NEWActive

SS CENDANA AND SS KIAVASA

GURUGRAM, MANESAR
08-06-2023
Launch Date
NEW
Type
2029-03-31
Completion Date

Overview

Launch Date

08-06-2023

Completion Date

2029-03-31

RERA ID

RERA-GRG-1347-2023

Basic Details

Project NameSS CENDANA AND SS KIAVASA
Project IDRERA-GRG-1347-2023
Project TypeNEW
Applicant TypeCompany
Submission Date08-06-2023 03:06:37 PM
Builder NameA & D ESTATES PRIVATE LIMITED
CINU45201HR2005PTC066980
PANXXXX663G
Emailssgroup.gurgaon@gmail.com
WebsiteHttp://www.ssgroup-india.com
Phone (Mobile)9811699466
Phone (Landline)01244335100
Registered AddressPLOT NO. 77, SS HOUSE, SECTOR 44, GURUGRAM- 122003
Project AddressVILLAGE SIHI, SECTOR 83
DistrictGURUGRAM
TehsilMANESAR

Location

Walkthrough

Loading

Bank Details

Bank NameKOTAK MAHINDRA BANK, 5CII,MITTAL COURT, 224, NARIMAN POINT, MUMBAI-400021
Account Number9047209742
IFSC CodeKKBK0000958
MICR Code400485002
Branch Code000958

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)ASHOK SINGHJAUNAPURIA, Address: B-4-43 Safdarjung Enclave, New Delhi - 110029
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Attached

Development Details

Land Area12.61175 (Acre)
Proposed FAR349
Permissible FAR350
Total Licensed Land12.61175 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS8004
CONSTRUCTION OF ROADS18747
PAVEMENTS0
PARKS AND PLAYGROUNDS8151
GREEN BELTS2515
VEHICLE PARKINGS1710
ELECTRICITY SUB-STATION614
CLUB HOUSE1137
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
OPEN3513
SHOPPING235
SCHOOL2832
AREA3581
Total51039

Cost Details

Land Cost2815 Lakhs
Other Cost30947.34 Lakhs
Estimated Project Cost104312.71 Lakhs
Estimated Infrastructure Cost18717.48 Lakhs
Estimated Apartment Construction Cost51832.89 Lakhs

Documents

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 05-06-2023

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 03-06-2023

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 03-06-2023

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 08-06-2023

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 08-06-2023

CA CERTIFICATE - EXPENDITURE

Uploaded on: 05-02-2024

ELEVATION AND SECTION -TOWER 2-4

Uploaded on: 05-02-2024

TYP FLOOR PLAN (3 TO 15, 17 TO 23, 25 TO 31 & 33 TO 36)_TYPE-A (T-1)

Uploaded on: 05-02-2024

GR FLR PLAN & AREA DETAILS TYPE-C T-5

Uploaded on: 05-02-2024

NOC - AIRPORT HEIGHT

Uploaded on: 05-02-2024

APPROVAL - MINING - CENDANA

Uploaded on: 05-02-2024

FLOOR PLAN (16, 24 & 32)_TYPE-A (T-1)

Uploaded on: 05-02-2024

GR FLR & AREA DETAILS TYPE-D T-8 TO 11

Uploaded on: 05-02-2024

GR, FIRST FLR PLAN AND AREA DETAIL TYPE-B, T-6

Uploaded on: 05-02-2024

TYP FLR & REFUGE TYPE-B T-6

Uploaded on: 05-02-2024

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 05-02-2024

ELEVATION -C D (TYPE -A-TOEWR-1) PART2

Uploaded on: 05-02-2024

GR FLR PLAN & AREA DETAILS TYPE-D T-7

Uploaded on: 05-02-2024

SUPER IMPOSED DEMARCATION

Uploaded on: 05-02-2024

GR FLR PLAN AND AREA DETAILS -TOWER -2-4

Uploaded on: 05-02-2024

PRIMARY SCHOOL DETAILS

Uploaded on: 05-02-2024

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 05-02-2024

TOILET & WATER SUPPLY SYSTEM - TOWER 2-11

Uploaded on: 05-02-2024

WATER SUPPLY SYSTEM DIAGRAM_(T-2 TO 6)

Uploaded on: 05-02-2024

ELEVATION SECTION TERRACE & MUMTY TYPE D TOWER-8-11

Uploaded on: 05-02-2024

ELEVATION, MUMTY & SECTION TYPE-B, T-6

Uploaded on: 05-02-2024

TYP AND REFUGE AREA TYPE-D T-8-11

Uploaded on: 05-02-2024

AFFIDAVIT -4(2)(I)(D)

Uploaded on: 05-02-2024

BASEMENT (1)

Uploaded on: 05-02-2024

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 05-02-2024

CA CERTIFICATE - CAPITAL

Uploaded on: 05-02-2024

COMMUNITY BUILDING

Uploaded on: 05-02-2024

NURSERY SCHOOL DETAILS

Uploaded on: 05-02-2024

CLUB - GR AND FIRST FLR

Uploaded on: 05-02-2024

DEMARCATION PLAN

Uploaded on: 05-02-2024

EC-SECTOR-83

Uploaded on: 05-02-2024

ELECTION, SECTION & TERRACE -TYPE-C T-5

Uploaded on: 05-02-2024

ELEVATION -A B (TYPE -A-TOWER -1) PART1

Uploaded on: 05-02-2024

ELEVATION AND SECTION PLAN -TYPE-E TOWER-12

Uploaded on: 05-02-2024

FLR AND ELVATION, SECTION - CONVENIENT SHOPPING

Uploaded on: 05-02-2024

GR FIRST FLR PLAN - TYPE-E TOWER-12

Uploaded on: 05-02-2024

NOC - FOREST - 12.611

Uploaded on: 05-02-2024

REFUGEE AND TERRACE - TOWER-2-4

Uploaded on: 05-02-2024

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 05-02-2024

WATER SUPPLY AND TOILET DETAILS - TOWER-1

Uploaded on: 05-02-2024

SECTION-1_TYPE-A (T-1)

Uploaded on: 05-02-2024

SECTION-2_TYPE-A (T-1)

Uploaded on: 05-02-2024

TERRACE AND MUMTY FLR PLAN - TOWER-12

Uploaded on: 05-02-2024

TERRACE, ELEVATION & MUMTY TYPE-D, T-7

Uploaded on: 05-02-2024

TYP & REFUGE AREA DETAILS TYPE-C T-5

Uploaded on: 05-02-2024

TYP FLOOR PLAN (1 TO 18, 20 TO 28 & 30 TO 32) _TYPE-B (T-2 TO 4)

Uploaded on: 05-02-2024

TYP FLR PLAN TYPE-E TOWER-12

Uploaded on: 05-02-2024

TYP FLR, REFUGE AREA, FIRST FLOOR PLAN TYPE-D, T-7

Uploaded on: 05-02-2024

UNDERTAKING - BANK - KOTAK HRERA

Uploaded on: 05-02-2024

WATER SUPPLY AND TOILET DETAILS -EWS TOWER-12

Uploaded on: 05-02-2024

ZONING PLAN

Uploaded on: 05-02-2024

Statutory Approvals

BUILDING PLAN APPROVALDate: 05-06-2023Status: ALREADY BEEN OBTAINED
LICENSEDate: 01-02-2023Status: ALREADY BEEN OBTAINED
ZONING PLANDate: 06-02-2023Status: ALREADY BEEN OBTAINED
DEMARCATION PLANDate: 06-02-2023Status: ALREADY BEEN OBTAINED
ELECTRICITY LOAD ASSURANCEDate: 03-04-2023Status: ALREADY BEEN OBTAINED
WATER SUPPLY ASSURANCEDate: 24-03-2023Status: ALREADY BEEN OBTAINED
STORM WATER CONNECTION ASSURANCEDate: 24-03-2023Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 18-11-2022Status: ALREADY BEEN OBTAINED
SEWERAGE CONNECTION ASSURANCEDate: 24-03-2023Status: ALREADY BEEN OBTAINED
LAYOUT PLANDate: 05-06-2023Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCEDate: 13-01-2023Status: APPLIED FOR BUT YET TO RECEIVE
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED
PARKINGAS PER PROJECT REPORT
ELECTRIFICATION COSTAS PER PROJECT REPORT

NOC

ROADSProvider: GMDAApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

BIJIMOL MANI
Name
BIJIMOL MANI
PAN
XXXX661G
Email
bijimol@ssgroup-india.com
Mobile
9811699466
Landline
01244335100
Address
N-3 4 SECOND FLOOR POLICE COLONY ANDREWSGANJ SOUTHDELHI -110049

Managing Director/CEO

ASHOK SINGH JAUNAPURIA
Name
ASHOK SINGH JAUNAPURIA
PAN
XXXX661G
Email
ashok.singh@ssgroup-india.com
Mobile
9873434444
Landline
01244335100
Address
H. No. 43 Block B-4 SAFDARJUNG ENCALVE NEW DELHI -110029

Directors

SUSHIL SINGH JAUNAPURIA
Name
SUSHIL SINGH JAUNAPURIA
PAN
XXXX661G
Email
sushil@ssgroup-india.com
Mobile
9873333123
Landline
01244335100
Address
H. No. 43 Block B-4 SAFDARJUNG ENCALVE NEW DELHI -110029

Contact Details

Project ContactEmail: ssgroup.gurgaon@gmail.comMobile: 9811454047Landline: 01244335100
Project Contact PersonName: VIJAY PAL SINGHEmail: vijaypal@ssgroup-india.comMobile: 9811454047Landline: 01244335100

Land Details

Land Area12.61175 (Acre)
Proposed FAR349
Permissible FAR350
Total Licensed Land12.61175 (Acre)

Land Usage

Land Cost2815 Lakhs
Other Cost30947.34 Lakhs
Estimated Project Cost104312.71 Lakhs
Estimated Infrastructure Cost18717.48 Lakhs
Estimated Apartment Construction Cost51832.89 Lakhs

Total Infrastructure Expenditure

Infrastructure Total Expenditure

No total expenditure data is currently available for this project.

Quarterly Infrastructure Expenditure

2023 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres--51.65-
Electricity Supply System--47.5-
Electrification Cost----
Electrification cost----
Other--0-
Parks and Playgrounds--2.5-
Roads & Pavements--10.9-
Security and Fire Fighting----
Sewerage treatment & garbage disposal--29-
Shopping area--0-
Storm Water Drainage--12.5-
Street Lighting--7-
Water Supply System--36.5-
2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres--51.6551.65
Electricity Supply System--019
Electrification Cost----
Electrification cost----
Other--00
Parks and Playgrounds--0.50.5
Roads & Pavements--54.554.5
Security and Fire Fighting--7.17.1
Sewerage treatment & garbage disposal--00
Shopping area--00
Storm Water Drainage--00
Street Lighting--1.41.4
Water Supply System--00
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres51.6551.6551.6551.65
Electricity Supply System0000
Electrification Cost000250
Electrification cost----
Other0000
Parks and Playgrounds0.50.50.50.5
Roads & Pavements54.554.554.554.5
Security and Fire Fighting7.1000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Lighting1.41.41.41.4
Water Supply System0000
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres51.6551.65--
Electricity Supply System028.5--
Electrification Cost----
Electrification cost2500--
Other00--
Parks and Playgrounds0.50--
Roads & Pavements54.532.7--
Security and Fire Fighting----
Sewerage treatment & garbage disposal00--
Shopping area00--
Storm Water Drainage00--
Street Lighting1.40--
Water Supply System00--

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES AS PER APPROVED MAKE
WALL FINISHING DETAILSEXTERNAL- TEXTURE PAINT INTERNAL- OIL BOUND DISTEMPER
KITCHEN DETAILSGLAZED 600MM HIGH TILES ABOVE COUNTERLEVEL & BALANCE OBD
BATHROOM FITTINGSSINGLE LEVER CP FITTINGS WASH BASIN, WALL HANGING WC 9SUPER QUALITY)
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESSOLID HARDWOOD / UPVC FRAMES
GLASS WORKNA
ELECTRIC FITTINGSMODULAR TYPE
CONDUCTING AND WIRING DETAILSPVC CONDUITING WITH COPPER WIRING
CUPBOARD DETAILSNA
WATER STORAGECOMMON RCC OVER HEAD WATER TANK
LIFT DETAILS03 NOS PASSENGER LIFT AND ONE NOS SERVICE LIFT
EXTERNAL GLAZINGSUPVC FRAME WITH PLAIN GLASS
WINDOWS/GLAZINGSUPVC FRAME WITH PLAIN GLASS
DOORSSOLID FLUSH DOORS WITH ENAMEL PAINT SHUTTERS
MAIN DOORSSOLID DECORATIVE FLUSH DOORS
INTERNAL DOORSSOLID FLUSH DOORS WITH ENAMEL PAINT SHUTTERS
AIR CONDITIONINGSPLIT AIR CONDITIONER
ELECTRICAL FITTINGSMODULER TYPE
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMETEXTURE PAINT
INTERNAL FINISHINGACRYLIC EMULSION PAINT

Unit-wise Specifications

TOILET
FLOORANTI-SKID CERAMIC TILE
WALLSCERAMIC TILE
CEILINGOIL BOUND DISTEMPER
COUNTERSSTONE TOP COUNTER
SANITARY WARE/CP FITTINGSSTONE COUNTER TOP WITH SINGLE LEVER CP FITTINGS, WASH BASIN, WALL HUNG WC (SUPERIOR QUALITY FIXTURES)
FIXTURESSTONE COUNTER TOP WITH SINGLE LEVER CP FITTINGS, WASH BASIN, WALL HUNG WC (SUPERIOR QUALITY FIXTURES)
KITCHEN
FLOORANTI-SKID CERAMIC TILE
WALLSOIL BOUND DISTEMPER/TILES 2.0 HIGH
CEILINGOIL BOUND DISTEMPER
COUNTERSNA
FIXTURESSS SINK WITH SINGLE LEVER FITTINGS
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORVITRIFIED TILES
WALLS & CEILINGOBD
RAILINGSSS RAILING WITH FILLERS
FIXTURESNA
BED ROOMS
FLOORVITRIFIED TILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
WARDROBESNA
MASTER TOILET
FLOORANTI-SKID CERAMIC TILE
WALLSCERAMIC TILES
CEILINGOBD
COUNTERSSTONE TOP COUNTER
SANITARY WARE/CP FITTINGSSTONE COUNTER TOP WITH SINGLE LEVER CP FITTINGS, WASH BASIN, WALL HUNG WC (SUPERIOR QUALITY FIXTURES)
FITTING/FIXTURESSTONE COUNTER TOP WITH SINGLE LEVER CP FITTINGS, WASH BASIN, WALL HUNG WC (SUPERIOR QUALITY FIXTURES)
MASTER BEDROOM/DRESSROOM
FLOORVITRIFIED TILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORANTI-SKID CERAMIC TILES
WALLS & CEILINGOIL BOUND DISTEMPER / TEXTURE PAINT
TOILETANTISKID FLOOR TILE WITH CERAMIC TILES ON WALLS
BALCONYANTI-SKID CERAMIC TILES

Fee Details

Payment 1
amount:3581655
cheque no:465
draft date:03-06-2023
payable to:HRERA Gurugram
payee bank:KOTAK MAHINDRA BANK
Payment 2
amount:4658083
cheque no:52023062300792692
draft date:23-06-2023
payable to:HRERA Gurugram
payee bank:KOTAK MAHINDRA BANK(KK8KRS2023062300792692)