: 22-02-2020

LC-IV

Uploaded on: 22-02-2020

SERVICE PLAN DRAWING-STORM WATER

Uploaded on: 22-02-2020

FLOOR PLAN, AREA DIAGRAM BLK-F A-33A

Uploaded on: 22-02-2020

ELEVATION BLK-A, A-15

Uploaded on: 22-02-2020

PLAN SECTION ELEVATION- B WALL A-05

Uploaded on: 22-02-2020

LOI

Uploaded on: 22-02-2020

SERVICE PLAN DRAWING- FIRE FIGHTING

Uploaded on: 22-02-2020

SERVICE PLAN APPROVAL LETTER

Uploaded on: 22-02-2020

SERVICE PLAN ESTIMATE

Uploaded on: 22-02-2020

BASEMENT-I FLOOR PLAN A-03

Uploaded on: 22-02-2020

ELEVATION BLK-A, A-14

Uploaded on: 22-02-2020

ELEVATION BLK-B A-20

Uploaded on: 22-02-2020

FLOOR PLAN, AREA DIAGRAM BLK C & D A-23

Uploaded on: 22-02-2020

ELEVATION BLK-C & D A-26

Uploaded on: 22-02-2020

FLOOR PLAN, AREA DIAGRAM BLK C & D A-25

Uploaded on: 22-02-2020

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 22-02-2020

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 12-12-2019

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 12-12-2019

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 12-12-2019

CONSENT TO ESTABLISH DATED 22.05.14

Uploaded on: 12-12-2019

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 12-12-2019

AIRPORT AUTHORITY APPROVAL DATED 27.03.12

Uploaded on: 12-12-2019

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 16-12-2019

ARAVALI NOC DATED 02.05.14

Uploaded on: 12-12-2019

ENVIRONMENT CLEARANCE DATED 12.07.13

Uploaded on: 12-12-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 12-12-2019

FIRE SCHEME APPROVAL DATED 29.12.12

Uploaded on: 12-12-2019

ELECTRICITY LOAD SANCTION DATED 12.01.17

Uploaded on: 12-12-2019

FOREST NOC DATED 17.08.12

Uploaded on: 12-12-2019

WATER CONNECTION DATED 31.07.17

Uploaded on: 12-12-2019

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 12-12-2019

GIST OF IMPORTANT PROVISIONS OF BUYERS AGREEMENT

Uploaded on: 16-12-2019

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 16-12-2019

FLOOR PLAN, AREA DIAGRAM EWS, A-37

Uploaded on: 22-02-2020

FLOOR PLAN & AREA DIAGRAM BLK-B, A-18

Uploaded on: 22-02-2020

SECTION BLK-B A-22

Uploaded on: 22-02-2020

FLOOR PLANS, SEC, ELEV. COMMRL.BLDG.A-40

Uploaded on: 22-02-2020

FLOOR PLAN & AREA DIAGRAM BLK-B, A-19

Uploaded on: 22-02-2020

Statutory Approvals

LICENSE NO. 104 OF 2011Date: 12-12-2011Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 17-08-2012Status: ALREADY BEEN OBTAINED
AIRPORT HEIGHT CLEARANCEDate: 27-03-2012Status: ALREADY BEEN OBTAINED
WATER CONNECTIONDate: 31-07-2017Status: ALREADY BEEN OBTAINED
ELECTRICAL LOAD AVAILABILITYDate: 12-01-2017Status: ALREADY BEEN OBTAINED
ENVIRONMENTAL CLEARANCEDate: 12-07-2013Status: ALREADY BEEN OBTAINED
CONSENT TO ESTABLISHDate: 22-05-2014Status: ALREADY BEEN OBTAINED
FIRE SCHEME APPROVALDate: 29-12-2012Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: Yes
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT

NOC

ROADSProvider: HSVPApproval Status: Approved
WATER SUPPLYProvider: HSVPApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: HSVPApproval Status: Approved
STORM WATER DRAINAGEProvider: HSVPApproval Status: Approved

Project Team

Authorized Representative

SANJAY RASTOGI
Name
SANJAY RASTOGI
PAN
XXXX507R
Email
sanjay.rastogi@conscient.in
Mobile
9810030178
Landline
01242803000
Address
C-162 2nd Floor Ardee City Sec-52 Gurugram

Managing Director/CEO

LALIT JAIN
Name
LALIT JAIN
PAN
XXXX082R
Email
lalit.jain@conscient.in
Mobile
9811019338
Landline
01242803000
Address
12 Sultanpur Farms Mehrauli New Delhi-110030

Directors

LALIT JAIN
Name
LALIT JAIN
PAN
XXXX082R
Email
lalit.jain@conscient.in
Mobile
9811019338
Landline
01242803000
Address
12 Sultanpur Farms Mehrauli New Delhi-110030
RAJESH JAIN
Name
RAJESH JAIN
PAN
XXXX085J
Email
rajesh.jain@conscient.in
Mobile
9811019334
Landline
01242803000
Address
12 Sultanpur Farms Mehrauli New Delhi-110030
MANIT JAIN
Name
MANIT JAIN
PAN
XXXX570L
Email
Manit.jain@conscient.in
Mobile
9999999338
Landline
01242803000
Address
12 Sultanpur Farms Mehrauli New Delhi-110030
AJAY KUMAR AGRAWAL
Name
AJAY KUMAR AGRAWAL
PAN
XXXX438R
Email
Ajay.agrawal@conscient.in
Mobile
9811021702
Landline
01242803000
Address
H.No. 32Sector 16A Faridabad 121002
RAJESH AGARWAL
Name
RAJESH AGARWAL
PAN
XXXX924B
Email
rajesh@micromaxinfo.com
Mobile
9810044835
Landline
01242803000
Address
A-185 DLF Phase I Gurugram
RAHUL SHARMA
Name
RAHUL SHARMA
PAN
XXXX831A
Email
rahul@micromaxinfo.com
Mobile
9810044835
Landline
01242803000
Address
H No. 713 Block A Sushant Lok 1 Gurgaon 122002
VIKAS JAIN
Name
VIKAS JAIN
PAN
XXXX118G
Email
vikas@micromaxinfo.com
Mobile
9810044835
Landline
01242803000
Address
B - 1118 IInd Floor Block - B1 Paschim Vihar New Delhi - 110063
SUMEET KUMAR
Name
SUMEET KUMAR
PAN
XXXX875A
Email
sumeet@micromaxinfo.com
Mobile
9811151739
Landline
01242803000
Address
H.No.-62 Zone-H 45 Suvidha Kunj Pitampura Delhi-110034
ADITYA JAIN
Name
ADITYA JAIN
PAN
XXXX887N
Email
Rajesh.jain@conscient.in
Mobile
9811019334
Landline
01242803000
Address
12 Sultanpur Farms Mehrauli New Delhi-110030

Contact Details

Project ContactEmail: sanjay.rastogi@conscient.inMobile: 9810030178Landline: 01242803000
Project Contact PersonName: SANJAY RASTOGIEmail: sanjay.rastogi@conscient.inMobile: 9810030178Landline: 01242803000

Land Details

Land Area1.579 (Acre)
Proposed FAR100
Permissible FAR78319
Total Licensed Land11.25 (Acre)

Land Usage

Land Cost1146 Lakhs
Other Cost603.54 Lakhs
Estimated Project Cost6701.34 Lakhs
Estimated Infrastructure Cost1088 Lakhs
Estimated Apartment Construction Cost3863.80 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other13.84
Shopping area20
Roads & Pavements15.88
Water Supply System0
Storm Water Drainage4.76
Parks and Playgrounds5
Electricity Supply System66.5
Clubhouse/community centres462.4
Sewerage treatment & garbage disposal6.84

Quarterly Infrastructure Expenditure

2018 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System606083.620
Other56.2612.385
Parks and Playgrounds5500
Roads & Pavements0000
Sewerage treatment & garbage disposal0000
Shopping area6.96.900
Storm Water Drainage01012.940
Water Supply System23.111.848.30
2019 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System18.533.9900
Other6.820.8454.416.32
Parks and Playgrounds0000
Roads & Pavements0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Water Supply System0000

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEIMPORTED STONE FLOORING IN LIVING & DINNING, WOODEN FLOORING IN BEDROOMS AND TILE IN TOILET, KITCHEN, UTILITY AREA AND BALCONY.
WALL FINISHING DETAILSINTERNAL PAINT - PLASTIC EMULSION, OBD AND WHITE WASH. TOWER EXTERNAL WALLS - STONE CLADDING UP TO 1ST FLOOR LVL. & EXTERIOR EMULSION PAINT ON REMAINING AREAS.
KITCHEN DETAILSSTONE COUNTER TOP WITH 2FEET HIGH CERAMIC TILES ABOVE THE COUNTER AND CERAMIC TILE ON FLOOR 396 X 396 MM.
BATHROOM FITTINGSISI MARKED CP FITTINGS AND FIXTURES.
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESDOOR FRAMES - WOODEN WINDOW FRAMES - UPVC.
GLASS WORKFIXED GLASS - 4MM, 5 MM
ELECTRIC FITTINGSNA
CONDUCTING AND WIRING DETAILSPVC CONDUITS WITH PVC INSULATED WIRING.
CUPBOARD DETAILSNA
WATER STORAGEUNDERGROUND TANKS (RAW+TREATED + FIRE) + OVERHEAD TANKS (TREATED + FIRE )
LIFT DETAILSTOTAL 17 NOS LIFTS , 07 ARE STRETCHER LIFTS AND 10 ARE PASSENGER LIFTS.
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSUPVC GLAZED WINDOW.
DOORSDOOR FRAMES - RED MARANTI SEASONED WOOD WITH ANTI-TERMITE & BLACK JAPAN DOOR SHUTTERS - COMMERCIAL FLUSH DOOR SHUTTER FINISHED WITH PAINT AND POLISH.
MAIN DOORSDOOR FRAMES - RED MARANTI SEASONED WOOD WITH ANTI-TERMITE & BLACK JAPAN. SHUTTER - DOOR SHUTTER WITH MASONITE HDF SKIN WITH POLISH.
INTERNAL DOORSDOOR FRAMES - RED MARANTI SEASONED WOOD WITH ANTI-TERMITE & BLACK JAPAN. SHUTTER - FLUSH DOOR SHUTTER WITH BOTH SIDE ENAMEL PAINT.
AIR CONDITIONINGSPLIT AC
ELECTRICAL FITTINGSISI MARKED
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYWIFI - NOT PROVIDED. BROADBAND FACILITY - PROVIDED.
EXTERNAL FINISHING/COLOUR SCHEMETOWER EXTERNAL WALLS - STONE CLADDING UP TO 1ST FLOOR LVL. & REMAINING EXTERIOR EMULSION PAINT.
INTERNAL FINISHINGPLASTIC EMULSION, OBD, ENAMEL & WHITE WASH.

Unit-wise Specifications

TOILET
FLOOR396 X 396 MM CERAMIC TILE
WALLSCERAMIC TILE - 396 X 396 MM UP TO THE BOTTOM OF GRID CEILING AND REMAINING AREA WHITE WASH.
CEILINGGRID CEILING
COUNTERSGRANITE STONE COUNTER.
SANITARY WARE/CP FITTINGSWASH BASIN , WC,SHOWER,DIVERTOR, DUAL FLUSH CISTERN, SPOUT, HEALTH FAUCET,ANGLE VALVE.
FIXTURESISI MARKED FITTING / FIXTURES.
KITCHEN
FLOOR396 X 396 CERAMIC TILE
WALLSCERAMIC TILE - 396 X 396 MM UP TO 2 FEET HIGH ABOVE COUNTER AND REMAINING AREA PLASTIC EMULSION PAINT.
CEILINGPLATIC EMULSION PAINT
COUNTERSGRANITE STONE COUNTER.
FIXTURESISI MARKED FITTING / FIXTURES
KITCHEN APPLIANCESHOB AND HOOD
SIT-OUTS
FLOORTILES, STONES
WALLS & CEILINGPAINT
RAILINGSMS RAILING
FIXTURESNA
BED ROOMS
FLOORWOODEN FLOORING
WALLSPLASTIC EMULSION PAINT.
CEILINGPLASTIC EMULSION PAINT.
WARDROBESNA
MASTER TOILET
FLOORCERAMIC TILE - 396 X 396 MM
WALLSCERAMIC TILE - 396 X 396 MM UP TO THE BOTTOM OF GRID CEILING AND REMAINING AREA WHITE WASH.
CEILINGGRID CEILING.
COUNTERSCOMPOSITE STONE COUNTER.
SANITARY WARE/CP FITTINGSWASH BASIN , WC,SHOWER,DIVERTOR, DUAL FLUSH CISTERN, SPOUT, HEALTH FAUCET, ANGLE VALVE.
FITTING/FIXTURESISI MARKED FITTING / FIXTURES.
MASTER BEDROOM/DRESSROOM
FLOORWOODEN FLOORING
WALLSPLASTIC EMULSION PAINT
CEILINGPLASTIC EMULSION PAINT
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORIMPORTED STONE FLOORING.
WALLSPLASTIC EMULSION PAINT.
CEILINGPLASTIC EMULSION PAINT
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORCERAMIC TILE - 300 X 300 MM
WALLS & CEILINGOBD PAINT ON WALL & CEILING
TOILETFLOOR - 300 X 300 MM CERAMIC TILE. WALL - 300 X 300 MM CERAMIC TILE UP TO 1.0 MTR HEIGHT AND REST IS OBD. CEILING - OBD PAINT.
BALCONYFLOOR - 300 X 300 MM CERAMIC TILE. RAILING - M.S. RAILING WITH GLASS. CEILING - EXTERIOR EMULSION PAINT.

Fee Details

Payment 1
amount:130000
cheque no:535774
draft date:20-12-2017
payable to:HRERA Gurugram
payee bank:ICICI BANK LIMITED
Payment 2
amount:65000
cheque no:538088
draft date:21-03-2018
payable to:HRERA Gurugram
payee bank:ICICI BANK LIMITED
HERITAGE MAX - TOWER F by DREAMHOME INFRASTRUCTURE PVT LTD | ReraTracker