ONGOINGActive

ATS MARIGOLD

GURUGRAM, GURGAON
24-12-2019
Launch Date
ONGOING
Type
2027-02-28
Completion Date

Overview

Launch Date

24-12-2019

Completion Date

2027-02-28

RERA ID

RERA-GRG-345-2019

Basic Details

Project NameATS MARIGOLD
Project IDRERA-GRG-345-2019
Project TypeONGOING
Applicant TypeCompany
Submission Date24-12-2019 05:17:35 AM
Builder NameATS REAL ESTATE BUILDERS PVT LTD
CINU70102DL2012PTC241202
PANXXXX766C
Emailcompliances@atsgreens.com
Websitehttp://www.atsgreens.com
Phone (Mobile)9643007884
Phone (Landline)01207111500
Registered AddressATS TOWER PLOT- 16 SECTOR 135, NOIDA -201305
Project AddressSECTOR 89A, VILLAGE- HARSARU, TEHSIL & DISTRICT GURUGRAM, STATE-HARYANA
DistrictGURUGRAM
TehsilGURGAON

Bank Details

Bank NameHDFC BANK LTD. SECTOR 18 NOIDA
Account Number57500000129256
IFSC CodeHDFC0000088
MICR Code110240181
Branch Code000088

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Mr. Pritam Kumar Jha, Address: ATS Tower, Plot No-16, Sector 135 Noida- 201305
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Attached

Development Details

Land Area11.125 (Acre)
Proposed FAR173.9
Permissible FAR175
Total Licensed Land11.125 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS2.028
CONSTRUCTION OF ROADS1.239
PAVEMENTS0.460
PARKS AND PLAYGROUNDS3.259
GREEN BELTS0.367
VEHICLE PARKINGS1.085
ELECTRICITY SUB-STATION0.007
CLUB HOUSE0.050
SEWAGE AND SOLID WASTE TREATMENT FACILITY0.007
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0.106
ANY OTHER2.517
Total11.125

Cost Details

Land Cost14879 Lakhs
Other Cost35959.52 Lakhs
Estimated Project Cost76539.52 Lakhs
Estimated Infrastructure Cost1390.5 Lakhs
Estimated Apartment Construction Cost24310.50 Lakhs

Documents

REGISTRATION FEE DEMAND DRAFT

Uploaded on: 17-02-2020

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 12-12-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 12-12-2019

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 12-12-2019

ZONING PLAN

Uploaded on: 12-12-2019

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 12-12-2019

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 12-12-2019

GIST OF THE IMPORTANT PROVISIONS OF DRAFT AGREEMENT

Uploaded on: 28-01-2021

AIRPORT HEIGHT CLEARANCE

Uploaded on: 07-02-2020

ATS MARIGOLD LOI

Uploaded on: 07-02-2020

BOARD RESOLUTION

Uploaded on: 07-02-2020

NON ENCUMBRANCE CERTIFICATE

Uploaded on: 07-02-2020

ENVIRONMENT CLEARANCE APPROVAL

Uploaded on: 07-02-2020

DEMARCATION PLAN

Uploaded on: 07-02-2020

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 07-02-2020

FIRE NOC

Uploaded on: 07-02-2020

LICENSE ALONG WITH LAND SCHEDULE

Uploaded on: 07-02-2020

FOREST NOC

Uploaded on: 07-02-2020

LC-IV

Uploaded on: 07-02-2020

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 01-06-2021

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 22-07-2021

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 22-07-2021

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 22-07-2021

COD

Uploaded on: 27-07-2021

SERVICE PLAN ESTIMATES

Uploaded on: 28-07-2021

BUILDING PLAN APPROVAL LETTER (BR-III)

Uploaded on: 27-07-2021

RENEWAL OF LICENSE (MARIGOLD)

Uploaded on: 27-07-2021

DEFICIT FEES

Uploaded on: 27-07-2021

SERVICE PLAN ESTIMATES APPROVAL LETTER

Uploaded on: 28-07-2021

Statutory Approvals

FIRE FIGHTING (NOC)Date: 29-12-2014Status: ALREADY BEEN OBTAINED
SERVICE ESTIMATEDate: 08-01-2016Status: ALREADY BEEN OBTAINED
HEIGHT CLEARANCE (AAI)Date: 02-01-2014Status: ALREADY BEEN OBTAINED
NWBL NOCDate: 12-06-2014Status: ALREADY BEEN OBTAINED
FOREST (ARAWALI) NOCDate: 01-04-2013Status: ALREADY BEEN OBTAINED
WATER NOCDate: 28-11-2013Status: ALREADY BEEN OBTAINED
STRUCTURE STABILITYDate: 16-05-2015Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCEDate: 03-09-2014Status: ALREADY BEEN OBTAINED
HARYANA STATE POLLUTION CONTROL BOARDDate: 20-11-2014Status: ALREADY BEEN OBTAINED
SANCTION LETTERDate: 06-06-2016Status: ALREADY BEEN OBTAINED
TEMPORARY STRUCTURE APPROVALDate: 24-12-2013Status: ALREADY BEEN OBTAINED
ZONING PLANDate: 11-10-2013Status: ALREADY BEEN OBTAINED
ELECTRIC POWER UNDERTAKING & APPLICATIONDate: 27-11-2013Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: No
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: Yes
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSSUBMITTED TO HUDA
WATER SUPPLY SYSTEMSUBMITTED TO HUDA
STORM WATER DRAINAGESUBMITTED TO HUDA
ELECTRICITY SUPPLY SYSTEMSUBMITTED TO HUDA
SEWAGE TREATMENT & GARBAGE DISPOSALSUBMITTED TO HUDA
STREET LIGHTINGSUBMITTED TO HUDA
SECURITY AND FIRE FIGHTINGSUBMITTED TO HUDA
PLAYGROUNDS AND PARKSSUBMITTED TO HUDA
CLUB HOUSE/COMMUNITY CENTRESUBMITTED TO HUDA
SHOPPING AREASUBMITTED TO HUDA
RENEWABLE ENERGY SYSTEMSUBMITTED TO HUDA
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYSUBMITTED TO HUDA
ANY OTHERSUBMITTED TO HUDA
PARKINGSUBMITTED TO HUDA
STPSUBMITTED TO HUDA
UNDERGROUND WATER TANK AND PUMP ROOMSUBMITTED TO HUDA
RAINWATER HARVESTINGSUBMITTED TO HUDA
BOUNDARY WALL AND ENTRANCE AND EXIT GATESSUBMITTED TO HUDA
ELECTRICAL SUBSTATIONSUBMITTED TO HUDA

NOC

ROADSProvider: HUDAApproval Status: Pending
WATER SUPPLYProvider: HUDAApproval Status: Pending
ELECTRICITYProvider: DHBVNApproval Status: Pending
SEWAGE DISPOSALProvider: HUDAApproval Status: Pending
STORM WATER DRAINAGEProvider: HUDAApproval Status: Pending

Project Team

Authorized Representative

TIKA SINGH RAWAT
Name
TIKA SINGH RAWAT
PAN
XXXX617R
Email
Narendra.Kumar@atsgreens.com
Mobile
9910490836
Landline
01207111500
Address
S-164 A SCHOOL BLOCK 2nd FLOOR SHAKARPUR DELHI 110092 DL IN

Managing Director/CEO

MR GETAMBER ANAND  HOD
Name
MR GETAMBER ANAND HOD
PAN
XXXX868K
Email
getamber@atsgreens.com
Mobile
8929882792
Landline
01207111500
Address
C-226 Sector 44 Noida UP 201301

Directors

MR GETAMBER ANAND
Name
MR GETAMBER ANAND
PAN
XXXX868K
Email
getamber@atsgreens.com
Mobile
8929882792
Landline
01207111500
Address
C-226 Sector 44 Noida UP 201301
MR VIPUL KUMAR MAHESHWARI
Name
MR VIPUL KUMAR MAHESHWARI
PAN
XXXX743R
Email
vipul.maheshwari@atsgreens.com
Mobile
9532598333
Landline
01207111500
Address
Flat No -24 Brothers Apartment- 16. I. P.Extention New Delhi 110092

Contact Details

Project ContactEmail: compliances@atsgreens.comMobile: 9910490800Landline: 01207111500
Project Contact PersonName: MR ARUN THAKUREmail: arunthakur@atsgreens.comMobile: 9910490800Landline: 01207111500

Land Details

Land Area11.125 (Acre)
Proposed FAR173.9
Permissible FAR175
Total Licensed Land11.125 (Acre)

Land Usage

Land Cost14879 Lakhs
Other Cost35959.52 Lakhs
Estimated Project Cost76539.52 Lakhs
Estimated Infrastructure Cost1390.5 Lakhs
Estimated Apartment Construction Cost24310.50 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
STP61.08
Other0
School0
Parking0
Shopping area0
Security System0
Street Lighting0
Roads & Pavements18.15
Water Supply System0
Rainwater Harvesting6.08
Storm Water Drainage35.87
Electrical SubStation10.21
Parks and Playgrounds0.33
Electricity Supply System0
Clubhouse/community centres0
Underground Water Tank and Pump Room0
Sewerage treatment & garbage disposal15.09
Boundary Wall and Entrance and Exit Gates49
Fire Fighting Services and Security System0

Quarterly Infrastructure Expenditure

2019 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall and Entry Exit Gate and Signage etc----
Clubhouse/community centres---0
Electrical Sub Station----
Electrical SubStation----
Electricity Supply System---0
Fire Fighting Services and Security----
Fire Fighting System and Security----
Other---0
Other Cost----
Parking----
Parks and Playgrounds---0
Rain Water Harvesting----
Roads & Pavements---0
STP----
School----
Sewerage treatment & garbage disposal---0
Shopping area---0
Storm Water Drainage---0
Street Lighting----
Underground Water Tank and Pump Room----
Water Supply System---0
2020 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall and Entry Exit Gate and Signage etc----
Clubhouse/community centres0000
Electrical Sub Station----
Electrical SubStation----
Electricity Supply System0000
Fire Fighting Services and Security----
Fire Fighting System and Security----
Other0000
Other Cost----
Parking----
Parks and Playgrounds0000
Rain Water Harvesting----
Roads & Pavements0000
STP----
School----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Lighting----
Underground Water Tank and Pump Room----
Water Supply System0000
2021 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall and Entry Exit Gate and Signage etc0-015
Clubhouse/community centres00039.5
Electrical Sub Station--5050
Electrical SubStation----
Electricity Supply System0000
Fire Fighting Services and Security----
Fire Fighting System and Security0000
Other0011
Other Cost00--
Parking--55
Parks and Playgrounds0005
Rain Water Harvesting--05
Roads & Pavements002020
STP--55
School----
Sewerage treatment & garbage disposal0022
Shopping area0000
Storm Water Drainage0033
Street Lighting0035
Underground Water Tank and Pump Room005050
Water Supply System0033
2022 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall and Entry Exit Gate and Signage etc15030
Clubhouse/community centres80100100115
Electrical Sub Station----
Electrical SubStation10030300
Electricity Supply System0000
Fire Fighting Services and Security1.7000
Fire Fighting System and Security----
Other1001
Other Cost----
Parking--05
Parks and Playgrounds5000
Rain Water Harvesting3000
Roads & Pavements200200
STP320-5
School0-0-
Sewerage treatment & garbage disposal1010
Shopping area0000
Storm Water Drainage3221
Street Lighting5002
Underground Water Tank and Pump Room3030-10
Water Supply System3002
2023 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall and Entry Exit Gate and Signage etc3005
Clubhouse/community centres39.5000
Electrical Sub Station----
Electrical SubStation1020011.91
Electricity Supply System0000
Fire Fighting Services and Security0000
Fire Fighting System and Security----
Other1111
Other Cost----
Parking0000
Parks and Playgrounds3003.31
Rain Water Harvesting0000
Roads & Pavements1507.860
STP005.450
School----
Sewerage treatment & garbage disposal1000.77
Shopping area0000
Storm Water Drainage1111
Street Lighting0000
Underground Water Tank and Pump Room00010.96
Water Supply System001.550
2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall and Entry Exit Gate and Signage etc----
Clubhouse/community centres0---
Electrical Sub Station----
Electrical SubStation1---
Electricity Supply System0---
Fire Fighting Services and Security----
Fire Fighting System and Security----
Other3.1---
Other Cost----
Parking----
Parks and Playgrounds0---
Rain Water Harvesting1.43---
Roads & Pavements0---
STP----
School----
Sewerage treatment & garbage disposal0---
Shopping area0---
Storm Water Drainage0.48---
Street Lighting3.19---
Underground Water Tank and Pump Room----
Water Supply System0---

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES FLOORING IN LIVING, DINING & LOBBY- WOODEN/ VITRIFIED TILES FLOORING IN BEDROOMS- VITRIFIED TILES IN KITCHEN, UTILITY & SERVANT ROOM AND CERAMIC TILES IN TOILETS. STAIRCASE & LANDINGS TO BE IN WHITE MARBLE FLOORING. BALCONIES WILL BE IN ANTI-SKID CERAMIC FLOORING
WALL FINISHING DETAILSOIL BOUND DISTEMPER OF APPROPRIATE COLOUR ON INTERIOR WALLS
KITCHEN DETAILSALL KITCHEN COUNTERS IN PRE-POLISHED GRANITE/ MARBLE STONE, ELECTRICAL POINTS FOR KITCHEN CHIMNEY & HOB, WASHING MACHINE & FRIDGE TO BE PROVIDED. KITCHEN WILL BE PROVIDED WITH MODULAR CABINETS OF APPROPRIATE FINISH
BATHROOM FITTINGSPREMIUM SANITARY FIXTURES, PREMIUM CHROME PLATED FITTINGS
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESMAIN ENTRANCE DOOR AS ENGINEERED DOOR WITH POLISHED WOOD VENEER AND SOLID WOOD/TIMBER FRAME. ALL INTERNAL DOORS ARE FLUSH/SKIN DOORS-POLISHED/ENAMEL PAINTED: STAINLESS/ BRASS FINISHED HARDWARE FITTINGS FOR MAIN DOOR & ALUMINIUM POWDER COATED HARDWARE FITTING AND LOCKS OF BRANDED MAKE. DOOR FRAMES AND WINDOW PANELS OF SEASONED HARDWOOD/ ALUMINIUM/ UPVC SECTIONS. ALL HARDWARE IN POWDER COATED ALUMINIUM. SIZE AND SECTION AS PER DESIGN OF THE ARCHITECT
GLASS WORKNA
ELECTRIC FITTINGSPROVISION FOR ADEQUATE LIGHT & POWER POINTS. TELEPHONE & T.V. OUTLETS IN DRAWING, DINING AND ALL BEDROOM; MOULDED MODULAR PLASTIC SWITCHES & PROTECTIVE MCB'S
CONDUCTING AND WIRING DETAILSALL ELECTRICAL WIRING IN CONCEALED CONDUITS
CUPBOARD DETAILSNA
WATER STORAGEUNDERGROUND WATER TANK WITH PUMP HOUSE FOR SUPPLY OF WATER. DUAL PLUMBING PROVISION FOR ALL TOILETS
LIFT DETAILSLIFTS TO BE PROVIDED FOR ACCESS TO ALL FLOORS
EXTERNAL GLAZINGSREFER SER NO 13.1
WINDOWS/GLAZINGSUPVC AND ALUMINIUM FIXED AND OPENABLE WINDOWS
DOORSREFER SER NO 14.1 AND 14.2
MAIN DOORSFLUSH DOORS - POLISHED/ENAMEL PAINTED; STAINLESS STEEL/ BRASS FINISHED HARDWARE FITTINGS FOR MAIN DOOR & ALUMINIUM POWDER COATED HARDWARE FITTING AND LOCKS OF BRANDED MAKES. DOOR FRAMES OF SEASONED HARDWOOD
INTERNAL DOORSFLUSH DOORS - POLISHED/ENAMEL PAINTED. DOOR FRAMES OF SEASONED HARDWOOD
AIR CONDITIONINGSPLIT UNITS IN LIVING ROOM, DINING & ALL BED ROOMS
ELECTRICAL FITTINGSPROVISION FOR ADEQUATE LIGHT & POWER POINTS. TELEPHONE & T.V. OUTLETS IN DRAWING, DINING AND ALL BEDROOM; MOULDED MODULAR PLASTIC SWITCHES & PROTECTIVE MCB'S
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYPROVISION OF WI-FI AND BROAD BAND FACILITY PROVISION FOR OPTICAL FIBRE NETWORK; VIDEO SURVEILLANCE SYSTEM, PERIMETER SECURITY AND ENTRANCE LOBBY SECURITY WITH CCTV CAMERAS; FIRE PREVENTION, SUPPRESSION, DETECTION & ALARM SYSTEM AS PER FIRE NORMS
EXTERNAL FINISHING/COLOUR SCHEMEAPPROPRIATE FINISH OF TEXTURE PAINT OF EXTERIOR GRADE WATER PROOF PAINT
INTERNAL FINISHINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR ON INTERIOR WALLS AND ON CEILINGS

Unit-wise Specifications

TOILET
FLOORCERAMIC TILES
WALLSGLAZED TILES UPTO 2400MM AND OIL BOUND DISTEMPER OF APPROPRIATE COLOUR ABOVE IT UPTO CEILING
CEILINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR
COUNTERSCOUNTERS IN PRE-POLISHED GRANITE/ MARBLE STONE
SANITARY WARE/CP FITTINGSPREMIUM SANITARY FIXTURES, PREMIUM CHROME PLATED FITTINGS
FIXTURESPREMIUM CHROME PLATED FITTINGS
KITCHEN
FLOORVITRIFIED TILES IN KITCHEN
WALLS600MM HEIGHT ABOVE KITCHEN COUNTER SLAB IN APPROPRIATE COLOUR & PAINT
CEILINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR ON CEILINGS
COUNTERSALL KITCHEN COUNTERS IN PRE-POLISHED GRANITE/ MARBLE STONE
FIXTURESELECTRICAL POINTS FOR KITCHEN CHIMNEY & HOB, KITCHEN WILL BE PROVIDED WITH MODULAR CABINETS OF APPROPRIATE FINISH
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORANTI-SKID CERAMIC FLOORING
WALLS & CEILINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR
RAILINGSM S RAILING
FIXTURESNA
BED ROOMS
FLOORVITRIFIED TILES FLOORING
WALLSOIL BOUND DISTEMPER OF APPROPRIATE COLOUR ON INTERIOR WALLS
CEILINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR ON CEILINGS
WARDROBESNA
MASTER TOILET
FLOORCERAMIC TILES
WALLSGLAZED TILES UPTO 2400MM AND OIL BOUND DISTEMPER OF APPROPRIATE COLOUR ABOVE IT UPTO CEILING
CEILINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR ON CEILINGS
COUNTERSCOUNTERS IN PRE-POLISHED GRANITE/ MARBLE STONE
SANITARY WARE/CP FITTINGSPREMIUM SANITARY FIXTURES, PREMIUM CHROME PLATED FITTINGS
FITTING/FIXTURESPREMIUM CHROME PLATED FITTINGS
MASTER BEDROOM/DRESSROOM
FLOORWOODEN FLOORING
WALLSOIL BOUND DISTEMPER OF APPROPRIATE COLOUR
CEILINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILES FLOORING
WALLSOIL BOUND DISTEMPER OF APPROPRIATE COLOUR
CEILINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORTILES
WALLS & CEILINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR
TOILETGLAZED TILES UPTO 2400MM AND OIL BOUND DISTEMPER OF APPROPRIATE COLOUR ABOVE IT UPTO CEILING.CERAMIC TILES FLOORING
BALCONYANTI-SKID CERAMIC FLOORING

Fee Details

Payment 1
amount:2187229
cheque no:237180
draft date:14-07-2017
payable to:HRERA Gurugram
payee bank:KOTAK MAHINDRA BANK
Payment 2
amount:458621
cheque no:244562
draft date:05-03-2021
payable to:HRERA Gurugram
payee bank:KOTAK MAHINDRA BANK