Emaar Serenity Hills is a large residential development by Emaar India in Sector 86, New Gurgaon, and Phase 1 (which covers the first two phases of the launch) is its current release. The defining feature is space: it is a low-density, low-rise-feel community built around a large central green, by one of the most recognised global developer names operating in Gurugram. For a buyer, the proposition is a genuinely green, master-planned address in New Gurgaon at a more accessible price point than the central corridors. Emaar has announced an investment of around ₹1,600 crore in Serenity Hills, with roughly 1,000 apartments priced in the ₹3 to ₹5.7 crore range, which gives a clear sense of the scale and segment. At the heart of the layout is a large internal green of around 20 acres, a central landscaped expanse that the towers are arranged around, which is what gives the project its low-density, open character despite the high-rise format.
Registered with HARERA under RERA-GRG-2052-2025, the current phase spans about 15.21 acres with 7 towers rising to 39 floors and 997 residences, at a low density of about 66 units per acre. The configurations are 3 and 4 BHK homes with super areas from 1,800 sq ft to 2,800 sq ft and a carpet efficiency of around 53%. An entry 3 BHK works out to around ₹3.15 crore on base price, at a launch rate of ₹17,500 per sq ft.
In the interest of full transparency, there is one site characteristic worth knowing. A designated gas pipeline corridor runs across the development, and as a result the basements of the two current phases are not interconnected.
Why New Gurgaon
Sector 86 sits in New Gurgaon, a fast-developing belt with connectivity to NH-48 (the Delhi-Jaipur Expressway), the Dwarka Expressway network and the wider Gurgaon road grid. The area has drawn a cluster of branded residential launches on the back of improving infrastructure and its position between the established Gurgaon core and the newer western corridors. For a buyer, the case is a large, green, master-planned community at a more accessible entry point than central Gurgaon, in a pocket where civic and road infrastructure is actively maturing.
Specifications at a Glance
BSP only. GST, PLC, Parking, IFMS could be add ons.
Get Full Cost BreakupUploaded on: 19-09-2025
Uploaded on: 31-10-2025
Uploaded on: 31-10-2025
Uploaded on: 06-11-2025







| Particulars | Expenditure (in Lakhs) |
|---|---|
| Other | 0 |
| Shopping area | 0 |
| Roads & Pavements | 0 |
| Water Supply System | 0 |
| Storm Water Drainage | 0 |
| Parks and Playgrounds | 0 |
| Electricity Supply System | 0 |
| Clubhouse/community centres | 0 |
| Sewerage treatment & garbage disposal | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | - | - | - | 0 |
| ELECTRICAL SUB STATION | - | - | - | 17 |
| ELECTRIFICATION COST | - | - | - | 10 |
| Electricity Supply System | - | - | - | 0 |
| Other | - | - | - | 0 |
| PARKING | - | - | - | - |
| Parks and Playgrounds | - | - | - | 0 |
| RAIN WATER HARVESTING | - | - | - | 3 |
| Roads & Pavements | - | - | - | 0 |
| SECURITY AND FIRE FIGHTING | - | - | - | - |
| STP | - | - | - | 9 |
| STREET LIGHTING | - | - | - | - |
| Sewerage treatment & garbage disposal | - | - | - | 0 |
| Shopping area | - | - | - | 0 |
| Storm Water Drainage | - | - | - | 0 |
| UNDERGROUND WATER TANK | - | - | - | 4 |
| Water Supply System | - | - | - | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| ELECTRICAL SUB STATION | 33 | 10 | 17 | 17 |
| ELECTRIFICATION COST | 19 | 6 | 10 | 10 |
| Electricity Supply System | 0 | 0 | 0 | 0 |
| Other | 0 | 0 | 0 | 0 |
| PARKING | - | - | - | - |
| Parks and Playgrounds | 0 | 0 | 0 | 0 |
| RAIN WATER HARVESTING | 5 | 2 | 4 | 5 |
| Roads & Pavements | 0 | 0 | 18 | 36 |
| SECURITY AND FIRE FIGHTING | - | - | - | - |
| STP | 17 | 5 | 12 | 17 |
| STREET LIGHTING | - | - | - | - |
| Sewerage treatment & garbage disposal | 0 | 0 | 0 | 10 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 0 | 6 |
| UNDERGROUND WATER TANK | 9 | 3 | 6 | 9 |
| Water Supply System | 0 | 0 | 0 | 56 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| ELECTRICAL SUB STATION | 17 | 17 | 17 | 17 |
| ELECTRIFICATION COST | 10 | 10 | 10 | 10 |
| Electricity Supply System | 0 | 21 | 8 | 4 |
| Other | 0 | 0 | 0 | 0 |
| PARKING | - | 64 | 26 | 13 |
| Parks and Playgrounds | 0 | 21 | 8 | 4 |
| RAIN WATER HARVESTING | 3 | 3 | 3 | 3 |
| Roads & Pavements | 11 | 25 | 36 | 18 |
| SECURITY AND FIRE FIGHTING | - | 16 | 6 | 3 |
| STP | 9 | 9 | 9 | 9 |
| STREET LIGHTING | - | 19 | 8 | 4 |
| Sewerage treatment & garbage disposal | 2 | 5 | 7 | 3 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 1 | 3 | 4 | 2 |
| UNDERGROUND WATER TANK | 4 | 4 | 4 | 4 |
| Water Supply System | 11 | 26 | 37 | 19 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| ELECTRICAL SUB STATION | 17 | 17 | 17 | 17 |
| ELECTRIFICATION COST | 10 | 10 | 10 | 10 |
| Electricity Supply System | 4 | 4 | 4 | 4 |
| Other | 0 | 0 | 0 | 0 |
| PARKING | 13 | 13 | 13 | 13 |
| Parks and Playgrounds | 4 | 4 | 4 | 4 |
| RAIN WATER HARVESTING | 3 | 3 | 7 | 5 |
| Roads & Pavements | 18 | 18 | 18 | 18 |
| SECURITY AND FIRE FIGHTING | 3 | 3 | 3 | 3 |
| STP | 9 | 9 | 22 | 17 |
| STREET LIGHTING | 4 | 4 | 4 | 4 |
| Sewerage treatment & garbage disposal | 3 | 3 | 3 | 3 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 2 | 2 | 2 | 2 |
| UNDERGROUND WATER TANK | 4 | 4 | 12 | 9 |
| Water Supply System | 19 | 19 | 19 | 19 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| ELECTRICAL SUB STATION | 17 | 17 | 17 | 17 |
| ELECTRIFICATION COST | 10 | 10 | 10 | 10 |
| Electricity Supply System | 4 | 11 | 8 | 3 |
| Other | 0 | 0 | 0 | 0 |
| PARKING | 13 | 33 | 26 | 10 |
| Parks and Playgrounds | 4 | 11 | 8 | 3 |
| RAIN WATER HARVESTING | 2 | 2 | 3 | - |
| Roads & Pavements | 18 | 46 | 36 | 14 |
| SECURITY AND FIRE FIGHTING | 3 | 8 | 6 | 3 |
| STP | 7 | 5 | 9 | - |
| STREET LIGHTING | 4 | 10 | 8 | 3 |
| Sewerage treatment & garbage disposal | 3 | 9 | 7 | 3 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 2 | 6 | 4 | 2 |
| UNDERGROUND WATER TANK | 4 | 3 | 4 | - |
| Water Supply System | 19 | 48 | 37 | 15 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | - | - |
| ELECTRICAL SUB STATION | 17 | 23 | - | - |
| ELECTRIFICATION COST | 10 | 13 | - | - |
| Electricity Supply System | 2 | 4 | - | - |
| Other | 0 | 0 | - | - |
| PARKING | 8 | 13 | - | - |
| Parks and Playgrounds | 3 | 4 | - | - |
| RAIN WATER HARVESTING | - | - | - | - |
| Roads & Pavements | 11 | 18 | - | - |
| SECURITY AND FIRE FIGHTING | 2 | 3 | - | - |
| STP | - | - | - | - |
| STREET LIGHTING | 2 | 4 | - | - |
| Sewerage treatment & garbage disposal | 2 | 3 | - | - |
| Shopping area | 0 | 0 | - | - |
| Storm Water Drainage | 1 | 2 | - | - |
| UNDERGROUND WATER TANK | - | - | - | - |
| Water Supply System | 11 | 19 | - | - |
Sector 86, Manesar, in New Gurgaon, with connectivity to NH-48 and the Dwarka Expressway network.
Yes, under HARERA registration RERA-GRG-2052-2025, received 25 September 2025. We recommend verifying it directly on the HARERA portal.
It is a phased development on a total licensed parcel of about 25.90 acres. The current release covers Phase 1 and Phase 2 (about 15.21 acres), with further phases planned on the remaining land.
Yes. The layout is built around a large internal green of roughly 20 acres, which the towers are arranged around, giving the community its low-density, open character.
Yes. A designated gas pipeline corridor runs across the site, and as a result the basements of the two current phases are not interconnected. This is a layout consequence of the pipeline easement; we can explain how it affects a specific tower or unit on request.
Developed by
17 Projects
EXECUTIVE SUMMARY Emaar India Limited is a wholly-owned subsidiary of Dubai-based Emaar Properties PJSC, one of the world's largest real estate developers and the company behind iconic landmarks including Burj Khalifa an…
Know More about Emaar