NEWActive

SS CAMASA

GURUGRAM, MANESAR
image
image
image
image
image
image
image
image
image
image
image
image
image
21-08-2024
Launch Date
NEW
Type
2031-09-30
Completion Date

Overview

Launch Date

21-08-2024

Completion Date

2031-09-30

Configurations

4 BHK

Sizes

2530 - 2530 sq.ft.

Project Size

4 Buildings - 512 units

Total Floors

32

RERA ID

RERA-GRG-1719-2024

Basic Details

Project NameSS CAMASA
Project IDRERA-GRG-1719-2024
Project TypeNEW
Applicant TypeCompany
Submission Date21-08-2024 04:17:02 PM
Builder NameNORTH STAR TOWERS PRIVATE LIMITED
CINU74899HR1995PTC068947
PANXXXX976P
Emailssgroup.gurgaon@gmail.com
Websitehttps://www.ssgroup-india.com/
Phone (Mobile)9811092713
Phone (Landline)01244335100
Registered AddressPLOT NO. 77, SS HOUSE, SECTOR 44, GURUGRAM (HARYANA)-122003
Project AddressSECTOR 90, VILLAGE BADHA & NAWADA FATEHPUR
DistrictGURUGRAM
TehsilMANESAR

Location

SS Camasa Location Map
SS Camasa Location Map

Layout

Loading
SS Camasa Masterplan
SS Camasa Masterplan

Floor Plan

Loading
Configuration
Super Area
Unit Details
Carpet Area
1485 sq.ft
Built Up Area
N/A
Carpet Efficiency
59%
Built Up Efficiency
N/A
Parkings
N/A

Brochures

Loading

Walkthrough

Loading

Bank Details

Bank NameSTATE BANK OF INDIA, SME BRANCH, NARAINA IND. AREA, PH-I, 1ST FLOOR, 59 COMMUNITY CENTRE, NEW DELHI
Account Number43276256630
IFSC CodeSBIN0003786
MICR Code110002206
Branch Code03786

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Ashok Singh Jaunapuria and Sushil Singh Jaunapuria, B-4-43 2nd Floor Safdarjung Enclave New Delhi-110029
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Uploaded

Development Details

Land Area5.0456 (Acre)
Proposed FAR3.48
Permissible FAR3.62
Total Licensed Land6.4166 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.739
CONSTRUCTION OF ROADS1.745
PAVEMENTS0
PARKS AND PLAYGROUNDS1.80
GREEN BELTS0
VEHICLE PARKINGS0.312
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
COMMERCIAL0.35
EWS0.10
Total5.046

Cost Details

Land Cost1401.08 Lakhs
Other Cost19889.31 Lakhs
Estimated Project Cost63826.68 Lakhs
Estimated Infrastructure Cost8180.17 Lakhs
Estimated Apartment Construction Cost34356.12 Lakhs

Documents

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 17-08-2024

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 17-08-2024

SITE PLAN-PHASING PLAN

Uploaded on: 21-08-2024

BALANCE SHEET 31.3.2021

Uploaded on: 21-08-2024

BALANCE SHEET 31.03.2022

Uploaded on: 21-08-2024

BALANCE SHEET 31.03.2023

Uploaded on: 21-08-2024

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 21-08-2024

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 21-08-2024

ELEVATION B & D

Uploaded on: 10-02-2025

COURTYARD AREA DETAIL

Uploaded on: 10-02-2025

BASEMENT PLAN-02

Uploaded on: 10-02-2025

ROAD ACCESS APPROVAL LETTER

Uploaded on: 10-02-2025

DEMARCATION PLAN

Uploaded on: 10-02-2025

SITE PLAN_GREEN AREA CALCULATION

Uploaded on: 10-02-2025

TYPICAL FLOOR PLAN 01 TO 32 (EXCEPT 19 & 28) _T-1 TO T-4

Uploaded on: 10-02-2025

WATER SUPPLY SCHEMATIC DIAGRAM

Uploaded on: 10-02-2025

NOC - AAI - AIRPORT HEIGHT

Uploaded on: 10-02-2025

AFFIDAVIT - TREE POWER NATURAL CONSERVATION

Uploaded on: 10-02-2025

SECOND FLOOR AREA PLAN

Uploaded on: 10-02-2025

19TH & 28TH FLOOR PLAN

Uploaded on: 10-02-2025

ASSURANCE - SEWERAGE CONNECTION

Uploaded on: 10-02-2025

REVISED ZONING PLAN

Uploaded on: 10-02-2025

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 10-02-2025

SECTION 1 & 2

Uploaded on: 10-02-2025

ASSURANCE - DRINKING WATER

Uploaded on: 10-02-2025

ELVATION A & B _COMMUNITY

Uploaded on: 10-02-2025

STILT FLOOR PLAN_EWS

Uploaded on: 10-02-2025

TERRACE FLOOR PLAN_EWS

Uploaded on: 10-02-2025

STILT FLOOR PLAN_T-3

Uploaded on: 10-02-2025

PHASING PLAN - PLAN APPROVAL

Uploaded on: 10-02-2025

STILT FLOOR PLAN_T-1

Uploaded on: 10-02-2025

AK SIZRA

Uploaded on: 10-02-2025

TSR CAMASA

Uploaded on: 10-02-2025

ZONING PLAN

Uploaded on: 10-02-2025

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 10-02-2025

ASSURANCE - ELECTRIC LOAD

Uploaded on: 10-02-2025

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 10-02-2025

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 10-02-2025

PHASING PLAN - APPROVAL LETTER

Uploaded on: 10-02-2025

ELEVATION A & C

Uploaded on: 10-02-2025

BR-III

Uploaded on: 10-02-2025

DRAFT AGREEMENT FOR SALE - SS CAMASA

Uploaded on: 10-02-2025

SITE PLAN - LAYOUT PLAN

Uploaded on: 10-02-2025

ASSURANCE - CONSTRUCTION WATER

Uploaded on: 10-02-2025

COLLABORATION

Uploaded on: 10-02-2025

FIRST FLOOR AREA PLAN

Uploaded on: 10-02-2025

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 10-02-2025

TYPICAL FLOOR PLAN_EWS

Uploaded on: 10-02-2025

DRAFT ALLOTMENT LETTER - SS CAMASA

Uploaded on: 10-02-2025

ELVATION C & D _COMMUNITY

Uploaded on: 10-02-2025

GROUND FLOOR PLAN

Uploaded on: 10-02-2025

SECTION _COMMUNITY

Uploaded on: 10-02-2025

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 10-02-2025

TERRACE PLAN

Uploaded on: 10-02-2025

SECTION_EWS

Uploaded on: 10-02-2025

STILT FLOOR PLAN_T-4

Uploaded on: 10-02-2025

TERRACE PLAN 1

Uploaded on: 10-02-2025

BASEMENT PLAN-01

Uploaded on: 10-02-2025

DRAFT APPLICATION FORM- SS CAMASA

Uploaded on: 10-02-2025

LC-IV

Uploaded on: 10-02-2025

LOI

Uploaded on: 10-02-2025

PROJECT REPORT OF SS CAMASA

Uploaded on: 10-02-2025

STILT FLOOR PLAN_T-2

Uploaded on: 10-02-2025

Statutory Approvals

BUILDING PLANDate: 12-08-2024Status: ALREADY BEEN OBTAINED
ZONING PLANDate: 05-06-2024Status: ALREADY BEEN OBTAINED
LICENSE FROM TOWN & COUNTRY PLANNING HARYANADate: 19-12-2023Status: ALREADY BEEN OBTAINED
PHASING PLAN APPROVALDate: 17-07-2024Status: ALREADY BEEN OBTAINED
FIRE SCHEME APPROVALDate: 17-10-2024Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: No
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED
UNDERGROUND PARKINGAS PER PROJECT REPORT
ELECTRIFICATION COST UPTO PROJECT SITEAS PER PROJECT REPORT

NOC

ROADSProvider: GMDAApproval Status: Pending
WATER SUPPLYProvider: GMDAApproval Status: Pending
ELECTRICITYProvider: DHVBNApproval Status: Pending
SEWAGE DISPOSALProvider: GMDAApproval Status: Pending
STORM WATER DRAINAGEProvider: GMDAApproval Status: Pending

Project Team

Authorized Representative

BIJIMOL MANI
Name
BIJIMOL MANI
PAN
XXXX905E
Email
bijimol@ssgroup-india.com
Mobile
9811699466
Landline
01244335100
Address
B-51 Second Floor Mayfield Garden Sector-50 Nirvana Country Gurugram Haryana

Managing Director/CEO

ASHOK SINGH JAUNAPURIA
Name
ASHOK SINGH JAUNAPURIA
PAN
XXXX236R
Email
ashok.singh@ssgroup-india.com
Mobile
9873434444
Landline
01244335100
Address
B-4-43 2nd Floor Safdarjung Enclave New Delhi-110029

Directors

SUSHIL SINGH JAUNAPURIA
Name
SUSHIL SINGH JAUNAPURIA
PAN
XXXX686A
Email
sushil@ssgroup-india.com
Mobile
9873333123
Landline
01244335100
Address
B-4-43 2nd Floor Safdarjung Enclave New Delhi-110029
DAYAWATI
Name
DAYAWATI
PAN
XXXX857C
Email
ssgroup.gurgaon@gmail.com
Mobile
9873434444
Landline
01244335100
Address
B-4-43 2nd Floor Safdarjung Enclave New Delhi-110029

Contact Details

Project ContactEmail: ssgroup.gurgaon@gmail.comMobile: 9811454047Landline: 01244335100
Project Contact PersonName: VIJAY PAL SINGHEmail: vijaypal@ssgroup-india.comMobile: 9811454047Landline: 01244335100

Land Details

Land Area5.0456 (Acre)
Proposed FAR3.48
Permissible FAR3.62
Total Licensed Land6.4166 (Acre)

Land Usage

Land Cost1401.08 Lakhs
Other Cost19889.31 Lakhs
Estimated Project Cost63826.68 Lakhs
Estimated Infrastructure Cost8180.17 Lakhs
Estimated Apartment Construction Cost34356.12 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres---0
Electricity Supply System---36.11
Electrification Cost---0
Other---0
Parking Cost---41.13
Parks and Playgrounds---57.77
Roads & Pavements---10.11
Security and Fire Fighting----
Sewerage treatment & garbage disposal---111.22
Shopping area---0
Storm Water Drainage---14.44
Street Lighting---14.44
Water Supply System---28.89
2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System36.1136.1136.1136.11
Electrification Cost----
Other0000
Parking Cost123.38205.63205.63205.63
Parks and Playgrounds57.7757.7757.7757.77
Roads & Pavements10.1110.1110.1110.11
Security and Fire Fighting----
Sewerage treatment & garbage disposal111.22111.22111.22111.22
Shopping area0000
Storm Water Drainage14.4414.4414.4414.44
Street Lighting14.4414.4414.4414.44
Water Supply System28.8928.8928.8928.89
2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System36.1136.1136.1136.11
Electrification Cost----
Other0000
Parking Cost205.63205.63205.63205.63
Parks and Playgrounds57.7757.7728.8928.89
Roads & Pavements10.1110.1110.1110.11
Security and Fire Fighting7.227.227.227.22
Sewerage treatment & garbage disposal111.22111.22111.22111.22
Shopping area0000
Storm Water Drainage14.4414.4414.4414.44
Street Lighting14.4414.447.227.22
Water Supply System28.8928.8928.8928.89
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System361.09000
Electrification Cost----
Other0000
Parking Cost205.63205.63205.63205.63
Parks and Playgrounds11.5511.5511.5511.55
Roads & Pavements10.1110.1110.1150.55
Security and Fire Fighting7.227.227.227.22
Sewerage treatment & garbage disposal111.22000
Shopping area0000
Storm Water Drainage14.44000
Street Lighting2.892.892.892.89
Water Supply System28.89000
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System14.44000
Electrification Cost----
Other7.227.2200
Parking Cost205.63205.63205.63205.63
Parks and Playgrounds11.5511.5511.5511.55
Roads & Pavements50.5550.5550.5550.55
Security and Fire Fighting----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Lighting2.892.892.892.89
Water Supply System0000
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres000-
Electricity Supply System0021.67-
Electrification Cost----
Other000-
Parking Cost205.63205.63452.38-
Parks and Playgrounds11.5511.550-
Roads & Pavements50.5550.5530.33-
Security and Fire Fighting----
Sewerage treatment & garbage disposal000-
Shopping area000-
Storm Water Drainage000-
Street Lighting2.892.89--
Water Supply System000-

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILE
WALL FINISHING DETAILSOIL BOUND DISTEMPER
KITCHEN DETAILSSTONE COUNTER WITH SINGLE LEVER CP FITTINGS AND SINK
BATHROOM FITTINGSSTONE COUNTER TOP WITH SINGLE LEVER CP FITTINGS ,WASH BASIN, WALL HUNG WC
WOOD WORK ETCSHALL NOT BE PROVIDED BY PROMOTER
DOORS AND WINDOS FRAMESEXTERNAL- UPVC FRAMES WITH SLIDING GLASS SHUTTERS INTERNAL - MARANDI WOOD FRAMES
GLASS WORKSHALL NOT BE PROVIDED BY PROMOTER
ELECTRIC FITTINGSISI MARKED FITTINGS
CONDUCTING AND WIRING DETAILSPVC CONDUITING WITH ISI MARKED WIRING
CUPBOARD DETAILSSHALL NOT BE PROVIDED BY PROMOTER
WATER STORAGECOMMON TANK
LIFT DETAILSEACH TOWER HAS BEEN PROVIDED 03 NOS PASSANGER LIFTS AND 01 SERVICE LIFT
EXTERNAL GLAZINGSUPVC FRAMES WITH SLIDING GLASS SHUTTERS
WINDOWS/GLAZINGSUPVC FRAMES WITH SLIDING GLASS SHUTTERS
DOORSMARANDI WOOD DOOR FRAME WITH ENAMEL PAINT SHUTTER
MAIN DOORSMARANDI WOOD DOOR FRAME WITH ENAMEL PAINT SHUTTER
INTERNAL DOORSMARANDI WOOD DOOR FRAME WITH ENAMEL PAINT SHUTTER
AIR CONDITIONINGSPLIT AIR-CONDITIONERS IN LIVING ROOM AND BED ROOMS
ELECTRICAL FITTINGSISI MARKED FITTINGS
CNG PIPE LINENOT APPLICABLE
PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
EXTERNAL FINISHING/COLOUR SCHEMETEXTURED PAINT
INTERNAL FINISHINGOIL BOUND DISTEMPER

Unit-wise Specifications

TOILET
FLOORANTISKID TILES
WALLSCERAMIC TILES
CEILINGOIL BOUND DISTEMPER
COUNTERSSTONE COUNTER
SANITARY WARE/CP FITTINGSSINGLE LEVER CP FITTINGS
FIXTURESWASH BASIN, WALL HUNG WC
KITCHEN
FLOORANTISKID TILES
WALLSOIL BOUND DISTEMPER / CERAMIC TILE
CEILINGOIL BOUND DISTEMPER
COUNTERSSTONE COUNTER
FIXTURESSINGLE LEVER CP FITTINGS WITH SINK
KITCHEN APPLIANCESSHALL NOT BE PROVIDED BY PROMOTER
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORVITRIFIED TILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
WARDROBESWARDROBES SHALL NOT BE PROVIDED BY PROMOTER
MASTER TOILET
FLOORANTISKID TILES
WALLSCERAMIC TILE
CEILINGOIL BOUND DISTEMPER
COUNTERSSTONE COUNTER
SANITARY WARE/CP FITTINGSSINGLE LEVER CP FITTINGS
FITTING/FIXTURESWASH BASIN, WALL HUNG WC
MASTER BEDROOM/DRESSROOM
FLOORVITRIFIED TILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
MODULAR WARDROBESMODULAR WARDROBES SHALL NOT BE PROVIDED BY PROMOTER
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORANTI SKID TILES
WALLS & CEILINGOIL BOUND DISTEMPER
TOILETTILES IN FLOORING / CERAMIC TILES ON WALLS
BALCONYANTI SKID TILES

Fee Details

Payment 1
amount:3954904
cheque no:52024081700913238
draft date:17-08-2024
payable to:HRERA Gurugram
payee bank:KOTAK MAHINDRA BANK