OngoingActive

ATS RHAPSODY

Gautam Buddha Nagar, Uttar Pradesh
01-10-2017
Launch Date
Ongoing
Type
30-03-2025
Completion Date

Overview

Launch Date

01-10-2017

Completion Date

30-03-2025

RERA ID

UPRERAPRJ4115

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)23144
Project NameATS RHAPSODY
Registration Fee (in Rs.)121000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)90
DistrictGautam Buddha Nagar
Original Start Date01-10-2017
TehsilGautam Buddha Nagar
Proposed Start Date01-10-2017
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)43159
Proposed Completion Date30-03-2025

Location

Latitude

28.575364

Longitude

77.430101

Bank Details

Account no.003105033198
Name Of Account HolderATS TOWNSHIP PRIVATE LIMITED-RETENTION ACCOUNT
Bank NameICICI BANK
Branch AddressK-1,SENIOR MALL,SECTOR-18,NOIDA,UP-201301
Branch NameICICI BANK K-1,SENIOR MALL,SECTOR-18,NOIDA,UP-201301
IFSC CodeICIC0000031

Development Works

Demarcation of Plots

YES

Boundary Wall

YES

Road Work

YES

Footpaths

YES

Water Supply Including Drinking Water Facilities

YES

Sewer System

YES

Drain

YES

Parks

YES

Tree Planting

YES

Design For Electric Supply Including Street Lighting

YES

Community Buildings

YES

Treatment and Disposal System of Sewage and Sullage water

YES

Solid Waste Management And Disposal System

YES

Water Conservation System

YES

Energy Management System Including Use of Renewable Energy

YES

Fire Protection And Fire Safety System

YES

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

YES

Other Miscellaneous Work

NA

Documents

Lease Deed

No: 29688 | Date: 16-09-2014

Commencement Certificate

Other Plan(If Any)

Proforma of Application Form

Proforma of Allotment Letter

Proforma of Allotment Letter

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Waste Disposal Plan

Water Supply Plan

Electricity Supply Plan

Electricity Supply Plan

Development Work Plan

Affidavit

Details of Encumbrances

Uploaded: 20-06-2018

CA CERTIFICATE

Uploaded: 06-07-2018

ARCHITECT CERTIFICATE

Uploaded: 06-07-2018

ENGINEERS CERTIFICATE

Uploaded: 06-07-2018

Affidavit

Uploaded: 29-07-2017

Registry Document In Case of Own Land

Uploaded: 11-01-2018

Registry Document In Case of Own Land

Uploaded: 11-01-2018

Details of Encumbrances

Uploaded: 11-01-2018

Authentic copy of Approval of Project

Uploaded: 11-01-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 11-01-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 11-01-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 11-01-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 11-01-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 11-01-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 11-01-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 11-01-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 11-01-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 11-01-2018

Floor plans of all types

Uploaded: 11-01-2018

Floor plans of all types

Uploaded: 11-01-2018

Floor plans of all types

Uploaded: 11-01-2018

Floor plans of all types

Uploaded: 11-01-2018

Floor plans of all types

Uploaded: 11-01-2018

Proforma of Application Form

Uploaded: 11-01-2018

Proforma of Allotment Letter

Uploaded: 11-01-2018

Waste Disposal Plan

Uploaded: 11-01-2018

Waste Disposal Plan

Uploaded: 11-01-2018

Water Supply Plan

Uploaded: 11-01-2018

Electricity Supply Plan

Uploaded: 11-01-2018

Development Work Plan

Uploaded: 11-01-2018

Commencement Certificate

Uploaded: 05-04-2018

Permits

Orignal Permit NoPLG/BP - 3804/249
Orignal Permit Date06-03-2017
Valid Upto05-03-2022
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto05-03-2027
End Date01-10-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameAr. Gaurav Sood
Architect AddressATS TOWER, PLOT No-16, SECTOR-135, UP.
Architect Licence NumberCA/2011/52656
Structural Engineer NameKAMAL SABHARWAL
Structural Engineer AddressH-25,2ND FLOOR (LEVEL-3), KAILASH COLONY MARKET, NEW DELHI-110048
Mobile number(Project Co-ordinator)9643007884

Land Details

AFS

Showing 3 blocks with 76 units

Property Summary

Total Carpet Area

71907.22 m²

774002.13 ft²

Total Units

579

4 different types

Blocks & Floors

3

32 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:124.19 m²
Balconies:259
Parking ratio:0.00 per unit

Block COMMERCIAL

10 units

Block TOWER-1, 2 & 5

34 units

Block TOWER-3,4,6 & 7

32 units

Khasra Details

Total Area

23144.00 m²

249119.70 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoPLOT NO. GH-12/1, SECTOR-01, GREATER NOIDA, UP
Area(In Sq. Mt.)23144

Other Details

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameAr. Gaurav Sood
Architect AddressATS TOWER, PLOT No-16, SECTOR-135, UP.
Architect Licence NumberCA/2011/52656
Structural Engineer NameKAMAL SABHARWAL
Structural Engineer AddressH-25,2ND FLOOR (LEVEL-3), KAILASH COLONY MARKET, NEW DELHI-110048
Mobile number(Project Co-ordinator)9643007884