ONGOINGActive

GODREJ SUMMIT

GURUGRAM, GURGAON
14-08-2020
Launch Date
ONGOING
Type
2018-09-30
Completion Date

Overview

Launch Date

14-08-2020

Completion Date

2018-09-30

RERA ID

RERA-GRG-653-2020

Basic Details

Project NameGODREJ SUMMIT
Project IDRERA-GRG-653-2020
Project TypeONGOING
Applicant TypeCompany
Submission Date14-08-2020 06:47:42 PM
Builder NameGODREJ PROJECTS DEVELOPMENT LIMITED
CINU70102MH2010PTC210227
PANXXXX316L
Emailho_rera@godrejproperties.com
Websitehttp://www.godrejproperties.com
Phone (Mobile)1244956150
Phone (Landline)01244956150
Registered Address5TH FLOOR GODREJ ONE EASTERN EXPRESS HIGHWAY VIKROLI MUMBAI
Project AddressSECTOR 104
DistrictGURUGRAM
TehsilGURGAON

Bank Details

Bank NameMANECKJI WADIA BLDG, GROUND FLOOR, NANIK MOTWANI MARG, FORT, MUMBAI-400023 MAHARASHTRA
Account Number57500000018261
IFSC CodeHDFC0000060
MICR Code110240366
Branch Code3676

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Sushil Sharma and Nitesh Katariya
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Not specified

Development Details

Land Area2.0130 (Acre)
Proposed FAR1.75
Permissible FAR1.75
Total Licensed Land22.123 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
CONSTRUCTION OF ROADS0
PAVEMENTS0
PARKS AND PLAYGROUNDS0
GREEN BELTS0
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
Total0

Cost Details

Land Cost0 Lakhs
Other Cost5364.25 Lakhs
Estimated Project Cost14162.37 Lakhs
Estimated Infrastructure Cost913.76 Lakhs
Estimated Apartment Construction Cost7884.35 Lakhs

Documents

ZONING PLAN

Uploaded on: 25-02-2020

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 25-02-2020

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 25-02-2020

RENEWAL OF CTE

Uploaded on: 25-02-2020

APPROVAL OF ELECTRIC LOAD CONNECTION

Uploaded on: 25-02-2020

NOC FOR FOREST

Uploaded on: 25-02-2020

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 26-02-2020

RENEWAL OF AAI

Uploaded on: 25-02-2020

APPROVAL OF FIRE NOC, PHASE II

Uploaded on: 25-02-2020

OCCUPATION CERTIFICATE, PHASE III

Uploaded on: 25-02-2020

APPROVAL OF BUILDING PLAN

Uploaded on: 25-02-2020

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 25-02-2020

APPROVAL OF SERVICE PLAN ESTIMATES

Uploaded on: 25-02-2020

RENEWAL OF LICENCE NO. 102 OF 2011

Uploaded on: 25-02-2020

AAI

Uploaded on: 25-02-2020

SERVICE PLAN ESTIMATE REPORT

Uploaded on: 25-02-2020

ENVIRONMENT CLEARANCE

Uploaded on: 25-02-2020

FIRE NOC, PHASE I

Uploaded on: 25-02-2020

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 26-02-2020

OCCUPATION CERTIFICATE, PHASE I

Uploaded on: 25-02-2020

APPROVAL OF SEWERAGE

Uploaded on: 25-02-2020

APPROVAL OF STORM WATER CONNECTION

Uploaded on: 25-02-2020

DEMARCATION PLAN

Uploaded on: 26-02-2020

APPROVAL OF WATER SUPPLY FOR DOMESTIC PURPOSE

Uploaded on: 25-02-2020

APPROVAL OF CHANGE OF DEVELOPER

Uploaded on: 25-02-2020

EXTENSION OF MINING APPORVAL

Uploaded on: 25-02-2020

SINGLE LINE DIAGRAM

Uploaded on: 26-02-2020

NOC FOR CONSTRUCTION ACTIVITY FROM HUDA

Uploaded on: 25-02-2020

APPROVAL OF CONSENT TO OPERATE

Uploaded on: 25-02-2020

APPROVAL OF CTE

Uploaded on: 25-02-2020

MINING APPROVAL

Uploaded on: 25-02-2020

OCCUPATION CERTIFICATE, PHASE II

Uploaded on: 25-02-2020

APPROVAL OF FIRE SCHEME

Uploaded on: 25-02-2020

APPROVAL OF FIRE NOC, PHASE III

Uploaded on: 25-02-2020

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 11-08-2020

FINANCIALS FOR FY2018-19

Uploaded on: 06-07-2020

FINANCIALS FOR FY2016-17

Uploaded on: 06-07-2020

FINANCIALS FOR FY2017-18

Uploaded on: 06-07-2020

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 14-08-2020

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 11-08-2020

Statutory Approvals

LICENCEDate: 07-12-2011Status: ALREADY BEEN OBTAINED
RENEWAL OF LICENCEDate: 10-02-2020Status: ALREADY BEEN OBTAINED
CHANGE OF DEVELOPERDate: 25-01-2018Status: ALREADY BEEN OBTAINED
ZONING PLANDate: 08-12-2011Status: ALREADY BEEN OBTAINED
AAIDate: 30-01-2012Status: ALREADY BEEN OBTAINED
RENEWAL OF AAIDate: 14-12-2017Status: ALREADY BEEN OBTAINED
NOC FOR CONSTRUCTION ACTIVITYDate: 03-10-2012Status: ALREADY BEEN OBTAINED
BUILDING PLANDate: 05-09-2012Status: ALREADY BEEN OBTAINED
PERMISSION FOR MININGDate: 13-03-2013Status: ALREADY BEEN OBTAINED
EXTENSION OF MINING PERMISSIONDate: 11-11-2014Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 24-04-2012Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCEDate: 04-09-2013Status: ALREADY BEEN OBTAINED
CONSENT TO ESTABLISHDate: 09-10-2013Status: ALREADY BEEN OBTAINED
EXTENSION OF VALIDITY PERIOD OF CTEDate: 02-11-2016Status: ALREADY BEEN OBTAINED
FIRE SCHEMEDate: 21-01-2013Status: ALREADY BEEN OBTAINED
ELECTRICAL LOADDate: 31-03-2015Status: ALREADY BEEN OBTAINED
SERVICE PLAN ESTIMATESDate: 19-01-2015Status: ALREADY BEEN OBTAINED
FIRE NOC, PHASE IDate: 09-01-2017Status: ALREADY BEEN OBTAINED
FIRE NOC, PHASE IIDate: 26-05-2017Status: ALREADY BEEN OBTAINED
FIRE NOC, PHASE IIIDate: 18-05-2018Status: ALREADY BEEN OBTAINED
WATER PERMISSIONDate: 20-11-2017Status: ALREADY BEEN OBTAINED
SEWERAGE PERMISSIONDate: 17-07-2018Status: ALREADY BEEN OBTAINED
STORM WATER CONNECTIONDate: 06-07-2018Status: ALREADY BEEN OBTAINED
OCCUPATION CERTIFICATE, PHASE IDate: 07-04-2017Status: ALREADY BEEN OBTAINED
OCCUPATION CERTIFICATE, PHASE IIDate: 20-06-2017Status: ALREADY BEEN OBTAINED
OCCUPATION CERTIFICATE, PHASE IIIDate: 26-12-2018Status: ALREADY BEEN OBTAINED
CONSENT TO OPERATEDate: 11-07-2017Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: No
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: No
Detail of covered area achieved FARApproved: No
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: No
PARKING PLANApproved: Yes
IRRIGATION LAYOUT PLANApproved: Yes
FIRE FIGHTING SCHEME LAYOUT PLANApproved: Yes
FLUSHING LAYOUT PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSYET TO BE PREPARED
WATER SUPPLY SYSTEMYET TO BE PREPARED
STORM WATER DRAINAGEYET TO BE PREPARED
ELECTRICITY SUPPLY SYSTEMYET TO BE PREPARED
SEWAGE TREATMENT & GARBAGE DISPOSALYET TO BE PREPARED
STREET LIGHTINGYET TO BE PREPARED
SECURITY AND FIRE FIGHTINGYET TO BE PREPARED
PLAYGROUNDS AND PARKSYET TO BE PREPARED
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED

NOC

ROADSProvider: HUDA/GMDApproval Status: Approved
WATER SUPPLYProvider: HUDA/GMDApproval Status: Approved
ELECTRICITYProvider: DHVBNApproval Status: Approved
SEWAGE DISPOSALProvider: HUDA/GMDApproval Status: Approved
STORM WATER DRAINAGEProvider: HUDA/GMDApproval Status: Approved

Project Team

Authorized Representative

GURMUKH SINGH BAJWA
Name
GURMUKH SINGH BAJWA
PAN
XXXX631L
Email
ho_rera@godrejproperties.com
Mobile
1244956150
Landline
01244956150
Address
301 Tower 2 Unitech Harmony Sector 50 Gurugram

Managing Director/CEO

AMITAVA MUKHARJEE
Name
AMITAVA MUKHARJEE
PAN
XXXX024G
Email
ho_rera@godrejproperties.com
Mobile
1244956150
Landline
01244956150
Address
52 Panchsheel 64 Pali Hill Nargis Dutt Road Bandra West Mumbai

Directors

AMIT CHOUDHARY
Name
AMIT CHOUDHARY
PAN
XXXX516K
Email
ho_rera@godrejproperties.com
Mobile
1244956150
Landline
01244956150
Address
C304 Golden Oak Hiranandani Gardens Powai Mumbai
ASPY DADY COOPER
Name
ASPY DADY COOPER
PAN
XXXX827G
Email
ho_rera@godrejproperties.com
Mobile
1244956150
Landline
01244956150
Address
Vivarea A-502 Sane Guruji Marg Jacob Circle Mahalaxmi Mumbai
RAJIB DAS
Name
RAJIB DAS
PAN
XXXX350P
Email
ho_rera@godrejproperties.com
Mobile
1244956150
Landline
01244956150
Address
101 Tulip Hirandani Gardens Powai Mumbai
RABI KANT SHARMA
Name
RABI KANT SHARMA
PAN
XXXX390M
Email
ho_rera@godrejproperties.com
Mobile
1244956150
Landline
01244956150
Address
1102 Jupiter Building No 9 Pokhram Road No 2 Gawang Baug Kokalpada Thane Apana Bazar Mumbai
SUBHA CHAKRABARTI
Name
SUBHA CHAKRABARTI
PAN
XXXX307E
Email
ho_rera@godrejproperties.com
Mobile
1244956150
Landline
01244956150
Address
6 Baroda Avenue Garia Kolkata
K UDAY BHASKAR
Name
K UDAY BHASKAR
PAN
XXXX623Q
Email
ho_rera@godrejproperties.com
Mobile
1244956150
Landline
01244956150
Address
Flat No 10046 Prestige Shantnikolan Apartment IPTL Main Road Hondi Bangalore

Contact Details

Project ContactEmail: ho_rera@godrejproperties.comMobile: 1244956150Landline: 1244956150
Project Contact PersonName: GURMUKH SINGH BAJWAEmail: ho_rera@godrejproperties.comMobile: 1244956150Landline: 1244956150

Land Details

Land Area2.0130 (Acre)
Proposed FAR1.75
Permissible FAR1.75
Total Licensed Land22.123 (Acre)

Land Usage

Land Cost0 Lakhs
Other Cost5364.25 Lakhs
Estimated Project Cost14162.37 Lakhs
Estimated Infrastructure Cost913.76 Lakhs
Estimated Apartment Construction Cost7884.35 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area20
Roads & Pavements89.01
Water Supply System66.88
Storm Water Drainage0
Parks and Playgrounds17.35
Electricity Supply System88.38
Clubhouse/community centres185.7
Sewerage treatment & garbage disposal20

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILE OR EQV. IN LIVING/DINING, WOODEN FLOORING OR EQV. IN BEDROOMS, ANTI-SKID TILES OR EQV. IN TOILETS, KITCHEN, BALCONY & UTILITY
WALL FINISHING DETAILSACRYLIC EMULSION OR EQV. IN INTENAL WALLS, OIL BOUND DISTEMPER OR EQV. IN CEILING, WEATHER PROOF OR EQV. IN EXTERNAL
KITCHEN DETAILSGRANITE COUNTER WITH SINK AND CP FITTINGS
BATHROOM FITTINGSYES - CP/SANITARY
WOOD WORK ETCYES
DOORS AND WINDOS FRAMESINTERNAL:MODULED SHUTTERS WITH HARDWOOD FRAMES EXTERNAL:MODULED SHUTTER IN TEAK FINISH WITH TEAK WOOD FRAME
GLASS WORKYES, WINDOWS
ELECTRIC FITTINGSONLY SWITCHES
CONDUCTING AND WIRING DETAILSYES
CUPBOARD DETAILSNO WARDROBE
WATER STORAGEUNDERGROUND WATER TANK
LIFT DETAILSYES
EXTERNAL GLAZINGSALUMINIUM
WINDOWS/GLAZINGSALUMINIUM
DOORSINTERNAL:MODULED SHUTTERS WITH HARDWOOD FRAMES EXTERNAL:MODULED SHUTTER IN TEAK FINISH WITH TEAK WOOD FRAME
MAIN DOORSMODULED SHUTTER IN TEAK FINISH WITH TEAK WOOD FRAME
INTERNAL DOORSMODULED SHUTTERS WITH HARDWOOD FRAMES
AIR CONDITIONINGNO
ELECTRICAL FITTINGSALL PROVIDED OF STANDARD COMPANY MAKE
CNG PIPE LINENO
PROVISION OF WIFI AND BROADBAND FACILITYNO
EXTERNAL FINISHING/COLOUR SCHEMEGOOD QUALITY EXTERNAL GRADE PAINT
INTERNAL FINISHINGNA

Unit-wise Specifications

TOILET
FLOORANTI SKID CERAMIC TILE OR EQV.
WALLSCERAMIC TILE DADO OR EQV.
CEILINGGRID CEILING OR EQUIVALENT
COUNTERSGRANITE OR EQV.
SANITARY WARE/CP FITTINGSSINK AND CP FITTINGS
FIXTURESNONE
KITCHEN
FLOORANTI SKID CERAMIC TILE OR EQV.
WALLSCERAMIC TILES 2'-0" ABOVE COUNTER.
CEILINGOIL BOUND DISTEMPER OR EQV.
COUNTERSMARBLE/ GRANITE OR EQV.
FIXTURESSTEEL SINK WITH DRAIN BOARD
KITCHEN APPLIANCESNO
SIT-OUTS
FLOORVITRIFIED TILE OR EQV.
WALLS & CEILINGACRYLIC EMULSION OR EQV. IN INTERNAL WALLS AND OIL BOUND DISTEMPER OR EQV. IN CEILING
RAILINGSENAMEL PAINT
FIXTURESNONE
BED ROOMS
FLOORLAMINATED WOODEN FLOORING OR EQV.
WALLSACRYLIC EMULSION OR EQV.
CEILINGOIL BOUND DISTEMPER OR EQV.
WARDROBESNO
MASTER TOILET
FLOORANTI SKID CERAMIC TILE OR EQV.
WALLSACRYLIC EMULSION OR EQV.TILE CLADDING :TILL 7'-0" ON ALL SIDES
CEILINGGRID CEILING
COUNTERSGRANITE OR EQV.
SANITARY WARE/CP FITTINGSWASHBASIN AND CP FITTINGS
FITTING/FIXTURESNONE
MASTER BEDROOM/DRESSROOM
FLOORLAMINATED WOODEN FLOORING OR EQV.
WALLSACRYLIC EMULSION OR EQV.
CEILINGOIL BOUND DISTEMPER OR EQV.
MODULAR WARDROBESNO
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILE /MARBLE
WALLSACRYLIC EMULSION OR EQV.
CEILINGOIL BOUND DISTEMPER OR EQV.
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORCERAMIC TILE OR EQV
WALLS & CEILINGACRYLIC EMULSION OR EQV. IN INTENAL WALLS, OIL BOUND DISTEMPER OR EQV. IN CEILING
TOILETANTI-SKID CERAMIC TILE OR EQV.
BALCONYANTI-SKID CERAMIC TILE OR EQV.

Fee Details

Payment 1
amount:00100
cheque no:100
draft date:01-07-2017
payable to:HRERA Gurugram
payee bank:HDFC BANK